v10.5, 2026-11-09. The electronics of the Nobotic USV, the Cape Dory 25D conversion: every box and every hole through its walls, the wiring, the sensors, power distribution (the bus, its fuses and breakers), the emergency bank, the lights, the comms hardware (cameras, AIS, Starlink, Iridium, GPS), the CAN network, the two team-built release and monitoring nodes, the battery watchman's box and the parts to buy. The watchman is the small board that watches the battery and reports it; it controls nothing. The idea: two islands that share no wire. The main side (Pi A on the main battery) and the backup side (Pi B on the backup battery) meet only through light or a transformer, so one fault or one strike cannot take both. Every backup is there to keep the boat sailing: with the main battery dead, the backup battery still steers, trims the wing, pumps the bilge and releases the drogue. Where each fact lives. This plan: boxes, wiring, hole lists, sensors, power distribution, the emergency bank, nav lights and comms hardware. Compute Bay Housing and Wiring Plan: what is inside the two compute boxes, the watchdogs, the central node's relay map and command paths, and electronics cooling; it is the final word on the two-island layout, the lightning watch and the surge rules. System Settings Sheet: every setting, limit, threshold, timer and address. Bill of Materials: parts and prices. Wire and Cable Buy List: cables to buy. Battery Box Building Guide Part 8: the watchman's build. Wing Power System sec 1A: the wing's own electrics (the slip ring, the wing compass, the tip wind meter and the wing box).
| Part | What it holds |
|---|---|
| Sections 2 to 7 | The design |
| Section 8 | The buy list |
| Section 9 | Open questions: in Pending Amendments v10.6 |
| Appendix A | Every box and every hole |
| Appendix B | Order status |
Companion documents: Glossary; Design Decisions and Rationale (why); Node Boxes Explained (the wiring pictures); the Box Wiring Sheets (Box Wiring Sheets v10.5, one drawing per box); Compute Bay Housing and Wiring Plan; System Settings Sheet; Wire and Cable Buy List; Battery Box Building Guide; Lightning Ground System Guide; Steering System Handbook; the battery software notes (BMS Software Change Notes, Reference folder); Wing Power System; Serial and Network Summary (the port audit). Terms used here.
| Term | Plain meaning |
|---|---|
| Island | Gear fed from one battery, with no wire path to the other group |
| Node | A small team-built box with a microcontroller (a small computer chip) in it |
| CAN bus | The shared two-wire network the boat's devices talk over |
| Gland | A screw-in fitting that clamps and seals a cable entering a box |
| Drip loop | A sag in a cable, so water runs to the bottom and drips off |
| Ferrite | A clip-on magnetic collar that soaks up surge current riding on a cable |
| Staked | A dab of adhesive on a plug so vibration cannot walk it loose |
| De-energized-closed | A relay that passes current with no power on it, so a dead relay does not drop the load |
| Opto board | An input board that reads switch contacts across a gap of light, so no wire crosses |
| PoE | Power over Ethernet: the network cable carries the device's power as well as data |
| PoE class | What a PoE device asks the switch for (802.3af up to 15.4 W, 802.3at up to 30 W); the switch holds that much back, used or not |
| SFP module | Turns a switch's SFP slot into a port; the copper one gives an RJ45 jack, data only |
| Web API | The switch's own documented commands; the Pi uses them to switch a port on or off |
| SNMP | A standard way to read a network device's state; read-only on the TSW202 |
| H-bridge | A four-switch circuit that runs a DC motor either way; the steering drive is one |
| RS-232, RS-485 | Two wired serial standards: RS-232 is one device per cable, RS-485 a shared two-wire line |
| FTDI | Maker of the USB-to-serial chips this plan allows; each has its own serial number, so the computer can tell them apart |
| TVS diode | A surge diode: it clamps a voltage spike before it reaches the board |
| INA226 | A small chip that reads volts and amps on one feed |
| IMU | A motion sensor chip; with GPS track it gives heading |
| UART | A plain serial port on a chip |
| N2K | NMEA 2000, the marine CAN standard the em-trak speaks |
| Isolated | Of a converter or adapter: its two sides share no wire, so a surge or a ground shift on one side cannot pass to the other |
| Slip ring | Sliding contacts that pass wires across a turning joint; here, the wing's turning joint |
| Wing box | The small box below the deck where the wing's wires enter the hull; the slip ring's wires land in it (A17) |
| Main side, backup side | The main battery and everything it feeds; the backup battery (the emergency bank, A10) and everything it feeds |
| Backup-fed bar | The small bar pair on the main bus board for the five lines that must keep working when the main battery is dead (sec 7.6) |
There is no section 1.
The Pi A and Pi B boxes: the CXCESNS 11.8 x 8.3 x 3.9 in aluminum boxes on hand. What goes inside them, how they mount and how they stay cool: Compute Bay Housing and Wiring Plan secs 2 to 4. Every hole: A1 and A2 here. The watchdogs' parts (the watchdogs themselves: Compute Bay Plan secs 4.1 to 4.3). WD-A sits in the Pi A box and WD-B in the Pi B box; none of this adds a box hole. Each holds its Pi's 24 V feed, ahead of the Pi's 5 V converter, through the normally closed contact of a 5 V 1-channel relay module (AEDIKO): coil off means Pi on, so a dead Nano leaves its Pi running. Each watchdog's own 5 V (the Nano, the relay coil and the input side of its optocoupler) comes from its own Pololu D36V6F5, ahead of the relay, so the relay never cuts it. The alive line and the VESC kill line cross on HiLetgo PC817 optocoupler boards. WD-B reads the lightning detector straight on its pins, with no level shifter (A12), and never cuts Pi B's power for lightning.
Compute Bay Plan sec 3.3.
Compute Bay Plan sec 3.4, and its USB rule in sec 4.1.
Pi B is through-bolted to the settee panel and Pi A is glued to the hull: Compute Bay Plan secs 2.2 and 2.3. Plastic boxes: sec 7.4 here.
Compute Bay Plan sec 3.5.
Compute Bay Plan secs 2.3, 2.4 and 3.6, with the pass/fail heat test. Three boxes are glued to the hull for cooling: the Pi A box, the VESC A box (its floor is the motor controller's cooling plate, A7) and the network switch box (Compute Bay Plan secs 2.3 and 4.4).
Inside: Compute Bay Plan sec 4.1. Every hole: Appendix A1. Its bond stud wires the box to the lightning copper.
Inside: Compute Bay Plan sec 4.2. Every hole: Appendix A2.
The backup converter that feeds the backup-fed bar from the emergency bank is transformer isolated (sec 7.6), and Pi B's own wing adapter is isolated (A2 entry 4), so neither ties the two islands together. Same cabin, a few feet apart, is fine. The rules and why: Compute Bay Plan secs 5.2, 6 and 7.
Compute Bay Plan sec 4.1: one 4 TB NVMe SSD and the Hailo-8L in the carrier's two M.2 slots, nothing on USB.
Every box but the two Pi boxes: what it holds, its CAN bus and its wall holes. Each box's full hole list is in Appendix A.
| Box | What is in it | Bus | Holes (glands unless noted) |
|---|---|---|---|
| Central node (near the battery, busbars and compute boxes; switches loads, triggers the releases) | Sec 4.1, A3 | Control | 20 and the vent, none on top: 1 to 16 on the bottom wall (14 not drilled), 17 to 19 on the right wall, 20, 21 and the vent on the left wall; no spares drilled |
| Release Node B (stern, near the transom boxes) | Sec 4.2, A15 | House bus end | 4 |
| Wet lab box (beside the wet lab, outside its drip tray) | Switches each wet lab pump and valve and reads the wet lab's sensors (A18) | House | 3: three split glands, all on the bottom wall |
| BMS box, "the watchman box" (as bought, bolted to the outside of a long side wall of the battery box, never inside it) | Sec 6.7, A4 | None (USB to the hub box) | 4 |
| Network switch box (aluminum, at the stern, glued to the hull for cooling, not wired to the lightning copper) | The TSW202 switch, its 54 V supply and the SFP module (A6a) | None (always-on 24 V on line 6, which feeds only this box) | 10: 9 RJ45 couplers and one PG9 |
| Network surge board (not a box: a small board on a bulkhead near the deck, where the outside network cables first come inside) | The five Ethernet surge protectors and the small tinned bus bar for their grounds (A6a; Lightning Ground System Guide sec 7.4) | None | None: the cables plug into the protectors |
| USB hub box (small, beside Pi A) | The USB hub (fed from Pi A's 5 V), its 12 V converter and surge diode, the dAISy, the science serial adapters and the wing's two readers, all on hub ports (A1a) | None (one USB lead to Pi A) | 3, all on one side wall: two large split glands with a small gland between them |
| Iridium A box, Iridium B box | A11 | None (each modem's own USB cable to its Pi, through a USB isolator, sec 6.5) | 3 each |
| Detector mini-box | A12 | None (a 5-wire lead to WD-B) | 1 |
| VESC A box (VESC B box: BOAT 2 ONLY; Boat 1 sails with one VESC) | The Flipsky and the extra bus capacitors, in a CXCESNS aluminum box, 11.8 x 8.3 x 3.9 in, its floor glued to the hull as the controller's cooling plate, wired to nothing (A7) | Control | 8 |
| Battery box | Battery Box Building Guide. No brain inside. Not fitted, do not re-propose: heater feeds, gas-sensor leads (A9) | None | 5 glands + vent + relief stub |
| Starlink Mini (no box) | Bare on the aft deck, IP67 with its cables plugged in; expendable, its Ethernet through a surge protector on the network surge board (A6a). No heater; do not re-propose (A13) | None | None: no box |
| Wing box (small, plastic, below the deck where the wing's wires enter the hull: the TICONN 5.9 x 5.9 x 3.5 in, A17) | The hull end of the slip ring: its eight wires land here, each through a fuse or surge part at its entry | None: the trim actuator keeps its own short CAN link, off both buses, to the CAN adapter in the USB hub box, and Pi B's own adapter joins that link here (A2 entry 4) | 6 (A17): four PG9 and two PG7, all on the bottom wall |
| Native devices, no drilling | em-trak (house, channel fails to ON); the Ewellix steering actuator, a plain DC device on the central node's drive, not a bus device (A14) | Tee + drop each |
Not on Boat 1, do not re-propose: an aft junction box (each cable runs in one piece between the central node and its device, A6), the transom terminal box (the release cables run straight from the central node to the stern, A16), and an FSESC box on either boat (A5). Box count. Seven plastic boxes: the central node, Release Node B, the wet lab box, the BMS box, two Iridium boxes and the detector box. Four aluminum boxes: the two compute boxes, the network switch box and the VESC A box. Small boxes besides: the USB hub box, the MOTU M2's own box (not picked, A1a), the PoE light driver's dry box (sec 6.4) and the wing box (A17). Only the central node carries a membrane vent (Gore-type, M12 screw-in, 1/2 in hole, high on a box wall), because its BME280 barometer reads outside pressure through it. Every other electronics box is sealed, with no vent and no vent hole: the boxes sit in a dry cabin, so their glands stay dry, and a sealed box keeps its desiccant pack working longer. The battery box keeps its own breather and relief stub (A9).
The two team-built nodes that trigger the drogue releases; the central node also drives the steering, switches the loads and reads the battery probes. The circuit is the release channel steps (Compute Bay Plan sec 10.3) put onto screw-terminal boards. No soldering on the boat, no soldered field wires, and no push-on jumper pins anywhere in release logic. One-time soldering at the workbench is allowed before burn-in and before anything is installed: a board may get its terminal blocks soldered on (Mike, 2026-09-27). Every solder link on each Nucleo stays as shipped (Mike, 2026-11-09). After that every logic line between a Nucleo and a relay, MOSFET (a transistor switch) or opto board lands under a screw terminal or a latched connector. One exception: the CAN board's soldered 4-pin logic header at the central node and at Release Node B keeps its pins and takes a ready-made plug, zip-tied on (sec 4.1; Mike, 2026-11-08). Each Nucleo is staked in its screw carrier after burn-in (a bench run that finds early failures).
The plastic box near the battery, busbars and compute boxes. Its holes: A3. The base:
Release channels (the channel steps: Compute Bay Plan sec 10.3). The release bus has its own feeder, 12/2 on a 30 A breaker on the backup-fed bar (line 4, sec 7.6), so with the main side dead the backup converter still feeds the cord pullers and horn A. Then the enable relay, then per channel a MOSFET switch module to the burn wire (channels 1 and 2) or the puller motor (channels 3 to 6).
Cord puller reversing relays, for shore tests (the test and the lock rule: Compute Bay Plan sec 10.3). Each of the four pullers runs through its own 24 V DC DPDT reversing relay here (two switches that move together; MY2NJ type, 8-pin, with LED, rated 10 A; Amazon B0GY3ZM4YB, $9.49 each, four), in a screw-terminal DIN socket, nothing soldered. It swaps that motor's two wires. All four coils run from relay channel 11, "reverse", with no diodes across the coils (channel 11 is a relay contact, not a chip). No extra wires aft: the release cables' core count (A3 entries 11 to 13) does not grow. Bench checks:
Cord puller fire guard (on the plus side, Mike 2026-10-30). One slow-blow 5 x 20 mm glass fuse per puller, in a screw-terminal DIN fuse holder on this box's rail, between the release bus and the puller's reversing relay input. There it also blows when a chafed + core touches its cable's shield, whose drain sits at 0 V. Without it each puller's thin wires sit behind the release bus's 30 A breaker alone, and a short or a hot stall could heat them. Each pull runs a set time, with no stall sensing (System Settings Sheet sec 5).
