Battery box

Hover · click · blue opens linked boxes · Main bank · GitBoat v10.5 A9 · Bus: none · Class-T on aft wall · no heaters

Status notes
  1. Box plan Decided

    Battery box plan. The Class-T stays on the aft wall. Both shunts stay on the positive side.

AFT WALL Heavy positive leaves through PG16, dips, and lands on the Class-T, then a sleeved 2 AWG run to the Blue Sea 6006.1 · 24 V+ Heavy negative leaves through PG16 to the - 400 A bar. Both of its shunts sit on the positive side, on the main bus board (sec 7.6), not in this box.2 · 24 V- Entry 3. JK balancer ENERJOUR 10-core. PG13.5.3 · JK Entry 3a. SBMS0 12-core and XT1. PG9.3a · SBMS0 Entry 3b. DS18B20 trunk straight to central node entry 18. PG9. Not through the BMS box.3b · DS18 Gore M12 on the top of the aft wall. Breathing inlet, not a cable gland.V · Gore JIAKUPA 300 A Class T bolted to the outside of the aft wall, mid-height on the + side.F · Class-T300 A · outside aft wall J not drilled G not drilled H not drilled 2 AWG 2 AWG taps · XT1 MAIN BANK · NOT A CAN NODE Eight cell groups in the sealed plywood battery box. Not a CAN node. 1 2 3 4 group of 4 group of 4 group of 4 group of 4 5 6 7 8 group of 4 group of 4 group of 4 group of 4 8 groups of 4 · 3/8 in closed-cell neoprene (Minicel LF200 dropped) 2 mm mica · okoume BS1088 / 1708 DS18B20 x6 + XT1 on cell faces · JK on 3, SBMS0 on 3a, DS18B20 on 3b FORWARD WALL 1-1/2 in Sch 40 PVC glassed through the FORWARD wall, duckbill inside.R · Relief stubduckbill · lips out A4 · AFT WALL, MINUS Bolted to the outside of a long side wall of the battery box, never inside it.Watchman (A4)SBMS0 + JK PG9 · sense CANH CANL power USB Ethernet UART I2C GPIO coax SPI RF (wireless) bundle