ViaBoat Power

Boat 1 · GitBoat v10.5 · 24 V DC distribution

Status notes
  1. Main bus plan Decided

    Main bus board plan v10.5. The Argodiode spot and the breaker relabels are Electronics plan 7.6. The jumper gauge is not picked. The 2026-10-06 bus drawing is the earlier sheet.

    Proposal, Pending 559: the two Argodiode jumpers are 12 AWG, and the short black backup-fed link is 12 AWG, at the next write-in. Electronics plan 7.6 still says 6 AWG. This page does not pick a gauge. Pending 561 still lists a short 6 AWG black on the installed board.

  2. Main bus changes Decided

    Pending 517: they draw what the guides already decided (Electronics plan 7.6 and A10; items 487, 489, 490, 501 (e) and (f)); nothing new is decided except Claude's picks below. Both of its shunts sit on the positive side, on the main bus board (sec 7.6). Pending 518, where the Argodiode and the backup-fed bar go, stays open and is not drawn.

    Electronics plan 7.6: the Argodiode sits in the open space right of the breakers and left of the minus branch bar, near the top, with the backup-fed bar pair standing below it. The top 5 A breaker labelled CAN is line 1's and comes off as a spare. The breaker labelled Aft is line 6 and is relabelled Switch. Line 15's 5 A breaker is on the backup battery board. The jumper gauge is not picked.

    Pending 517: both plans are 3 pages each: the photo with numbered marks; the wiring diagram after the changes, added 2026-11-03 at Mike's ask, "can you add wiring detail image?"; then every new or moved wire, the order of work and the parts. This plan's middle page is headed Main bus board: wiring, page 2 of 3, how it connects after the changes, not to scale, new and moved parts in green.

Power-only map (ethernet omitted). Pack to Class-T on the A9 aft wall, to the Blue Sea 6006, to the 400 A busbars. 24 to 5 V, Pi A only, on the main spine. Click a solid box to open the panel. Dashed boxes are passive. Heater deleted v9.5. Boat 1: single VESC A. Full map: Electronics · CAN · SOURCES.md

MAIN PATH · 2 AWG NOT LIVE Battery pack A9 · main bank Main fuse on the battery box aft wall (JIAKUPA kit). Passive, not a node page. Class-T 300 A on A9 aft wall Manual battery disconnect on the main bus board. The only mechanical switch aboard, for haul-out. Passive, not a node page. Blue Sea 6006 battery switch Two generic 400 A busbars. The 250 A MEGA is the motor branch. A 100 A MEGA feeds the 150 A bar. 400 A busbars 100 A MEGA to 150 A bar Battery-box heaters deleted at v9.5. Do not re-propose. heater deleted v9.5 · not live LOAD DROPS Central 24 V 15 A auto-reset VESC A feed 250 A MEGA · 2 AWG House branch 20 A auto-reset Pi A rail 24 to 5 V, Pi A only Wing box below deck · 24 V PACK SENSE STEERING EMERGENCY BANK Ewellix CAHB-22 20 A · power-cut BMS / SBMS0 A4 · pack sense Dyness 24V 100Ah. Powers Pi B. Not on the main 24 V spine. Emergency bank Dyness · Pi B feed Pi B rail 24 to 5 V, bank only SWITCHED LOADS Module 1 ch 8 spare 1 Starlink Science payload group, and the wet lab's own 24 V line (15 A, stud line 9, A3 entry 20). 2 Science 3 Nav lights 4 em-trak 5 Release 6 Bilge 7 Whites ch 8 spare MODULE 2 9 UV-C 10 Orion-Tr 11 Puller 12 Bilge 2 13 Horn HOUSE · 20 A always-on Mean Well DDR-120B-48 · 54.0 V TSW202 always-on PoE switch Stud 6 20 A auto-reset, always-on, to A6a. Downstream of the 100 A MEGA. Never a relay channel. Axis P1245 PoE · port 5 MAIN BUS BOARD - Electronics 7.6 Fifteen auto-reset breakers. Lines 2, 3, 4, 5 and 14 leave the backup-fed bar. Line 15 leaves the backup battery board. The others stay on the + 150 A branch bar (Mike 2026-09-28). Plan: Main Bus Board v10.5. Breaker 9, the wet lab, is 15 A. The other two breakers are on hand: a 15 A for the wet lab and a 5 A for Iridium A. Nothing left to buy. Breaker 1: CAN ctrl - 5 A 1 CAN ctrl 5 A Breaker 2: RelB - 30 A 2 RelB 30 A Breaker 3: Central - 15 A 3 Central 15 A Breaker 4: Rel A - 30 A 4 Rel A 30 A Breaker 5: Steer - 20 A 5 Steer 20 A Breaker 6: Network switch box only - 20 A 6 Switch box 20 A Breaker 7: Irid A - 5 A 7 Irid A 5 A Breaker 8: CAN house - 5 A 8 CAN house 5 A Breaker 9: Wet lab - 15 A 9 Wet lab 15 A Breaker 10: Pi A - 10 A 10 Pi A 10 A Breaker 11: Bilge 1 - 5 A 11 Bilge 1 5 A Breaker 12: hub box 24 V, feeds only the 12 V converter, not the hub 5 V - 5 A 12 hub 12V 5 A Breaker 13: Orion - 10 A 13 Orion 10 A Breaker 14: Wing - 5 A 14 Wing 5 A Breaker 15: Bilge 2 - 5 A 15 Bilge 2 5 A SOLAR CONTROLLERS - 2x100/20 + 3x75/15 Left to right (Electronics 7.6, Mike 2026-10-01): two 100/20 then three 75/15. Cold rule on 75/15 #1 only. 75/10 stays at A10. SmartSolar 100/20 #1 - 400 W, two 100 W pairs, 25 A fuse 100/20 #1 400 W SmartSolar 100/20 #2 - 400 W, two 100 W pairs, 25 A fuse 100/20 #2 400 W SmartSolar 75/15 #1 - 200 W, one 100 W pair, cold rule, 20 A fuse 75/15 #1 200 W cold SmartSolar 75/15 #2 - 200 W, stern port, 20 A fuse 75/15 #2 200 W SmartSolar 75/15 #3 - 200 W, stern starboard, 20 A fuse 75/15 #3 200 W SURGE - bus + PV Two battery-bus surge modules on 25 A blade fuses at the + solar bar (Compute Bay 14.1). Each charge controller gets its own PV surge module on a short DIN rail below it. MOV-class, no status contacts. Bus surge A - 25 A blade Bus surge A 25 A blade Bus surge B - 25 A blade Bus surge B 25 A blade PV surge x5 - per controller PV surge x5 per controller Emergency bank SmartSolar 75/10 at A10 (Dyness), not on the main board row. 75/10 emerg at A10 Dyness LEGEND power passive fuse / switch / busbar / breaker deleted (not live) clickable (opens panel)