Outputs and their fuses. Every switched output runs in one piece straight to its load, no box between, through a slow-blow 5 x 20 mm fuse in a DIN holder on this box's rail, right after its relay contact. Twelve DIN-held fuses in all: the eight in the table (five outputs, F1, F2 and F4) and the four puller fuses. The horn's 5 A fuse is a separate inline one. Parts, both on hand (prices: BOM sec 15.7): the QBGTFAK slow-blow 5 x 20 mm fuse kit, 0.5 to 10 A (Amazon B09685NBKH), and a MECCANIXITY DIN rail fuse holder pack (how many came in it is not in the order mail; count the pack): twelve holders here and five in the wet lab box (A18), seventeen boat wide.
| Channel | Load | Fuse | Leaves by |
|---|---|---|---|
| 1 | Starlink Mini's power, to its DC input (A13) | 5 A | 16/2, A3 entry 5 |
| 2 | The wet lab's own line, to the wet lab box (A18, split gland C) | None: its own 15 A breaker upstream | 16/2, A3 entry 6 |
| 3, normally closed | Bow lantern, through F4 and then the bow lantern's 12 V converter here | F4, 1 A | 12/2 offcut to the bow, A3 entry 7 |
| 3, normally closed | Stern light | F2, 1 A | Post lights cable, A3 entry 17, port a |
| 4 | em-trak | 2 A (the B921 averages 135 mA and peaks at 2 A at 12 V, published; about half that at 24 V, inferred) | 16/2, A3 entry 8 |
| 6 | Bilge pump 1's manual-on | 5 A, the same as the pump's own breaker | Bilge cable, A3 entry 9 |
| 7 | The motoring whites' 12 V converter here (sec 6.4) | 0.5 A (the two whites draw about 1.5 W; raise it to 1 A only if the converter's switch-on trips 0.5 A) | Post lights cable, A3 entry 17, port a |
| 9 | Camera port UV-C | 0.5 A, the smallest in the kit (the LEDs draw about 20 mA) | A3 entry 15 |
| 10, 11 | Orion-Tr remote on/off (A3 entry 16); "reverse" for the pullers | None: inside the cabin, a few milliamps | - |
| 13 | Horn, its coil driven from the expander pin PB3 (channel 12's pin, so channel 12 has no driver) | 5 A inline | About 15 ft of 16 AWG pair to the horn low on the instrument post (Instrument Post Guide sec 3), A3 entry 18 |
| 8, 12 | 8 spare; 12 has no driver; no fuse | - | - |
| - | Post wind meter, off this box's 24 V, ahead of its own Pololu regulator (below) | F1, 1 A | Its own cable, A3 entry 17, port b |
The three 16/2 runs each have their own PG9 gland, sealant-filled. Nothing leaves this box on channel 3 unfused. Why fuse the outputs: a short on an unfused output trips this box's own 15 A breaker, and channels 3, 4 and 9 fail ON, so the short would come back at every reset and lock the node out. Relay modules. Two 24 V 8-channel relay modules, plus two HiLetgo 24 V 30 A single-channel modules: the release enable relay (above) and the steering power-cut relay (sec 5.6). Channel 5 of the first 8-channel board is a spare. The second module is probably on the shelf already (Bill of Materials sec 15.8). The channel map is the Compute Bay Plan's (sec 11); this plan, the Box Wiring Sheets and the lid labels follow it. No photocell relay; the TSW202 is on no channel (sec 6.1). Trigger jumpers: on every HiLetgo module, here, at Release Node B and in the wet lab box, set the trigger jumper (the small black cap on the 3-pin header marked L and H), then hold it with a dab of removable silicone, as on the harness plugs, so vibration cannot walk it off. A jumper that falls off leaves the relay's trigger undefined. Inputs. Each comes in on its own cable, in one piece from its source, with no box between. Wind data and light power stay in separate cables.
Pump 1's manual-on joins its + terminal after its Water Witch, with no diode (Mike, 2026-09-28): the Water Witch runs the pump with the node dead, and shore can run it for a set time. Pump 2 runs from the backup battery; its manual-on and running line are on Pi B's side (A10). Monitoring. Two DS18B20 chains: chain 1 the six battery probes, chain 2 compartment air. A BME280 barometer breakout on the I2C chain (the box breathes through its membrane vent, so it reads outside pressure). A humidity breakout. Nothing else. The cell-temperature trip on chain 1 is the battery trip; its levels, rate rule and release: System Settings Sheet sec 4; the rule: the battery software notes (Reference folder) sec 4. Not fitted, do not re-propose: branch current meters, MOV or SPD status contacts (every clamp is metered at each refit and at the post-strike check), a VE.Direct reader, a high-water sensor anywhere, gas sensors. Post wind sensor. The Calypso ULP CMI1018 (UART/I2C), wired straight to a Nucleo UART, no level chip; it draws 0.25 mA, so the cable run costs nothing. Its own Pololu D36V6F5 regulator (5 V out, 50 V max in) sits in this box behind F1; put its terminal block on at a workbench, off the boat, then pot it. The meter is on only while this box's feed is on. Never 24 V into either Calypso meter: both take 3.3 to 18 V and their inputs carry clamping diodes, so 24 V destroys them. 5 V, not 12, because the meter's serial data may swing to its supply rail (Calypso's manuals do not give the data level). The CMI1017 RS-485 unit at the wing tip is the backup wind meter; its wires come down through the slip ring to the wing box (A17). The two light converters (sec 6.4): the bow lantern's and the motoring whites' YRDZXG 24 to 12 V converters sit in this box. If the box has no room, the two sealed converters (wire leads) sit on the hull right beside it. Open: whether the two light converters fit inside the node box; laying out the node settles it.
A second, physically separate release chain at the stern: its own 12/2 feeder on a 30 A breaker on the backup-fed bar (line 2, sec 7.6), its own enable relay and MOSFET pairs, the same two-conditions interlock, commanded over the house bus. Each drogue box's two release channels split across the nodes, one triggered from the central node and one from Release Node B, through separate glands on separate routes. Either channel alone cuts the strap. One dead box cannot remove every release on the boat. Release Node B's live channels are exactly the two drogue B-horns, on boxes 1 and 2: five Nucleo pins. Inside, and every hole: A15. It stays on the house bus and the main side. With the main side dead the backup converter feeds it through line 2, and either computer can trigger either horn, one at a time, with steering paused for the burn (sec 7.6, release feeders).
Node addresses, message IDs, release channels, relay channels, probe serials, I2C addresses and opto inputs are printed on each lid and recorded on the System Settings Sheet sec 9. Node Boxes Explained has the drawings. This table is the final word on the release-channel map. Node Boxes Explained, the Box Wiring Sheets, the Compute Bay Plan, lid labels and firmware message names all follow it. Release channels are not the relay module's channels (sec 4.1). Command words: the two-step is ENABLE then RELEASE; status wording is "channel N released".
| Channel | Action | Central node | Release Node B |
|---|---|---|---|
| 1 | Drogue box 1 lid strap | Horn A (3 coils) | Horn B (3 coils) |
| 2 | Drogue box 2 lid strap | Horn A (3 coils) | Horn B (3 coils) |
| 3-6 | The four JSD cord pullers on the T8 trigger cords: BRINGSMART 24 V worm-gear motors with pulleys; each through its own reversing relay and fuse in the central node (sec 4.1) | All four | - |
| 7-9 | RESERVED, BOAT 2 ONLY: the aux-rudder release (solenoid 1, solenoid 2, burn wire). Unwired on Boat 1 | (Boat 2) | - |
| 10-15 | RETIRED on Boat 1 (the six steering pull-pin paths; Boat 1 has no pins). BOAT 2 ONLY: Boat 2 keeps one pull-pin, on its primary actuator, so a dead actuator can let the rudder trail for the aux rudder; its release paths (two from the central node, one from Release Node B: Steering System Handbook sec 9.5) get channels when Boat 2 is wired | - | - |
| 16 | RETIRED. Every wing-trim failure ends in feather by passive means, so no trim-linkage decouple pulse, no channel and no gland. Number not reused | - | - |
The boat's two CAN buses: the control bus (steering, motor, releases) and the house bus (everything else), their cable, layout, power and who sits on which. Then the steering drive, which hangs off the central node.
NMEA 2000 Micro-C (M12 A-coded 5-pin), 120 ohm: a twisted shielded data pair plus a 22 AWG power pair in one jacket. Pre-molded cordsets only, cut once for drops; no field-made connectors.
One straight backbone per bus, stubs under about 3 ft. Never a star, never a ring. CONTROL BUS: [terminator] -- [4-port: Pi A, Pi B] -- VESC A -- central node [END] HOUSE BUS: power tee [END] -- [4-port: Pi A, Pi B] -- em-trak tee -- wet lab box tee -- Release Node B tee [END] (VESC B drop and the Electrak tee: Boat 2 only)
The control bus has no power tee: the 4-port tee's free end takes the terminator plug (sec 5.3).
The control bus carries no power. Nothing on it draws from the pair: the Waveshare 2-CH CAN FD HAT powers its own isolated CAN side (a B0505LS-1W isolated power module and an SI8642ED isolator on its parts list, waveshare.com), the central node's CAN board runs off the Nucleo's 3.3 V, and VESC A's CAN port takes no power. So it has no breaker, no 16/2 run, no converter and no power tee (line 1 has no breaker, sec 7.6). On every control drop the red (power) core is cut back and taped at both ends. The black core lands on the device's CAN ground as the ground reference: each Pi HAT's G terminal, the central node's 0 V and VESC A's CAN GND. The house bus: 12 V, fed in once. A 5 A breaker at the main bus board (line 8, sec 7.6), 16/2 at 24 V to one sealed 24 to 12 V 5 A (60 W) YRDZXG converter at the compute multiport, and 12 V a couple of feet on to the house power tee beside the house 4-port tee, so 12 V never wanders across the boat. The em-trak's bus interface draws from it. 12 V is inside the NMEA 2000 window of 9 to 16 V, so any ordinary NMEA 2000 device can be plugged in later; 24 V would kill nearly all of them. Never feed bus power from inside a Pi box, so a Pi A fault cannot darken a bus; hungry loads have their own feeds. Sizing: about 6 W needed, buy 60 W.
Check at fit-out that the em-trak takes its main power on relay channel 4, with only its bus interface on the pair (if it draws more from the pair, the house bus peaks near 2 A, still inside 60 W), and that nothing on the pair wants 24 V (the em-trak takes 9.6 to 31.2 V). Micro-C parts are 60 V rated. Both buses run at the one bit rate (System Settings Sheet sec 9). The TSW202 is not fed from the pair.
| Device | Bus | Why |
|---|---|---|
| VESC A, central node (which drives the Ewellix steering actuator) | Control | Steering, release channels, motor. Nothing non-essential goes on it |
| em-trak, Release Node B (bus end) | House | So no single bus failure strands both release nodes (VESC B is Boat 2 only). The em-trak's own GPS is Pi A's second position source, and its AIS targets reach Pi B in command over this bus (sec 6.2) |
| The wet lab box (A18) | House | Science, not steering: nothing non-essential goes on the control bus |
| Viatrax Primelink A | House, a listen-only tap | A separate monitoring and black-box path (Build Guide sec 8.3) |
| Pi A, Pi B | Both | Only the Pis touch both |
| The wing's trim actuator (Thomson Electrak MD) | Neither: its own short CAN link through the slip ring (A17). Pi A reads it through a USB to CAN adapter in the USB hub box (A1a), Pi B through its own adapter in the Pi B box, used only when Pi B is in command (A2 entry 4) | Kept off the boat's two buses; both channels of each Pi's CAN HAT carry those buses |
| The battery watchman | None (sec 6.7) | It controls nothing; its stream reaches Pi A over USB |
The rules. Each device has one CAN port and lives on exactly one bus. Only the Pis touch both, and cross-bus information moves through Pi software, so a babbling device, likeliest on the house side, cannot delay steering or throttle traffic. BOAT 2 ONLY: the house bus also carries the backup VESC with its phase-transfer contactor, and the Electrak steering actuator (J1939) rides the control bus, its own overload cut-out the backstop. Island rule. No emergency-bank device on either bus except through an isolated transceiver, which is Pi B's HAT.
NMEA 2000 (em-trak), VESC's own frames and ours from the two nodes share the wire fine; the Pi's software handles each. No J1939 (a truck and machinery CAN protocol) on the hull buses. The only J1939 aboard is the wing's trim actuator, the Thomson Electrak MD, on its own short CAN link through the slip ring (A17). BOAT 2 ONLY: the Thomson Electrak HD adds J1939 to the control bus, so the VESC takes a controller ID clear of any J1939 address (System Settings Sheet sec 9), and the two boats share one software build.
How the central node drives the rudder actuator: the drive, its wiring, the power-cut relay and the two rudder angle readings. The primary rudder. The steering actuator is the Ewellix CAHB-22-F4E-3000529-BAA0PT-000, bought: a plain 24 V DC actuator, 2,250 lbf (10,000 N), 11.8 in stroke, 0.4 to 0.5 in/s, a self-locking screw (it holds position unpowered, no brake), built-in position feedback, no CAN. Full data: Steering System Handbook; settings: System Settings Sheet sec 3. How Pi A and the node command it, the angle cross-check and the jam logic: Compute Bay Plan sec 10.2. The drive: one Pololu G2 High-Power Motor Driver 24v13 (Pololu item 2992), , $79.99, ordered, in the central node. It takes 6.5 to 40 V (the bank peaks near 29 V) and runs 13 A with no heat sink, against the Ewellix's 8.5 A working and 10.9 A at clutch trip; moves are short and at most 20 percent of the time. It takes 3.3 V logic straight from the Nucleo and has its own current-sense output, so there is no separate current sensor. The bigger 24v21 (item 2995, same size and pins) also fits if it turns up.
Bench work, off the boat, before burn-in: solder on the two 5 mm power terminal blocks that come with it, and one 8-way 0.1 in screw terminal block on the logic row (Hxchen 8-pin, 20 pack, , on hand). After that every wire lands under a screw. The steering feed is 14/2 on its 20 A breaker (sec 7.6); if it will not fit the 5 mm blocks, land it on DIN terminals and run short 14 AWG jumpers. Wiring (A3 entries 3 and 4). Read the pin names off the board.
| Wire | Goes to |
|---|---|
| 24 V from the steering breaker (entry 3) | A DIN terminal, then the power-cut relay's closed contact, then G2 VIN |
| G2 GND | The node's 24 V negative, on its own 14 AWG return |
| G2 OUTA and OUTB | The Ewellix red and black (entry 4) |
| PWM, CS, GND, DIR | D9, A0, Nucleo GND, D13 |
| SLP | Tied to 3.3 V (always awake) |
| FLT | An expander input. The G2's fault output is open-drain, so it takes a pull-up. Open: the pull-up's value; the G2 manual settles it |
| Ewellix feedback brown, white | 3.3 V, GND |
| Ewellix feedback green (the wiper) | Through a 1k resistor (from the 1/4 W kit on hand) under DIN terminal screws, to A1. No capacitor: the firmware averages the readings |
Steering power-cut relay. One of the six HiLetgo 24 V 30 A single-channel relay modules bought (three 2-packs; three have jobs: this relay, the central node's release enable relay and Release Node B's enable relay; three are spare), in series with the Ewellix feed ahead of the drive, wired de-energized-closed, its coil on an expander output. A dead node, a dead driver or a broken wire leaves the actuator fed. Cutting a jammed or runaway actuator takes a live node; a failed drive usually fails stuck on, and this relay is then the only stop. Rudder angle is read two ways: encoder A on the stock (an AS5048A magnetic encoder; the node reads its PWM output, a pulse-width signal, on one timer pin) and the actuator's own position feedback. Either reading may steer when the other fails, and they cross-check while both work. A stall stop is retried after a pause, so one false trip cannot end steering (the cross-check and the jam logic: Compute Bay Plan sec 10.2). Boat 1 steering has no backup actuator, accepted on purpose (Mike, 2026-11-01). With the main side dead the steering feed (line 5) comes from the backup converter through the backup-fed bar (sec 7.6). Bench test (Steering System Handbook sec 7, bench step 3): full stroke both ways logging current and wiper; chock the rod and see the stop within about 1 s; pull the Nucleo's power mid-move and see the rod stop; an hour of cycling at 20 percent duty, then feel the board. Rod-travel life: Ewellix publishes none (Reference/Ewellix CAHB Series Catalogue.pdf), so rod travel sets no move budget (the voyage's rod travel, and why no travel limit is quoted: System Settings Sheet sec 3). The deadband (the small rudder error the boat ignores) is a software number (System Settings Sheet sec 3); no halved-move plan.
The boat's eyes, radios, lights and working sensors: what each is, where it sits and how it is wired.
| Camera | Where | What it watches | Status |
|---|---|---|---|
| Foredeck fisheye | Glued-on G10 pad on the foredeck | Up and forward at the wing, rig and foredeck | A 360 degree outdoor PoE fisheye: Hanwha XNF-8010RV, bought (open box, $132); wired PoE on an RJ-45 plug from the TSW202 (Bill of Materials sec 15.8) |
| Forward and aft post cameras | High on the post, on glued-on 1/4 in G10 pads tabbed with two layers of biax (fiberglass cloth); nothing through the tube wall | Forward: ships and ice. Aft: the post base and boot, transom, drogue bridle, rudder head | The two Reolink RLC-520A domes, on hand |
| Interior camera | Inside the cabin | The compute boxes, battery box and bilge | The first Reolink FE-P (an indoor unit), on hand (Bill of Materials sec 15.8). Indoor-rated: never on deck |
| Underwater camera | Angled epoxy-glass through-hull tube low on the hull | The prop hub and rudder | Axis P1245 Mk II modular sensor head, received |
One Cat6 each (outdoor Cat6 on deck). The two post cameras, the foredeck fisheye and the interior camera each pass an Ethernet surge protector on the network surge board near the deck (A6a; Lightning Ground System Guide sec 7.4). IR LEDs off (System Settings Sheet sec 5), no trigger wires. Post mounting: Instrument Post Guide (nothing through the tube wall; one bond spur, a short wire to the lightning copper, per metal body; cables in their own glands with drip loops).
The underwater camera also trends fouling and watches the shaft collar anode. It looks through a JGS2 fused-quartz window kept clear by 275 nm UV-C light; the head swaps afloat through the inboard cap, and its dry main unit inside takes the PoE. It is ISOLATED, never wired to the lightning copper: plain UTP Cat6, shield broken at the camera end, off the anode circuit. Build: Underwater Camera Port Guide. Camera port UV-C lights. On trial (three on hand, from eBay): small 275 nm UV-C LEDs on round aluminum boards 0.39 in (10 mm) across, above and below the lens on a flat mask in front of the camera face. Check each is real UV-C with the QuantaDose UV-C test card before building. Each board gets two wires, soldered once at the bench, from an LM317 current regulator (on hand), starting at 20 mA with a 62 ohm set resistor. The regulator is fed through the normally closed contact of central node relay channel 9 (A3 entry 15; the on and off times: System Settings Sheet sec 5). Not fitted: the two Seoul star boards, which do not fit beside the camera head in the 1-1/4 in bore. The mask, the mount and the build: Underwater Camera Port Guide. Open: whether to have a factory-made board built for the same layout, carrying four name-brand UV-C LEDs soldered by the maker; Mike's go settles it. One network switch on the boat: the Teltonika TSW202, eight PoE ports and two SFP slots, with its 54 V supply and the SFP module in the network switch box at the stern (A6a), where every network cable ends. The five Ethernet surge protectors are not in that box but on a small board near the deck (A6a). Not fitted: the Netgear GS308EP and GS305EP, and any switch inside the Pi A box.
| Port | Device | Power |
|---|---|---|
| 1 to 5 | The five cameras | PoE |
| 6 | The PoE light driver, which runs both interior disc lights (sec 6.4) | PoE |
| 7 | Pi A | data only |
| 8 | Pi B | data only |
| SFP 9 | Starlink, on a copper SFP module (10GTEK SFP-T, two bought) | data only |
| SFP 10 | Free |
Bench checks before the loom (Build Guide sec 11.1):
Hardening rules, all pass/fail:
Two separate receive chains, each on its own antenna, so no single antenna fault deafens both. Not fitted, do not re-propose: a third chain, the RTL-SDR listener and its whip.
The transmit whip lives under the panel-free deck patch, stood as near upright as headroom allows. No AIS antenna above deck.
The Starlink Mini sits bare on the aft deck, with no box: it is IP67 with its cables plugged in (Mike, 2026-11-02: "no box for starlink"). Ethernet to the TSW202 (SFP port 9, sec 6.1), a standard RJ45 plug in the Mini's own latching port, greased and taped with self-fusing tape (A13). Power on relay channel 1, its own 16/2 from the central node (A3 entry 5) through a 5 A slow-blow fuse there (sec 4.1), to the Mini's DC input (it takes 12 to 48 V on a DC5521 barrel plug). Expendable, but its Ethernet passes an Ethernet surge protector on the network surge board near the deck (A6a; Lightning Ground System Guide sec 7.4). No heater (do not re-propose: the dish has its own snow-melt heater). Open: how the power joint to its DC input is made, and what holds the Mini down. Deck hole: the instrument post's 1 in PVC deck stub. The GPS and Iridium A coaxes and Starlink's Cat6 and power pair come below through it with the post bundle (A13; Instrument Post Guide sec 8). Not fitted: four separate 1 in standpipes and their compression deck seals. Iridium B keeps its own deck hole (sec 6.5).
The nav lights, the motoring whites and the interior lights: what turns each on, and how each is fed.
Lights and AIS on the backup battery alone. With the main side dead the central node runs from the backup converter (sec 7.6), so its light and em-trak channels still work. Nav lights: dusk to dawn whenever the backup battery is above its steer level. The em-trak: on whenever the backup battery has power to spare, day or night, off when it does not; it keeps the converter and the node on, roughly 6 W in all (a guess), about 150 Wh a day, so in practice it runs in the trades and not in winter. Each time the node powers up on the converter it keeps its fail-ON channels (nav lights, em-trak, UV-C) off unless wanted. The levels: System Settings Sheet. Open: whether the em-trak's bus interface works with the main side dead, since the house bus's 12 V (line 8) is on the branch bar, not the backup-fed bar; the em-trak's manual settles it. The bow lantern and the two whites run at 12 V. Both kinds are TRUE MODS 12 to 24 V lights, the bus sits at 27.6 V charging and up to 29.2 V, and TRUE MODS gives no upper limit. So each gets 12 V from its own converter in the central node (sec 4.1): two of the YRDZXG 24 to 12 V 5 A (60 W) sealed converters on hand, one after the bow lantern's fuse F4 and one after channel 7's fuse for the two all-round whites (input 12 to 32 V, from the listing, inferred for this size). The TRUE MODS stern light (9 to 33 V) takes the bus as it is, through its fuse F2. A dead converter darkens only its own lights; channel 3 still fails ON. Not fitted: series diodes to drop the voltage (easy to fit the wrong way round; Mike, 2026-10-30). The two attwood bi-colors are 12 V only and come off the boat. Draw figures: Instrument Post Guide. How each light is fed. Every light fuse and converter is in the central node, or the two converters on the hull beside it if the box has no room (sec 4.1):
TRUE MODS sealed LED lights; no Hella (do not re-propose). All five TRUE MODS lights are on hand; the layout uses four (the bow lantern, the stern light and the two all-round whites), so one is an extra, and nothing more is bought. Their USCG certification, ranges and heights on the post: Instrument Post Guide. Check that each light's body carries "USCG" and its distance; the stern light must be marked for 2 miles. Budget about 30 Wh per night. Interior lights. The PoE Texas AT-LED-24V kit: one PoE-powered driver and two 4 in LED disc lights, on TSW202 port 6. The driver is a bare board, so it lives in a small dry box of its own; its Cat6 comes in on one bulkhead jack, taped like every other (A6a). It has no current limiter: do not add a third light. The discs are dry-location parts; mount them where no condensate collects and no drip can land in them. They light the interior camera for colour, which infrared cannot give.
Two satellite modems, one per island, each wired to its own Pi only: modem A near Pi A (main bank, always on), modem B near Pi B (emergency bank, always on). Box, holes and the cable joins: A11. Each coax runs straight to its quarter-wave stub arrestor (a short coax stub that shorts a lightning surge to ground but passes the signal). The stub is the only coax protection, because a stub cannot wear out. How each modem reaches its Pi (plans Box Plans v10.5/Iridium A Box v10.5.pdf and Box Plans v10.5/Iridium B Box v10.5.pdf, .pdf to print). Each RockBLOCK talks to its Pi on the cable it came with: the FTDI TTL-232R-3V3 USB to serial cable with the RockBLOCK's 10-pin plug, its USB to serial chip molded into the USB plug.
Antenna domes (Instrument Post Guide): one clear acrylic dome per antenna on a white base plate, rubber gasket, oversize holes and snug screws, a 5/64 in (2 mm) weep hole at the flange low point. A sits aft beside the post, its coax down through the post's deck stub (sec 6.3). B sits on the foredeck about 18 ft forward with its own small deck hole, so the two chains share no dome, deck hole, cable or fuse. Each dome sits where no solar panel shades it and it shades no panel.
Antennas: each receiver has its own, on separate spots: one on top of the pylon, one on a deck pad near the post, clear of the post's boot (Instrument Post Guide). The four AEDIKO waterproof active GPS antennas bought go with the GPS boards and suit the deck pad; the NEO-7M pack's own four antennas become shop stock (Claude's reading). No arrestor and no bias tee on either GPS coax (the rule and why: Compute Bay Plan sec 14.1). The protection is the two separate chains (different receivers, antennas and boxes), the ferrite at the wall, the low cost of the receiver, and Starlink's own position fix as a cross-check.
Two boards in the BMS box as bought (A4), bolted to the outside of a long side wall of the battery box, neither of them inside the battery box: the Electrodacus SBMS0, the watchman, and the JKBMS JK-B2A8S balancer. They watch and control nothing: no load, no charger. Their build, the taps and the probes: Battery Box Building Guide Part 8; the settings: System Settings Sheet sec 1. Its USB stream to Pi A is required: the battery percentage comes from it, because the SBMS0's pack shunt is the only battery current sensor aboard. Both of its shunts sit on the positive side, on the main bus board (sec 7.6). The base board has no data port, so the stream needs the Electrodacus WiFi/USB add-on board (ordered). Its USB lead goes to the USB hub box (A1a) and reaches Pi A on the hub's own lead (A4 entry 4, A1 entry S). No CAN, no RS-485 from the BMS. The serial reader, the stream-gone-quiet alert and "no charge for a solar day" are required software (the battery software notes, Reference folder): a quiet stream loses the battery percentage. The DS18B20 probe chain never enters the watchman box: its trunk leaves the battery box by its own gland (A9 entry 3b) and runs straight to central node entry 21, where the cell-temperature trip lives (sec 4.1). Each battery box signal cable has its own gland, because two cables of different size do not seal in one gland, sleeved or not (A4, A9). The probes' places, the trunk and its splices: Battery Box Building Guide Part 8. Charging is always on; there is no charge stop (do not re-propose; why: Design Decisions R-4.1B and R-4.1E). Nothing in the wiring stops a charger. Not fitted:
The node's Pi-silence timer only turns the nav lights on. Each charger's RX pin stays at its default (System Settings Sheet sec 1). The only charge ceiling is the five controllers' lithium profiles (System Settings Sheet sec 1); above 90 percent the Pi spends surplus on the prop (Build Guide sec 4.1). Cold or hot pack. No automatic stop. Pi A alerts shore when a pack probe reads cold or hot. On the cold-pack alert and on the cell-temperature trip the computer in command runs the motor at about the solar output, so the battery's net current stays near zero, except while the drogue is out or in STORM (what the boat does: Build Guide sec 4.1; the levels: System Settings Sheet secs 1 and 4; Battery Box Building Guide, "The cold, and no heaters"). Open: nothing cuts the bank off on the trip; settled in the single-point review. Heaters: not fitted, do not re-propose. None on the battery box, and none on the wing, which has no packs.
The sensors the boat steers and guards itself by. The science instruments are in the Science Payload Strategy; the IMUs and the working barometer also feed science. Each row names where the wiring and settings live.
| Sensor | Part | Where, and how it is read |
|---|---|---|
| IMU x3 | Bosch BNO085 (three bought; all three fly) | IMU A1 and IMU A2 in the Pi A box, on the same I2C pair (a short chip-to-chip data link), A2 at the chip's second address, one at each end of the plate, as far from the 5 V converter as space allows; IMU B in the Pi B box (Compute Bay Plan secs 4.1 and 4.2). Each has a forward arrow on its plate, a heading offset and roll and pitch level offsets (System Settings Sheet). If A1 and A2 disagree past a set limit (System Settings Sheet), Pi A falls back to the GPS track and gyro, flags it and sends an alarm home. Uses: heading, fused with the GPS track; tilt correction for the post wind sensor; yaw rate for the steering loop and the rudder-fault detector; heel, knockdown and inversion detection, the growler impact signature (Build Guide sec 3.9A) and STORM-entry triggers; wave spectra |
| GPS x2 | u-blox NEO-7M, one per island (hiBCTR modules, bought; the other two of the 4-pack are Boat 2 stock) | Separate antennas (sec 6.6); position only, accurate to a few yards. GPS B serves Pi B only; Pi A's second position source is the em-trak's own GPS (sec 6.2). Heading comes from the IMUs and the track. The Starlink dish's own GNSS (over its local gRPC API) is logged as a cross-check. Iridium gives only a rough Doppler position |
| Wind, post (PRIMARY) | Calypso ULP CMI1018 ultrasonic (UART/I2C), bought | On the post's aft arm, level (Instrument Post Guide); its own cable to the central node's UART, 5 V from its own Pololu regulator there (sec 4.1; A3 entry 17, port b). Tilt-corrected off Pi A's IMUs. Not fitted: the Airmar 200WX ($1,700); do not re-propose |
| Wind, wing tip (cross-check) | Calypso ULP CMI1017 ultrasonic (RS-485, NMEA 0183), bought | On a short arm ahead of the wing-tip nose, upwind of the tip rod (Wing Construction Guide). Its RS-485 pair comes down through the slip ring to the wing box (A17) and on to the Waveshare 2-channel RS-485 reader in the USB hub box (A1a); its 5 V is made at the tip (Wing Power System sec 1A); 24 V destroys it. Turned into the boat frame through the wing angle from the wing compass. Sacrificial in a strike. It stays as the backup wind meter if the post is lost |
| Wing compass (wing angle and turn rate) | WitMotion HWT905 compass and gyro, RS-485 version, IP67, bought, on a G10 pad on the wing's tip cap (Wing Power System sec 1A) | Its gyro's turn rate feeds the active rate damper (Build Guide sec 6.4); its heading minus the hull's heading gives the wing angle, which turns the wing-tip wind into the boat frame. Its own RS-485 pair comes down through the slip ring to the wing box (A17) and on to the same Waveshare reader, on its own channel (A1a). It runs on 24 V (9 to 36 V, under 40 mA; it does not run on 5 V), from the tip branch's 24 V on its 1 A fuse, ahead of the tip's 5 V converter |
| Barometer | BME280 breakout on the central node's I2C chain (zero Nucleo pins) | The working barometer, read over CAN from the node, which breathes through its membrane vent, so it reads outside pressure. No weather pod and no AK09918 compass on the post. The science barometer is separate (Barometer and Pressure Port) |
| Cameras x5 | Sec 6.1 | Sec 6.1 |
| Forward thermal camera | Uncooled LWIR (FLIR Lepton 3.5) | Cape Horn version only (sec 6.1) |
| Battery temperature x6 | DS18B20, 1-wire chain 1 | Six pack probes (none at the motor jacket, bearing or shaft). The cell-temperature trip runs on this chain (sec 4.1; its levels: System Settings Sheet sec 4) |
| Rudder stock encoder | Magnetic absolute (AS5048A) | True blade angle, on its own lead to the central node (sec 5.6; A3 entry 17, port c), cross-checked against the Ewellix's own feedback. A permanent twist in the stock sits below the encoder and shows only as a lasting helm bias; the rudder camera watches for that (Build Guide sec 3.8) |
| Steering telemetry | At the central node | The Ewellix position feedback, the drive's own current sense (sec 5.6), the power-cut relay state and encoder A agreement; no J1939. For jam detection and screw-wear trending. Boat 2: the Electrak's own position and overload reports over J1939 |
| Battery watchman | Electrodacus SBMS0 (USB text stream, required) | Sec 6.7. It reports 8 group voltages, min/max and spread, pack current, total solar current, SoC (state of charge, the battery percentage the load-shed schedule uses, from the pack shunt), pack temperature and a status word, sent to shore a few times an hour. A quiet stream is an alert: shedding falls back to a fixed cautious schedule |
| Bilge | Water Witch 230-24 on pump 1; a Johnson Pump Ultima Switch 36303 on pump 2, its sensors sealed so they never touch the water (A10) | Pump 1's 24 V pump output reads as "pump running" through the central node's opto board (sec 4.1; A3 entry 9). Pump 2's running line goes to Pi B's side: WD-B watches it and wakes Pi B at once (A10). Staged switching is hardwired; pump state, duty cycle and rate-of-rise go to shore (Build Guide sec 3.6) |
Not fitted, do not re-propose:
How cables cross box walls and join, how they are kept from salt and lightning, and how the power is split, fused and protected.
Every box entry is a nylon IP68 gland (IP68: dust-tight, good under water), as bought. No brass, no nickel-brass.
| Gland | For | Drill |
|---|---|---|
| PG7 | One cable of 1/8 to 1/4 in | 1/2 in |
| PG9 | Small bundles; each 16/2 run, one per gland (A3 entries 5, 6 and 8) | 5/8 in |
| PG11 | Actuator bundles | 3/4 in |
| PG13.5 | Paired harness entries; the balancer's 10-core tap cable (A4 entry 1, A9 entry 3) | 13/16 in |
| PG16 | 2 AWG (the VESC feed and the battery mains) | 7/8 in |
| PG21 | The VESC A box's three motor leads, their own lugs uncut (A7) | 1-1/8 in |
| Split gland (Altelix PG25 pre-terminated, 4- or 5-port) | Cables that keep their plugs: USB leads, the AIS coax, the Iridium USB cables (A1, A1a, A2, A4); and round cables with bare ends going to one box, such as the USB hub box's four sensor lines (A1a) and the post and rudder cables at the central node (A3 entry 17). Each port seals on a round cable 0.15 to 0.30 in (4 to 7.6 mm) across, never an oval duplex jacket (one exception, as built: the wet lab box's 16/2 feed, A18); a port not used takes its plug. A cable lays into its slit seal from the side, so no plug is cut off | 1-3/16 in (30 mm) |
Two small same-route cables may share one gland a size up, gaps between the jackets filled with sealant. Fast cure is fine; a filled gland cures before the salt-spray test. The same for any oval jacket (the 16/2, 14/2 and 12/2 duplex): a round gland insert does not close around it, so every gland that takes duplex is sealant-filled, with the boat's Berkland 4000 UV (sec 8, Sealant). Grouping is allowed only for cables on the same route to the same box, serviced together. Two cables of different size do not seal in one gland, sleeved or not: give each its own gland. Never for release circuits, mains, or cables arriving from different directions. Current grouped entries: none. The three release cables to the stern (A3 entries 11, 12 and 13), each switched-load 16/2 (A3 entries 5, 6 and 8) and the bow lantern's 12/2 (A3 entry 7) each have their own gland.
The M12 disconnect is on the cable, outside the box: at a tee for CAN, at the molded male-female coupling of a cut cable for point-to-point runs. Female on the box side of the joint, male on the cable, boat wide.
Mix 31 ferrites on the cables that run outside the cabin, to soak up a nearby strike's surge. Genuine mix 31 only: Fair-Rite 0431 series or Palomar 31-xxx; no-name kits are the wrong material for lightning, which lives below 30 MHz. Only on cables that leave the cabin (Mike, 2026-10-14). A long wire up the post, across the deck or down from the wing picks up the surge from a nearby strike; a short cable between cabin boxes picks up almost nothing, and a direct strike goes down the lightning copper, where no clip-on core matters. A cable with its own surge protector (the cameras, Starlink's Ethernet, the solar strings) needs none. One ferrite per cable below, outside the box it enters, just below the entry, sized to the cable; about 11 boat wide.
| Cable | Box | Core ID |
|---|---|---|
| GPS A coax | Pi A (A1 entry 11) | 0.30 in |
| GPS B coax | Pi B (A2 entry 9) | 0.30 in |
| Iridium A and B antenna coax, one each | each Iridium box (A11) | 0.30 in |
| Post wind meter cable, post lights cable | central node (A3 entry 17, ports b and a) | 0.30 in |
| Horn pair up the post | central node (A3 entry 18) | 0.30 in |
| Bow lantern cable (the 12/2 offcut) | central node (A3 entry 7) | to fit the flat 12/2 (likely wider than 0.30 in, inferred; measure the jacket) |
| Each of the three hull cables from the slip ring (the cable: Wire and Cable Buy List C4) | wing box (A17) | 0.30 or 0.5 in |
None on any other cable: not on the motor phase leads (too short for the clamp), not at the BMS box, the battery box, the USB hub box, the release nodes or on the runs between the cabin boxes. On hand: the order log shows 15, 4 and 1 of three Amazon ferrite listings, at least 20 cores; none to buy. The 1.0 in phase clamp bought is not used. A ferrite must never hang on a cable: one swinging below a gland wears the cable at the gland lip. Glue the core to the bulkhead or settee structure just below the box, with 3M 4200 on the sanded shell, cable through it with a little slack each side (one of the two places 4200 is used on the boat; sec 8, Sealant). Or lay a small cable's two-pass loop against the structure, or, where a box has room, tie a small core down inside on the plate. Keep ferrites off the hull skin and away from the lightning straps. A cable clamp on a glued-on pad a few inches below each box supports the drip loop.
The home for the main bus, its fuses and breakers, every branch, the backup-fed bar, the solar controllers and the bus surge modules. The surge rules: Compute Bay Plan sec 14. Peak currents. The motor at 2,000 W and 25.6 V: about 78 A sustained, and about 180 A for a bounded CUT-BURST (Build Guide sec 5.3). Combined solar: about 50 A new (1,400 W at 27.6 V), about 35 A at the mid-mission planning output. The 300 A Class T at the bank is the hard ceiling. The main fuse is the 300 A Class T from the JIAKUPA kit ($22, bought), bolted to the outside of the battery box's aft wall at mid-height on the + side, not on the main bus board. The + main lands on it from its gland, and a sleeved 2 AWG run goes on to the Blue Sea 6006 battery switch on the main bus board, so the whole run is protected. It stays in series through every override; a CUT-BURST at about 180 A does not trouble it. Not fitted: a Blue Sea 5119 (do not re-propose). Mounting steps, and the care if its bolts go through the wall: Battery Box Building Guide Part 8. Not yet measured: room on the wall for the 4.8 x 2.0 in fuse block, its cover and the cable bend. Three rules for the mains at the fuse:
Clamp both mains a few inches from the fuse block so they do not tug on it; torque the fuse stud nuts and paint a witness stripe across each. The motor branch takes a 250 A MEGA fuse under the main fuse, at the busbar. The main bus is two generic 400 A busbars with four 3/8 in studs each (bought); each main branch leaves through a MEGA fuse in its own holder (four holders bought). The main bus board sits on the hull side beside the battery box. The only mechanical switch aboard is the manual battery disconnect (the Blue Sea 6006) for haul-out servicing. Not fitted, do not re-propose: a Victron Lynx anywhere; a main-BMS bypass contactor (the bank runs through no BMS gate, so there is nothing to bypass; the Class T stays the short-circuit protection). The watchman's two shunts sit on the positive side. The SBMS0 reads a shunt only with 4 to 76 V on it, so on the negative side it would read nothing (its manual, Reference/SBMS0 v03d Manual.pdf).
Fuses and breakers, not a breaker panel (a panel is dead weight with contacts to corrode). Every small branch that can be an auto-reset breaker is one: 24 V stud-type auto-reset breakers (they trip on heat and reset as they cool; bought), landed on 150 A bar pairs, so a short glitch cannot leave a load dead for the mission. That covers the house CAN power tee (5 A), both bilge pumps (5 A), the box feeds (Pi A 10 A, the central node 15 A, the network switch box 20 A), the releases, Iridium A, steering and every other line in the stud table below, and the backup battery board's loads, Pi B, Iridium B, bilge pump 2 and the backup converter's input (A10). A fuse that blows on a passing fault leaves that function dead for the mission; a breaker comes back. Blade-fuse blocks and most inline holders are out. Bench trip-test every breaker at about twice its rating, and hold rated current for minutes without tripping. Mount high, terminals down under the covers, drip loops. Still fused:
The backup converter's input is on a 20 A auto-reset breaker, not a fuse (A10). Fuse sizing rule (no crew to replace a blown fuse). Size every fuse below its wire's current rating and at the next standard size above the true worst-case continuous load plus margin, not the minimum, with time-delay types where there is inrush. Never oversize past the wire rating: a fuse that will not protect the wire is worse than none. Which lines share a bar stud. Eight lines leave the + 150 A branch bar, each through its own breaker. Five more leave the backup-fed bar beside it, each keeping its own breaker: lines 2, 3, 4, 5 and 14. Line 15, bilge pump 2, leaves the backup battery board (A10). Line 1 has no breaker; its spot on the branch bar feeds the backup-fed bar's Argodiode. The line numbers stay as they are.
| No. | Line | Stud | Breaker | Wire | Good to |
|---|---|---|---|---|---|
| 1 | No breaker: the control CAN bus takes no power (sec 5.3); its 5 A breaker comes off the board and is spare. Its spot feeds the Argodiode, which feeds the backup-fed bar (below) | Line 1's spot: the Argodiode's jumper | - | 6 AWG, about 15 in, in split loom (below) | - |
| 2 | Release Node B (stern) | Backup-fed bar | 30 A | 12/2 | 12 ft (4 percent at 25 A, fine for burn wires) |
| 3 | Central node | Backup-fed bar | 15 A | 16/2 | 18 ft |
| 4 | Release bus A (central node: the cord pullers and horn A) | Backup-fed bar | 30 A | 12/2 | 9 ft (12/2 to match Release Node B) |
| 5 | Steering (central node) | Backup-fed bar | 20 A | 14/2 | 10 ft |
| 6 | Network switch box, its only load (breaker label: Switch) | 6 | 20 A | 16/2 | 16 ft |
| 7 | Iridium A | 7, alone | 5 A | 16/2 | any |
| 8 | CAN house bus (its converter) | 8 | 5 A | 16/2 | 90 ft |
| 9 | Wet lab, its one 24 V converter | End | 15 A | 16/2 | 22 ft |
| 10 | Pi A box | End | 10 A | 16/2 | 22 ft (at about 4 A) |
| 11 | Bilge pump 1 (through its Water Witch) | End | 5 A | 16/2 | 22 ft |
| 12 | USB hub box (A1a) | 8 | 5 A | 16/2 | 45 ft |
| 13 | Orion feed (the Orion-Tr is on the backup battery board, A10). Always on the branch bar, never on the backup-fed bar | 6 | 10 A | 14/2 | 27 ft (computed from the 16/2 figure) |
| 14 | Wing box, for the slip ring (A17) | Backup-fed bar | 5 A | 16/2 | 34 ft |
| 15 | Bilge pump 2 (through its Ultima switch, A10) | Backup battery board, its spare breaker spot (A10) | 5 A | 14/2 (from the roll on hand) | about 35 ft (computed from the 16/2 figure) |
How each size is set: the smallest that passes both checks.
Where each line goes. Four go into the central node (lines 3, 4 and 5, and the wet lab's line 9 through relay channel 2); seven go straight to their own box or device; line 8 feeds the house bus converter, line 11 runs through Water Witch 1 to pump 1, and line 15 runs from the backup battery board through the Ultima switch to pump 2 (A10). The node switches the Orion-Tr by a 16/2 or 18/2 pair on its remote terminal (A3 entry 16); the Orion-Tr's power does not pass through the node. Breakers on the board as built (Mike's photo, Reference/Main Bus Board Mockup Photo 2026-09-28.jpg; plan Box Plans v10.5/Main Bus Board v10.5.pdf): thirteen, read from their colors (clear 5 A x6, red 10 A x2, blue 15 A, yellow 20 A, khaki not yet read, green 30 A x2). The two green are the release breakers; the khaki one is steering if it reads 20 A. The other two are on hand: a 15 A for the wet lab and a 5 A for Iridium A. Nothing left to buy. Read every rating before wiring. On the board (Mike's photos, 2026-10-31): the top 5 A breaker, labelled CAN, is line 1's and comes off the board as a spare; the one labelled Aft is line 6: relabel it Switch; line 15's 5 A breaker (bilge pump 2) is on the backup battery board (A10). Release feeders: 30 A breakers; a 30 A breaker holds a 25 A burn for 60 seconds without tripping. Both feeders are 12/2: release bus A to the central node, near the board; Release Node B to the stern, 10 to 12 ft. A's path goes on from the central node through the 14/4 release pairs, about 10 to 12 ft, while B's release wires are short, so the two lose about the same at the coils, about 1.1 to 1.2 V (under 5 percent) at 25 A on the feeder and 12.5 A per horn (Claude's working), fine for burn wires. Both leave the backup-fed bar (lines 2 and 4), so on the main side each also loses the Argodiode's 0.3 to 0.45 V. Releases go one at a time. The burn-wire bake-off confirms the current (Transom Drogue Box Guide sec 9). The drogue on backup power. A horn burns 12.5 A (three coils, 4.2 A each) and cuts in under a second (Transom Drogue Box Guide sec 5); the 25 A above is both horns at once. With the main side dead, either computer triggers horn A (release bus A, line 4) and horn B (Release Node B, line 2, which stays on the house bus and the main side) from the backup converter, one horn at a time, with steering paused for the burn. The cord pullers run from release bus A the same way: they draw far less than the converter's 17 A, and four 64-second runs use about 2 Wh. The backup battery board keeps its 30 A ANL (A10). The 100 A MEGA feeding the small branches stays 100 A. The fourteen breakers add to 180 A, but the worst case that draws at once is about 78 A:
Pump 2's breaker in that sum is on the backup battery board (A10), so the real figures are a little lower. Releases go one at a time, never both at once (Compute Bay Plan sec 10.3); both would make about 103 A, still under a slow MEGA fuse's opening point of roughly 110 percent of its rating. Not fitted, do not re-propose: 4 AWG and a 150 A fuse. The link from the 400 A bar to the 150 A bar pair is 6 AWG, good for roughly 100 to 120 A in tinned marine cable, so 150 A would leave it unprotected; 100 A also opens on a partial fault such as a 110 A chafe. The backup-fed bar (on the installed main bus board, with no new fuse; Mike, 2026-11-01). Its spot (Mike, 2026-11-08: "yes to the Argodiode spot"): the open space right of the breakers and left of the - branch bar, the Argodiode near the top and the backup-fed bar pair standing below it, its - bar a few inches from the - branch bar. The bar pair is the second set of the two 150 A bar sets bought Oct 15, on hand. A small bar pair carries the five lines that must keep working when the main battery is dead or cut off, each on its own breaker as in the table: line 2 Release Node B (30 A), line 3 the central node (15 A), line 4 release bus A (30 A: the cord pullers and horn A), line 5 steering (20 A) and line 14 the wing box (5 A). Its minus bar is joined to the - branch bar (inferred: the five loads share the main side's 0 V). It has two feeds, each one way:
Working on the installed main board: before work near the incoming 2 AWG, lift one end of the 300 A Class T at the battery box, since with only the battery switch off the incoming 2 AWG and the switch's input stud stay live beside it; close it last. New parts go on with screws no longer than the board is thick. Drawing: the Main Bus Board Changes plan (Box Plans v10.5/Main Bus Board Changes v10.5.pdf; photo Reference/Main Bus Board Photo 2026-11-03.jpg). The whole board once the changes are done: Box Plans v10.5/Main Bus Board v10.5.pdf. The backup converter: a Victron Orion-Tr Smart 24/24-17 isolated (ORI242440120; 400 W, 17 A; Amazon B07YN4LGR9; not the plain B07DQ5SCQM, not the non-isolated ORI242440140), backup battery in, main side out. Transformer isolated, so the two islands stay apart, and a short on the main side cannot pull down the backup battery board's 30 A ANL: the converter limits its own current. Why: Design Decisions R-4.3A.
Open: its exact cutoff and restart voltages; settled from Victron's manual. BOAT 2 ONLY: a second fuse path from the main bank. A short 6 AWG from the + 400 A bar through a spare MEGA holder and a 100 A MEGA to the Argodiode's input and line 13, so a blown 100 A branch fuse does not cut steering, the wing, the drogue or backup charging off from a full bank. Line 13 stays ahead of the Argodiode, never on the backup-fed bar. Not on Boat 1: its main bus board is finished and installed. Steering feed: a 20 A breaker. Twice the Ewellix's 10.0 A rated current covers brushed-motor inrush and still protects the actuator's own 14 AWG red and black motor pigtail (its current figures and its built-in heat switch: System Settings Sheet sec 3). The house CAN bus feed: its 5 A breaker (line 8), then 16/2 to its 24 to 12 V converter at the compute multiport (sec 5.3). The control bus takes no feed. The wet lab feed: one steady 24 V converter (bought, $49.99). Line 9 has its own 15 A breaker, so it never trips on the converter's start or a full 10 A output; 16/2, switched by central node relay channel 2. It feeds one potted buck-boost converter (it steps the voltage up or down as needed, so its output holds steady however the bank's voltage moves): 9 to 36 V in, a steady 24 V out, 10 A (XWST, Amazon B097CYG8HG, the 24V-10A option), inside the wet lab box (A18), which switches each load.
Solar controllers on the main bus board, five: 2x Victron SmartSolar 100/20 then 3x SmartSolar 75/15, left to right. The one SmartSolar 75/10 is the emergency bank's (A10). The panels and where they sit: Build Guide sec 4.4. Voc is the open-circuit voltage. The cold figure is at -4 F (-20 C) panel temperature, worked from Renogy's -0.25 percent per degree C for its rigid ShadowFlux (the flexible's figure is not published):
| Controller | Panels | Nameplate | Voc at 77 F | Voc at -4 F | Output at 27.6 V |
|---|---|---|---|---|---|
| 100/20 no. 1 | two 100 W pairs | 400 W | 67.2 V | ~75 V | 14.5 A |
| 100/20 no. 2 | two 100 W pairs | 400 W | 67.2 V | ~75 V | 14.5 A |
| 75/15 no. 1 | one 100 W pair (cold rule below) | 200 W | 67.2 V | ~75 V | 7.2 A |
| 75/15 no. 2 | one 200 W, stern, port | 200 W | 44.1 V | ~49 V | 7.2 A |
| 75/15 no. 3 | one 200 W, stern, starboard | 200 W | 44.1 V | ~49 V | 7.2 A |
| 75/10, emergency bank | the two 50 W in series | 100 W | 45.2 V | ~50 V | 3.6 A |
A pair is two 100 W panels in series; pair panels that sit side by side where the layout allows, so both see the same shade. The most on one controller is 400 W, 14.5 A at 27.6 V, inside a 100/20's 20 A. Two pairs on one controller make 7.3 A of short-circuit current, inside every input, and need no fuse of their own. Never put three pairs on one controller. Cold rule for 75/15 no. 1. A 100 W pair reaches about 75 V at -4 F panel temperature, a 75/15's limit; past it the controller can be damaged. A 100/20 takes 100 V, and a lone 200 W panel stays near 49 V, so only this one controller is at risk. At sea neither boat's route comes near that cold. Ashore, on any night forecast below 20 F, take the PV leads off 75/15 no. 1 (PV first); the others can stay connected. The five solar branches are fuses, in sealed holders at the + solar bar, within a few inches of it, each controller on its own 14/2 from its fuse: 25 A on each 100/20 and 20 A on each 75/15, about 1.25x each controller's capped output.
Wiring a 75/15: terminals left to right BATT +, BATT -, PV -, PV +, LOAD -, LOAD +; leave LOAD empty (the loads live on the busbars). BATT runs on 14/2 duplex tinned (a 25 A fuse protects 14 AWG, and 2 ft loses under 1 percent), PV on 16/2 or bigger (16/2 is good to about 25 ft; the 12/2 left on the roll does as well), BATT to the solar busbar pair through the 20 A fuse on the positive. Connect the battery first and PV last; to take one out, PV first, battery last. Never leave PV connected with the battery disconnected: the controller is not built to survive it. Heat sink ground screws: leave them empty (Mike, 2026-10-06). Each SmartSolar has a ground screw on its black heat sink. The case is isolated from the battery and PV terminals, so a ground wire there is optional, and on this boat it would add a second path for strike current next to the battery bus's one bond wire (Lightning Ground System Guide sec 7). Nothing goes on it on any of the five. Surge modules at the bus (the rules: Compute Bay Plan sec 14.1). The battery bus takes two surge modules of one class.
Surge parts elsewhere (Compute Bay Plan sec 14.1):
The voltage a strike induces in a circuit grows with the area the circuit encloses and how close it runs to the down conductors, so routing is the first lever against lightning (Compute Bay Plan sec 14.2):
What the Bill of Materials (BOM) does not say: where each part goes, and what is on hand or still to buy. Prices and status: the BOM section named on each line. Purchase records: the order tracker, BOM v10.5 Order Status.xlsx; returns are on its "Send back for refund" tab.
Full list with links: the Wire and Cable Buy List (A1 to A4).
Open questions for this guide are in Pending Amendments v10.6.
Every box on Boat 1: where it sits, what feeds it, what is inside, and every hole through its walls. The box plans are the sheets to build a box from: one 4-page PDF per box in Box Plans v10.5/ (parts with photos, the layout, the wiring diagram, every wire), named <Box> v10.5.pdf, plus Box Plans Cross Check v10.5.pdf, Main Bus Board Changes v10.5.pdf, Backup Battery Board Changes v10.5.pdf and SBMS0 Setup and Shunt Wires v10.5.pdf; sources _v105_work/box_plans/. For all of them:
Where: inboard aft of the settee, glued to the hull below the waterline, back face flat to the hull and no entry in that face; at least 2 ft from the main battery and motor cables where space allows, for the IMUs (a guess at a safe distance). Bus: both. Inside: Compute Bay Housing and Wiring Plan sec 4.1, with desiccant and a humidity breakout, the two IMUs A1 and A2, one at each end of the plate (sec 6.8), and Iridium A's USB isolator (entry 7). No load current passes through the box except its own feed and the hub's 5 V lead (entry 12). Its power path: the 10 A breaker (entry 1), then inside: TVS, the terminal strip, WD-A's relay, the Mean Well DDR-60L-5 converter (5 V 12 A, 18 to 75 V in, isolated, on a short DIN rail in the power section at the far end of the plate from the IMUs; output set to 5.1 V, output negative tied to input negative), then the carrier. WD-A's relay (normally closed, sec 2) sits in the 24 V feed ahead of the converter. The USB hub's 5 V lead takes off the converter's output on a 3 A inline fuse (entry 12). The safe-mode wire runs inside the box from a WD-A output pin to Pi A header pin 37 (GPIO26), through a 15k and 22k resistor pair so the Pi sees about 3 V, not 5 V; no box hole (Compute Bay Plan sec 4.1). Pi A's motor kill pin, when it is assigned, must not use pin 37.
| # | Entry | Through | Hole |
|---|---|---|---|
| 1 | Main 24 V feed, 16/2 on its own 10 A auto-reset breaker at the 150 A bar (end stud, sec 7.6; 6 A breakers come in 12 V only); oval 16/2, sealant-filled (sec 7.2) | PG9 | 5/8 in |
| 2 | CAN control drop, from the multiport (shield drain to bond stud): black core to the HAT's G terminal, red core cut back and taped (sec 5.3) | PG7 | 1/2 in |
| 3 | CAN house drop, from the multiport | PG7 | 1/2 in |
| 4 | VESC A UART throttle + GPIO kill: one Micro-C cut in the middle, glanded both ends; never shares a CAN cable. The kill line leaves WD-A through a PC817 optocoupler board inside (its V2 on the kill core, its G on the ground core), to the VESC's servo plug PPM pin, and shares the UART ground core, which lands on the servo plug's GND (A7) | PG7 | 1/2 in |
| 5 | (not drilled: Iridium A comes in at entry 7) | - | - |
| 6 | Link to Pi B: the alive discrete only (cut Micro-C; a PC817 optocoupler board inside) | PG7 | 1/2 in |
| 7 | Iridium A's RockBLOCK USB cable in, USB plug on (A11), to its DSD TECH SH-G01A USB isolator inside this box, which plugs into Pi A's second USB port, so a hung hub cannot cut off the main satellite link. The isolator is tied down and staked under the USB rule. Never the cable straight into the Pi (sec 6.5). Shares the split gland with entry S | Split gland (with S) | - |
| 8 | Ethernet to the TSW202 in the network switch box (A6a; switch port 7); outside face taped (A6a) | RJ45 coupler | per part |
| 9 | (not drilled: the Starlink run goes to the TSW202) | - | - |
| 10 | (not drilled: Pi B runs to the TSW202) | - | - |
| 11 | GPS A coax (no arrestor, no bias tee; check SMA, not RP-SMA) | SMA F-F | 1/4 in |
| 12 | The USB hub's 5 V lead out: a short 16 AWG 2-core lead from the Mean Well's 5 V output, on its 3 A inline fuse inside this box, ending in a DC barrel plug in the hub's barrel socket in the hub box (A1a) | PG7 | 1/2 in |
| 13, 14 | (not drilled) | - | - |
| S | The hub's USB lead from the USB hub box (A1a), to Pi A's other USB port; no USB isolator (A1a). S and 7 share one Altelix PG25 4-port split gland (on hand), two ports plugged, so both USB plugs pass whole (sec 7.1). Nine holes + bond stud; room remains under the 14-hole cap | Split gland (4-port) | per gland |
| B | Bond stud 1/4-20 | 1/4 in |
The small box that holds the boat's USB hub and what hangs on it: the science readers, the AIS receiver, the battery watchman's lead and the wing's two readers. Plan: Box Plans v10.5/USB Hub Box v10.5.pdf (where the parts sit, the wiring, and every wire from and to); Box Wiring Sheet A1a. Built 2026-10-22 and installed; where the drawings and the build differ, the build stands. The box: a TICONN IP67 box with a clear hinged lid, two steel latches and a grid mounting plate, standing upright with the lid facing out; about 12 x 8 x 5 in (inferred: most likely one of the three TICONN boxes of the 2026-08-16 order; scaled off the StarTech hub, 7.8 in (198 mm) long, it is about 10 x 7 in inside). It keeps its 12 V converter (Mike, 2026-11-04: "its already in there"). Bus: none: one USB lead to Pi A, the hub's own (A1 entry S). Powered from two feeds:
The hub: the StarTech USB210AIND, a 10-port industrial USB 2.0 hub, 5 to 24 V in on a barrel jack or a terminal block (bought).
What hangs on the hub:
Also in the box:
Not fitted, do not re-propose: the DROK 24 to 5 V converter bought for the hub (the hub runs off Pi A's 5 V); a USB isolator on the hub's own lead, which with one shared 5 V supply would isolate nothing; a fuse on the 12 V converter; a relay to cycle the hub alone. If the hub drops off, Pi A tries a USB reset first, and if the hub stays gone it stops its heartbeat on purpose, so WD-A cycles Pi A and the hub together (software repo). Rules.
What crosses its wall (as built, Mike's photos, 2026-11-04): three glands, all on one side wall, two large split glands with a small gland between them; none on the top or bottom wall. Each split port seals on one round cable 0.15 to 0.30 in (4 to 7.6 mm) across (Altelix's page). Open: which cable takes which gland; a look at the box settles it.
| Cable | Notes |
|---|---|
| The hub's USB lead out to Pi A | A1 entry S |
| The wing box to hub box cable in (A17) | The Cat6 on hand, 0.225 in across, to the Waveshare reader's screws |
| The SBMS0's USB lead in from the BMS box | A4 entry 4 |
| The dAISy's coax out | The lower split gland; its UHF plug and the taped joint sit outside the box (sec 6.2) |
| The MOTU M2's USB lead in, from its own box | - |
| The hub's 5 V lead from the Pi A box | A1 entry 12; barrel plug at the hub |
| The box's 24 V feed, 16/2, for the 12 V converter only | - |
| The BaroVUE 10's own cable | - |
| The HygroVUE 10's own cable | - |
| The SBE 45's RS-232 line, out to the wet lab box | A18, split gland B |
| The DO sensor's line, out to the wet lab box | A18, split gland B |
Where: a few feet from Pi A on the settee panel. Bus: both, through the isolated HAT. Floats: nothing here is wired to the lightning copper; no bond stud; plastic glands only. Inside: Compute Bay Housing and Wiring Plan sec 4.2, with desiccant and a humidity breakout; WD-B holds Pi B's 24 V feed through its relay's normally closed contact, and has its own D36V6F5 (sec 2).
| # | Entry | Through | Hole |
|---|---|---|---|
| 1 | Emergency bank feed: 14/2 from the 5 A Pi B breaker on the backup battery board (A10); oval 14/2, sealant-filled (sec 7.2) | PG11 | 3/4 in |
| 2 | CAN control drop (cut Micro-C drop, isolated HAT): black core to the HAT's G terminal, red core cut back and taped (sec 5.3) | PG7 | 1/2 in |
| 3 | CAN house drop (cut Micro-C drop, isolated HAT) | PG7 | 1/2 in |
| 4 | Pi B's own wing link: the wing actuator's CAN pair and a ground, a third drop on the actuator's own CAN link, to a second DSD TECH SH-C30G isolated USB to CAN adapter (Amazon B0CDGGBZDT) inside this box, on a Pi B USB port, tied down and staked under the USB rule. Pi B uses it only when it is in command; the two Pis never both command the actuator. Isolated, so the wing's ground stops at the adapter and Pi B's island still floats. It joins the wing link at the wing box (Mike, 2026-11-04: "ok"): its CAN pair lands with the wing Cat6's blue pair under surge module M3's OUT screws, its ground on a spare ground block, by the wing box's gland 6 (A17). Its 120 ohm switch off: its run is a branch | PG7 | 1/2 in |
| 5 | Link from Pi A: the alive discrete only (cut Micro-C; optocoupler inside) | PG7 | 1/2 in |
| 6 | Lightning detector lead to WD-B (A12): Belden 6504FE, 22 AWG, 6 cores with a foil shield and drain wire, about 0.175 in across, under 3 ft; five cores used, the sixth cut back flush inside the jacket at both ends; the drain lands here only, on the island's floating negative. The detector logs strikes; WD-B never cuts Pi B's power for lightning. Open: the 5 V surge diode on this lead (Compute Bay Plan sec 14.1); picking a 5 V part settles it | PG7 | 1/2 in |
| 7 | Iridium B's RockBLOCK cable in, USB plug on, to its USB isolator on a Pi B USB port (sec 6.5). Open: which split gland; none is on the buy list yet | Split gland | per gland |
| 8 | Ethernet to the TSW202 in the network switch box (A6a; switch port 8), UTP, long run to the stern; outside face taped (A6a) | RJ45 coupler (Alrhso) | per part |
| 9 | GPS B coax (no arrestor, no bias tee) | SMA F-F | 1/4 in |
Bus: control. Powered from: its own 15 A auto-reset breaker on the backup-fed bar (line 3, sec 7.6), 16/2, so it runs from the backup battery through the backup converter when the main side is dead. The release bus has its own 12/2 feeder on a 30 A breaker (line 4) and steering its own 14/2 on a 20 A breaker (line 5), both on the backup-fed bar; the wet lab its own 16/2 on a 15 A breaker (the branch bar's end stud), switched by relay channel 2. Its hardware watchdog: Compute Bay Plan sec 10.2. The box: the TICONN IP67 clear-lid box, 17.7 x 13.8 x 7.9 in outside, 16-7/8 x 12-7/8 x 7-1/2 in inside, grid mounting plate 15-7/8 x 11-3/4 x 1/8 in, two 304 stainless latches, $94.99 (), ordered 2026-11-02, due 2026-11-09 (Mike, 2026-11-02: "yes"). The box on hand (12.9 x 9 in inside) is too small: the parts and three rails take about 14.4 x 10.5 in of plate and the 15 bottom glands about 13.5 in of wall. One box, not two: two would need a 20-plus core cable between them. Plan: Box Plans v10.5/Central Node v10.5.pdf. Contents: everything in sec 4.1, and the steering drive and its power-cut relay (sec 5.6). Not fitted: charge-stop parts (sec 6.7), short relays, branch current meters, a VE.Direct reader, a gas breakout. The holes. Twenty glands and the vent, none on top (sec 7.1), numbered in one walk round the box: 1 to 16 along the bottom wall, left to right as Box Wiring Sheet A3 draws them, with 14 not drilled (the number is kept so the others stay put); 17 to 19 down the right wall; 20, 21 and the vent down the left wall, the vent high. No spare, empty or plugged holes: a new cable gets a new hole on a side or bottom wall and the next number, 22 on. Every gland with a flat duplex is sealant-filled (sec 7.2); entries 5, 6 and 8 are 16/2 runs, one per gland.
| # | Entry | Through | Hole |
|---|---|---|---|
| 1 | Bottom wall. 24 V feed, from the 15 A breaker | PG9 | 5/8 in |
| 2 | Bottom wall. CAN control drop: black core to this box's 0 V, red core cut back and taped (sec 5.3) | PG7 | 1/2 in |
| 3 | Bottom wall. Steering feed in: the 14/2 from the 20 A steering breaker on the backup-fed bar (line 5) | PG11 | 3/4 in |
| 4 | Bottom wall. Steering cable out to the Ewellix: the drive's two 14 AWG motor leads (red and black) plus the actuator's three 22 AWG position-feedback wires, green (the wiper), white (the full-retract end) and brown (the full-extend end) (sec 5.6) | PG11 | 3/4 in |
| 5 | Bottom wall. Channel 1 to the Starlink Mini's DC input (A13), through its 5 A fuse here | PG9 | 5/8 in |
| 6 | Bottom wall. Channel 2, the wet lab's own line (in by entry 20), straight to the wet lab box (A18, split gland C) | PG9 | 5/8 in |
| 7 | Bottom wall. Bow lantern out: channel 3, F4 and its 12 V converter here, then a 12/2 offcut straight forward (sec 6.4). Flat duplex, so sealant-filled. Measure the 12/2's jacket, then size the gland, as for entry 10. Ferrite just below the gland (sec 7.5) | PG11 or PG13.5 | 3/4 or 13/16 in |
| 8 | Bottom wall. Channel 4 to the em-trak, through its 2 A fuse here | PG9 | 5/8 in |
| 9 | Bottom wall. The bilge cable: one C4 18/4 shielded tinned cable (0.25 in), straight to the pumps on the glass panel aft of the settee. Red: pump 1 on, after channel 6's 5 A fuse. Black: pump 1 running, to opto input 1; it carries 24 V while the pump runs, so colored heat shrink and the label P1 RUN at both ends, and never on a 0 V terminal. White and the fourth core: unused, cut back and taped at both ends (pump 2's signals are on Pi B's side, A10; relay channel 12 has no driver and opto input 2 is spare). Shield trimmed and sleeved at both ends. At pump 1 the switch-on joins the pump's + terminal after its Water Witch 230-24, no diode; the running core joins the Water Witch's pump output (24 V there means the pump is running). Pump power is separate: pump 1 on line 11 (its 5 A breaker on the branch bar) through its Water Witch; pump 2 on line 15 from the backup battery board, through its Ultima switch (sec 7.6, A10). No high-water sensor. Drawing: Bilge Pump Wiring v10.5 | PG7 | 1/2 in |
| 10 | Bottom wall. Release bus feeder: 12/2 on its own 30 A breaker on the backup-fed bar (line 4), never the node's feed. Measure the 12/2's jacket, then size the gland | PG11 or PG13.5 | 3/4 or 13/16 in |
| 11 | Bottom wall. Release cable to the stern, straight, no terminal box (A16): the CONEPY 14/4 tinned, 0.40 in (fits a PG11), in one piece, carrying both drogue node-A release pairs at 14 AWG: drogue box 1 on red (+) and black (-), drogue box 2 on white or the lightest core (+) and the fourth core (-). Each + is the release bus; each - goes to its channel's MOSFET module. Inside the hull near the transom the jacket is opened, glue-lined heat shrink over the cut end (sec 7), and each pair runs on in a sleeve to its own potted transom gland and lid coils, no joint. Drawing: Stern Release Wiring v10.5 | PG11 | 3/4 in |
| 12, 13 | Bottom wall. Cord puller cables, paired by corner: two 18/4 shielded tinned, 0.25 in (fits a PG7), each in one piece from its pullers' reversing relays to its quarter (entry 12 the port quarter, entry 13 starboard, as Stern Release Wiring v10.5 draws them), carrying that quarter's two pullers: red (+) and black (-) to drogue 1's, white or the lightest (+) and the fourth core (-) to drogue 2's; the jacket opens at the corner. The shield drain goes to the 24 V negative here only and is trimmed and sleeved at the corner. The reverse adds no wires (sec 4.1). No confirm, bridle, aux-rudder or pull-pin cores | PG7 x2 | 1/2 in |
| 14 | (not drilled) | - | - |
| 15 | Bottom wall. Camera port UV-C feed, relay channel 9, out to the LM317 regulator and the UV-C lights at the underwater camera port; on a 22/12 offcut (0.24 in; the LEDs draw about 20 mA) | PG7 | 1/2 in |
| 16 | Bottom wall. Orion-Tr remote on/off pair, relay channel 10, out to the Orion-Tr's remote on/off terminal on the backup battery board (A10). It carries only a few milliamps through the relay contact, so any jacketed tinned 2-wire works: 16/2 if the 16/2 roll has about 17 ft left after its branch lines, else 18/2 (oval: sealant-filled, like the other 16/2 entries; an oval duplex does not seal in a PG7). A ferrule on each end. Drawn in the Backup Battery Board Changes plan | PG9 | 5/8 in |
| 17 | Right wall, top. Post and rudder cables in: one Altelix PG25 4-port split gland, each port sealing on one round cable 0.15 to 0.30 in across. Port a: the post lights cable, a 22/12 shielded offcut (0.24 in), in one piece from the post (sec 6.4); drain to 0 V here only. Port b: the post wind meter cable, a 22/12 offcut, in one piece from the meter (sec 4.1). Port c: rudder encoder A's lead, Belden 6504FE (0.175 in), in one piece from the rudder stock (sec 5.6). Port d: plugged with the gland's own plug. Ferrites on the port a and b cables just below the gland (sec 7.5) | Split gland (4-port) | 1-3/16 in |
| 18 | Right wall. Horn pair out: 16 AWG pair from relay channel 13 and its 5 A inline fuse, about 15 ft to the horn on the instrument post, up through the post's existing deck stub | PG9 | 5/8 in |
| 19 | Right wall, bottom. 1-wire chain 2 (compartment air), alone in its gland (one cable per gland), on a 22/12 offcut (0.24 in). Drilled because chain 2's cable needs it: drill a hole only when a cable needs it | PG7 | 1/2 in |
| 20 | Left wall, top. Wet lab line in: its own 16/2 from its 15 A breaker (line 9, sec 7.6), to relay channel 2; out by entry 6 | PG9 | 5/8 in |
| 21 | Left wall. 1-wire chain 1, the six battery probes, alone in its gland: the 20/3 trunk straight from the battery box (A9 entry 3b), never through the BMS box | PG9 | 5/8 in |
| V | Left wall, below entry 21, high. Membrane vent | 1/2 in |
The watchman box: the SBMS0 and the JK balancer, reading the cells and the shunts. It is IP65 (spray, not standing water); a drowned BMS box only loses readings, since it controls nothing. Where: as built, bolted to a long side wall of the battery box (Mike, 2026-11-02: "it is mounted on batt box side"). Open: which side and how high; Mike's word or a photo settles it. Four 1/4 in stainless bolts, each hole bored oversize, filled with thickened epoxy and redrilled, each bolt bedded in sealant, fender washers inside, nylon lock nuts or blue Loctite; clear of the lid screws, the main cables and the fuse (the steps: Battery Box Building Guide Parts 4 and 8). All its glands face down, each cable with a drip loop. Bus: none. Powered from: the pack: the SBMS0 through its cell ribbon (pins 11 and 12 from the W8 tap; Battery Box Building Guide Part 8); the JK balancer takes its own power pair, V- on the W0 tap and V+ on the W8 tap. Contents: Electrodacus SBMS0 with its WiFi/USB add-on board, JKBMS JK-B2A8S, a Winford BRK2X6-L-DIN 12-pin ribbon-to-screw-terminal board on a DIN rail (the SBMS0's tap wires land on it; a new 12-pin ribbon feeds it from the SBMS0, whose own ribbon is not cut), the butt splices from the JK's harness to its tap cable, and a six-block DIN strip: the shunt sense cable on terminals 1 to 4 (SBMS0 pins 1 to 4) and the XT1 thermistor on 5 and 6 (sec 7.6). No charger wiring, no resistor (sec 6.7): if the SBMS0 dies, charging carries on and only the readings stop. No humidity breakout, no gas sensors. Lace the harnesses to the plate at each plug; dielectric grease on the plug seals and on each gland insert only (sec 7.4). The terminal map, wire colors and splices: Battery Box Building Guide Part 8; the workbench sheet: Reference/BMS and Balancer Wiring Sheet 2026-10-03.pdf. Four holes.
| # | Entry | Through | Hole |
|---|---|---|---|
| 1 | The JK balancer's nine tap wires in from the battery box, on the ENERJOUR 18 AWG 10-core cable (0.39 in across; one core spare), alone in its gland with its own drip loop. Each tap wire goes straight to its own insulated ring on its bus bar nut, with no fuse (A9 entry 3). No gas-sensor leads | PG13.5 | 13/16 in |
| 1a | The SBMS0's nine tap wires plus the XT1 thermistor pair, on 11 cores of the 22 AWG 12-core shielded cable (0.24 in across), alone in its gland with its own drip loop; its shield grounded at this end only, at W0 | PG9 | 5/8 in |
| 2 | (not drilled: no charger wiring) | - | - |
| 3 | Shunt sense leads: one 4-core 20 AWG cable (nothing else goes on the shunts), from the two shunts on the positive side of the main bus board to terminals 1 to 4 of the DIN strip, no fuse. It is tied away from the SBMS0's USB plug in this box (the USB shell is Pi A's unfused minus). The pins: sec 7.6 | PG9 | 5/8 in |
| 4 | USB lead to the USB hub box beside Pi A (A1a): micro USB on the WiFi/USB add-on board, tied down right outside the plug; readings only, required. The plug passes whole through an Altelix PG25 4-port split gland (one of the 5-pack bought 2026-10-14, Amazon B0GYT3ZMDL), three ports plugged (sec 7.1) | Split gland (4-port) | per gland |
| 5 | (not drilled) | - | - |
| 6 | (not drilled: the DS18B20 chain runs straight from the battery box to the central node, A3 entry 21) | - | - |
Neither boat has an FSESC box: Boat 1 has one steering actuator, and Boat 2's steering backup is an aux rudder, not a second actuator. The number is kept so later box numbers stay put. Do not re-propose.
Boat 1 has no aft junction box: each cable runs in one piece between the central node and its device, the way the horn pair does. Do not re-propose a junction box between the node and the post. The number is kept so later box numbers stay put; the network switch box keeps its own number, A6a. The lights, the post wind meter, rudder encoder A and pump 1's signals all run in one piece to the central node, with their fuses, converters and ferrites there (A3 entries 7, 9 and 17; secs 4.1, 6.4 and 7.5). Line 6 feeds only the network switch box (A6a). The TICONN box on hand (about 12 x 8 x 5 in) is free for another job, and the two Altelix 4-port split glands of the 2026-10-14 five-pack not used elsewhere go to the wet lab box (A18).
The box where every network cable ends, plus the boat-wide rules for network jacks, the surge board and network cables. The box: a CXCESNS aluminum box, 11.8 x 8.3 x 3.9 in, the same as the two compute boxes (Compute Bay Plan sec 3.1). Its back face is glued flat to the hull for cooling, the way the Pi A box is (Compute Bay Plan sec 2.3); entries go on the other faces, with drip loops. The box is wired to nothing: it stays off the lightning copper list, like the cooling plates (Lightning Ground System Guide sec 6.2). Keep it well above bilge water. Contents: the TSW202 switch and its Mean Well DDR-120B-48 supply, set and sealed (sec 6.1), always on, never on a relay; the 10GTEK SFP-T copper module in SFP port 9. Nothing lightning-related is inside. Ten entries: nine RJ45 couplers and one PG9. The switch and its supply clip to a DIN rail on a long side wall, not glued to the floor. The floor (the face glued to the hull) is too shallow: the TSW202 is 4.8 in (122 mm) deep and the box only 3.9 in. On the side wall the switch reaches about 4.8 in across the 8.3 in floor, plus about 1.2 in of plug, which leaves about 2.3 in to turn the patch cords. Heat goes from the rail to the box wall, the glued face and the hull: about 5 to 15 W in all (the supply loses about 9 percent, the switch makes 3 to 8 W).
Network jacks, boat wide. Every network cable that crosses a box wall comes in on a bulkhead jack (an IP67 RJ45 panel coupler, plug in on both sides), one per cable: the Alrhso couplers, zinc and plastic. The outside face sits in the hull's salt air, which corrodes the thin gold plating, and the jack's cap seals only an empty jack. So on each outside face:
Jacks go on side or bottom walls, facing sideways or down, never on the top. Inside faces, within sealed boxes, need no tape. The jacks: this box 9, Pi A 1, Pi B 1, the light driver's dry box 1 (12 in all). The network surge board (near the deck, not in this box). The five Ubiquiti ETH-SP-G2 Ethernet surge protectors (outdoor-rated) and the small tinned bus bar for their grounds sit on a small board on a bulkhead near the deck, where the outside network cables first come inside: the two post cameras, Starlink, the foredeck fisheye and the interior camera. The bar's ground lead runs short and straight to the lightning copper, a foot or two at most (Lightning Ground System Guide secs 6.2 and 7.4). From each protector a short premade Cat6 runs down to its wall jack on this box, low in the hull. Keep the cables before the protectors (from outside) apart from the cables after them (down to the switch). Open: where the lightning copper runs near that bulkhead, and so which bulkhead takes the board; check at the boat. Network cables. Every network cable is premade, plugs and all; no plug is crimped on the boat.
| # | Entry | Through | Hole |
|---|---|---|---|
| 1, 2 | Post cameras: forward camera Cat6 (port 1), aft camera Cat6 (port 2); each from its surge protector on the surge board | RJ45 coupler x2 | per part |
| 3, 4 | Camera Cat6: foredeck fisheye (port 3, on all the time, sec 6.1), interior camera (port 4); each from its surge protector on the surge board | RJ45 coupler x2 | per part |
| 5 | Underwater camera Cat6 from the Axis P1245 main unit inboard (port 5); no surge protector | RJ45 coupler | per part |
| 6 | Cat6 to the PoE light driver in its dry box (port 6); no surge protector | RJ45 coupler | per part |
| 7 | Ethernet to Pi A (port 7) | RJ45 coupler | per part |
| 8 | Ethernet to Pi B (port 8), UTP, so the coupler's metal touches no wire or shield (A2); long run from the settee | RJ45 coupler (Alrhso) | per part |
| 9 | Ethernet to Starlink (SFP port 9 through the copper SFP module), from its surge protector on the surge board | RJ45 coupler | per part |
| 10 | 24 V in, always on: line 6, its own 20 A breaker on the branch bar (sec 7.6), onto one DIN terminal block from the kits on hand, which feeds the 54 V supply. This box is line 6's only load. Oval 16/2: sealant-filled | PG9 | 5/8 in |
| 11 | (not drilled: no ground lead; the surge protectors' ground is at the surge board) | - | - |
| 12 | (SFP port 10, free: a coupler only if wanted; not drilled) | - | - |
| 13 | (not drilled: nothing leaves this box on 24 V) | - | - |
A7, VESC A: the motor controller's box, on the control bus. Eight entries: CAN, UART + kill and the sensor lead at PG7, battery + and - at PG16, and the three motor phase leads at PG21; no ferrite (sec 7.5). As built, with every wire, the part positions and the build steps: Box Plans v10.5/VESC A Box v10.5.pdf. The full-size drilling template for Boat 2: Old/Flipsky Hole Pattern 2026-10-26.pdf. The controller is the Flipsky 75200 Pro V2.0 (Bill of Materials sec 15.5; as bought: Build Guide sec 5.1; settings: System Settings Sheet sec 2).
The box: a CXCESNS cast aluminum box, 11.8 x 8.3 x 3.9 in, like the compute boxes and the network switch box (BOM sec 15.5). Its floor is the cooling plate: it glues straight to the hull in the heat-carrying epoxy (Compute Bay Plan sec 2.3), like the switch box; no separate plate and no hole in the floor. Heat: roughly 60 W at 2 kW (a guess at 97 percent), a few watts at the usual 150 to 250 W, through about 98 sq in of floor. Wired to nothing (Lightning Ground System Guide sec 6.2): the Flipsky's metal base touches only its gap pad and its four screws, and an aluminum-board base is insulated from its copper (inferred). A desiccant pack goes in, since the floor runs near sea temperature. Fitting the Flipsky (5-1/8 x 2-11/16 in, 130 x 68 mm, Flipsky's spec), before the box is glued to the hull:
Layout and entries (as built, Mike's photo, 2026-11-06; VESC A Box plan page 2). All glands 1 in below the rim. The + and - PG16s and all three PG7s are on one long side; their spots, read off the photo from the battery end corner: minus 3-3/4 in, plus 5 in, C (CAN) 6-3/4 in, S (sensor) 8-1/4 in, U (UART + kill) 9-3/4 in (which big gland is + is Claude's pick). The three motor glands are PG21 on the motor end. The capacitors and WAGOs sit along the long side away from the glands, by the - post, so the + 12 AWG capacitor lead is about 5-1/4 in and the - one short, both under 6 in. Plugs. Find pin 1 on each with a meter: GND rings to battery negative; powered, 5V and 3.3V read as marked. Bench test: power up with the shorted plug.
BOAT 2 ONLY: every signal joint on one DIN rail (Mike: "Yes"; VESC A Box plan pages 5 and 6). A 1-3/8 in (35 mm) DIN rail about 5 in long along the gland side, 16 screw blocks (the wet lab box's kind) in three groups under their glands (C: CAN 0V, CANL, CANH; S: 5V, SIN, ADC1, GND, ADC2, COS, TEMP, T GND; U: RX, TX, 3.3V, PPM, SV GND). Cable cores on the gland-side screws; the Flipsky's plug leads and the resistor legs on the other side (10k sin to ADC1, 20k ADC1 to GND, 20k ADC2 to GND, 10k cos to ADC2, 10k 3.3V to PPM). Same wires and pins as Boat 1; no splices or lever nuts; thin plug leads in ferrules, folded double, tied down within 2 in of the plug, a dab of silicone on each plug; the switch plug keeps its own short jumper. Parts on the shelf (inferred from the tracker): DIN rail (the VAMRONE 8 in rails or the T&G rails), blocks from the MELIFE or Erayco kits or the ST2-2.5 push-in blocks (a ferrule on each thin lead), the resistors. Nothing to buy. Motor leads. The ME1616's three orange phase leads, about 2 to 3 ft, boots and lugs fitted, phases labelled. Measure their real length before siting the controller. Any motor lead may go to any Flipsky lead, one to one: the order only sets the direction, which is set in VESC Tool; connect all three before the motor setup wizard. In a CUT-BURST the phase current reaches about 300 A for seconds while the battery-side cap stays about 180 A; the short run soaks that up as heat. They come in through three PG21 glands (1-1/8 in holes, sealing 0.51 to 0.71 in) on the motor end with their own lugs uncut, and bolt to the Flipsky's U, V and W inside the box (Mike, 2026-11-06: "power take out and short plug, joints inside box"). No motor lead lugs and no 3/8-16 x 1 in bolts are needed. Bus capacitance. The long 2 AWG battery leads ring on every switching edge (owners report blown capacitors, then transistors), so extra capacitors sit right at the controller: four Nichicon 1,000 uF 63 V (Claude's sizing; on hand), lying in a row on the box floor, stripes all one way, joined by two WAGO 221-415 lever nuts, one for plus and one for minus (ordered). Plan: Box Plans v10.5/VESC A Box v10.5.pdf.
The posts: two insulated MGI SpeedWare 3/8 in power junction posts, bought, $18.95 (order tracker; rated 160 A there, against about 80 A at 2 kW); not the Blue Sea 2017 Dual PowerPost. Each holds three lugs, bottom up: the 2 AWG feed (5 to 6 ft, twisted), the controller's 8 AWG lead, the 12 AWG capacitor lead. The controller's leads stay the Flipsky's own 8 AWG, cut under 6 in (at 180 A for seconds a 4 in run drops about 0.04 V, and changing them means soldering on the board). Nothing bare but the post lugs; no solder anywhere. Not fitted, do not re-propose: copper strips or any bare bus copper at the capacitors, a G10 capacitor board, a bought RC capacitor pack (the ones found have solder posts or pads), stacked WAGOs (the lower one's levers get trapped). Motor position sensor. The ME1616's SinCos sensor harness and its divider: Build Guide sec 5.1 (crimp, no solder; not a digital level-shifter board, which is for on/off signals). Sin goes to ADC1 and cos to ADC2 on the COMM plug, both 3.3 V inputs. The motor's sensor plug is an Aptiv Metri-Pack 150, 8-way, sealed; its mating half: Bill of Materials sec 15.5. Temperature: the KTY84/130 sensor pair reads about 600 ohm at 77 F; the board must have the 10k resistor on the motor temperature pin that the firmware assumes, and the motor must read room temperature within about 5 F at first power-up (System Settings Sheet sec 2). The fallback is sensorless: fine at cruise, weakest at full torque from a standstill. A8, VESC B: BOAT 2 ONLY. Boat 1 sails with one VESC: losing propulsion costs time, not the trip, because the wing sails the boat (Routing Guide 11.5). Boat 2's box has 7 holes (CAN, battery + and - at PG13.5, phases to the contactor x3 at PG16, contactor coil set/reset + sense at PG7), with the phase-transfer contactor and its coil driver; none of it is in the Boat 1 totals.
Bus: none. Seven holes, plus the main fuse's bolts if they go through the wall and the BMS box's four bolts (row M). Each signal cable has its own gland and drip loop, dielectric grease on each insert: two cables of different size do not seal in one gland, sleeved or not. Build: Battery Box Building Guide.
| # | Entry | Through | Hole |
|---|---|---|---|
| 1, 2 | 2 AWG mains, + and -, in line with the terminal posts at measured post height, cables straight over the aft G10 plate (aft wall) | PG16 x2 | 7/8 in |
| 3 | The JK balancer's ENERJOUR 18 AWG 10-core, to A4 entry 1 (aft wall). The eighteen tap wires, nine for the SBMS0 and nine for the JK: the two wires of each joint on two different posts of that joint, one ring per stud, each wire straight to its own insulated ring on its bus bar nut, with no fuse (18 rings; Mike, 2026-11-08). Split loom on any tap wire where it crosses a bus bar or stud of another voltage, and every wire tied so it cannot rub (Battery Box Building Guide Part 8) | PG13.5 | 13/16 in |
| 3a | The SBMS0's 22 AWG 12-core shielded: its nine tap wires and the XT1 thermistor pair, to A4 entry 1a (aft wall) | PG9 | 5/8 in |
| 3b | The DS18B20 chain's trunk, Mike's 3-conductor 20 AWG cable (red power, black ground, the third data), straight to central node entry 21, never through the BMS box (aft wall). The probes and their splices: Battery Box Building Guide Part 8 | PG9 | 5/8 in |
| V | Gore vent, the breathing inlet (aft wall) | M12 | 1/2 in |
| F | The 300 A main fuse, bolted to the outside of the aft wall at mid-height on the + side (sec 7.6). Any bolt through the wall is bedded in sealant | Bolts | per part |
| M | The BMS box, bolted through a long side wall, as built (which side and how high: Open, A4): four 1/4 in stainless bolts, each hole bored oversize, filled with thickened epoxy and redrilled, each bolt bedded in sealant. Drill before the pack goes in | Bolts x4 | per part |
| R | Relief stub: 1-1/2 in Sch 40 PVC glassed through the FORWARD wall, high, pointing up at 45 degrees into open cabin space, discharge forward away from the electronics; inside it a Dometic/Sealand 1-1/2 in toilet duckbill (OEM 385310076), lips out, flange clamped by a PVC coupling. No screen (the duckbill is shut except when the box vents; the cell-temperature trip is the protection). Not fitted: a bug cap or a fine flame mesh (do not re-propose) | 2 in hole saw | 2 in |
Not fitted, do not re-propose: heaters, gas sensors (in the box or at the cabin deckhead), the high-water sensor, the overboard relief duct with its transom hole and burst membrane. The six DS18B20 pack probes and the cell-temperature trip are the protection.
The backup battery, a Dyness 24V 100Ah LiFePO4: 25.6 V, 100 Ah, 2,560 Wh, 20.9 x 8.11 x 8.54 in, 42.6 lb, plastic case, built-in 100 A BMS with low-temperature cutoff, ~$360. Not the Bluetooth version. Not the team-built 8x EVE LF50 + JBD 60 A bank. The unit is its own enclosure: no box is built, no hole schedule, no gland list. It keeps the boat sailing when the main battery is dead or cut off (why: Design Decisions R-4.3A). It powers Pi B, WD-B, GPS B, IMU B, Iridium B and the lightning detector; bilge pump 2, always (below); and, only when the main side is dead, the backup-fed bar through the backup converter: the central node, steering, the wing box, release bus A and Release Node B (sec 7.6). It stays apart from the main bank: the Orion-Tr and the backup converter are both transformer isolated. Its daily budgets, on a normal day and when steering or drifting on the backup alone: Compute Bay Plan secs 5.2 and 5.3. Its standby level and monthly exercise: System Settings Sheet sec 1. Open: the monthly exercise runs it down to 25 percent, below the backup converter's 30 percent cutoff; Mike's call settles which gives. Its voltage reading: WD-B reads the backup battery's voltage through two resistors (a divider, from the resistor kit on hand) into one of its spare analog pins and passes it to Pi B over the serial line between them (Compute Bay Plan sec 4.2). No shunt, no USB parts, and no new hole (inferred: Pi B's own feed, A2 entry 1, brings the voltage into the box).
Two recharge paths, independent of each other:
The backup battery board (built and mounted in the boat, Mike, 2026-11-03; every change is made in place; plan Box Plans v10.5/Backup Battery Board Changes v10.5.pdf, photo Reference/Backup Battery Board Photo 2026-11-03.jpg). Every circuit of the emergency bank lands on one 16 x 12 in board (1/2 in marine plywood or 1/4 in G10, no bond wire), standing up within a foot of the Dyness, built and wired on the bench and fitted as one piece; nothing goes through a box gland. Bars and breakers under their covers, cables leaving the bottom edge with drip loops, somewhere dry. As built: the ANL at the top, the + bar under it, the two chargers down the right side, the - bar at the bottom. It holds:
Open: where Primelink unit B lands if it comes here (Build Guide sec 8.3); Mike's call settles it. Plan: Box Plans v10.5/Backup Battery Board Changes v10.5.pdf. To work on the board:
Bilge pump 2 on the backup battery, always. Pump 2 (Gulper 320, about 3.25 A) is fed from the backup battery at all times, so it stays armed whatever happens to the main side or the converter. Its 5 A auto-reset breaker (line 15) is on this board, its feed on 14/2 from the roll on hand.
One box per satellite modem, each beside its own Pi (sec 6.5). Contents: RockBLOCK 9603 carrier, an isolated 24 to 5 V converter, TVS, and the cut end of the RockBLOCK's own cable with three lever connectors (sec 6.5). Why the converter is isolated: each antenna's stub arrestor ties the coax shield to the lightning copper. With an isolated converter that tie stops at the Iridium side, so the main negative (A) or the emergency island's floating negative (B) is not tied to the copper a second time. The converter (Claude's pick, standing unless Mike says otherwise): a Mean Well DDR-15G-5 in each box (Amazon B07B6553JY; $20.50 at Jameco).
The box: plastic, with a mounting plate, room on it for the converter, the RockBLOCK beside it and a TVS, and about 3 in from plate to lid (the Pi boxes are full). Open: the Iridium box (the TICONN 5.9 x 5.9 x 3.5 in box is not used); Mike to say which box. The modem's cable (plans Box Plans v10.5/Iridium A Box v10.5.pdf and Box Plans v10.5/Iridium B Box v10.5.pdf). The FTDI cable that came with the RockBLOCK is cut 8 in from its small plug, inside the box; both pieces are kept. Its four wires at the small plug (Mike's photo): black pin 10 ground, red pin 8 5 V in, orange pin 6 data into the modem, yellow pin 1 data out.
Entries (3 each):
| Entry | Iridium A | Iridium B | Through |
|---|---|---|---|
| The long piece of the RockBLOCK cable, out to its Pi's USB isolator, cut end pushed in from outside | Same | Same | PG7 |
| Coax, straight to the stub arrestor | Same | Same | PG7 |
| Always-on power | 16/2 on its own 5 A breaker (stud 7, sec 7.6) | 14/2 from the 5 A Iridium B breaker on the backup battery board (A10), sealant-filled | A: PG7. B: PG11 in a 3/4 in hole |
The lightning detector's box, read by WD-B. Contents: the Playing With Fusion SEN-39003 AS3935 lightning board only, run at 5 V with no level shifter: its datasheet gives 2.4 to 5.5 V for power and signals (Reference/AS3935 PWF SEN-39003 Wiring 2026-10-14.md). It comes tuned at the factory: this board's value is 88 pF (bag label; System Settings Sheet sec 10). I2C address 0x03. Plan with wire colors: Box Plans v10.5/Detector Mini Box v10.5.pdf. At the board, on the bench:
At WD-B (A2 entry 6): red to WD-B's 5 V (its D36V6F5 rail), black to the island's floating negative, white SDA to A4, green SCL to A5, blue IRQ to D2 (Claude's pick; no WD-B pin map exists yet). Entry: the Belden 6504FE lead to WD-B (Mike's roll; 22 AWG, 6 cores, foil shield and drain, about 0.175 in across), under 3 ft: the brown core cut back flush inside the jacket at both ends, the drain cut back and taped here and landed at the WD-B end only (PG7, 1/2 in). The SparkFun SEN-15441 board and the level shifters are not used.
The Starlink Mini sits bare on the aft deck, with no enclosure: it is IP67 with its cables plugged in (Mike, 2026-11-02). No entries, no glands, no coupler. Ethernet to the TSW202 in the network switch box (A6a; SFP port 9), through its surge protector on the network surge board: a standard RJ45 plug in the Mini's own latching port, greased and taped with self-fusing tape, as A6a says for a jack's outside face. Power: relay channel 1's own 16/2 straight from the central node (A3 entry 5), through its 5 A fuse there, to the Mini's DC input (it takes 12 to 48 V on a DC5521 barrel plug). No heater. Open: how the power joint to its DC input is made, and what holds the Mini down. Deck: the post bundle, the GPS and Iridium A coaxes and Starlink's Cat6 and power pair share the instrument post's 1 in PVC deck stub and its 1 in liquid-tight conduit, sealed round the wires at the stub. The route, and the sample-stub check before the real stub is glassed in: Instrument Post Guide secs 7 and 8.
Bus: house bus end: its tee is the last on the house backbone and carries the terminator plug (sec 5.2). Powered from: its own 12/2 feeder on a 30 A breaker on the backup-fed bar (line 2, sec 7.6); it stays on the house bus and the main side, and with the main side dead the backup converter feeds it. Contents (sec 4.2): NUCLEO-G431KB on a Nano screw carrier (staked) + CAN transceiver breakout with a Taidacent RS-12V/2S surge module on the CAN drop, potted Klnuoxj 24 V to 5 V converter, enable relay (24 V 30 A 1-channel module), dual-MOSFET modules for the two live channels, mini DIN strip. No fuse in its feed: its own 30 A breaker is the protection (Compute Bay Plan sec 10.3). No shorting relays, no opto board, no humidity breakout. All logic under screws but one: the CAN board keeps its soldered 4-pin header, with the ready-made 24 AWG plug zip-tied on (sec 4.1). Every Nucleo solder link stays as shipped. Open: its three Nucleo pins, to be picked clear of A2, A4, A5, A7, D5, D12 and D13; laying out its pin map settles it.
| # | Entry | Through | Hole |
|---|---|---|---|
| 1 | CAN house drop from the end tee | PG7 | 1/2 in |
| 2 | 24 V feed: the 12/2 feeder on its own 30 A breaker on the backup-fed bar (line 2); its red lands straight on the 24 V bar, no fuse (the strip as built: Box Plans v10.5/Release Node B v10.5.pdf). Measure the 12/2's jacket, then size the gland | PG11 or PG13.5 | 3/4 or 13/16 in |
| 3 | Drogue box 1, node-B channel | PG7 | 1/2 in |
| 4 | Drogue box 2, node-B channel | PG7 | 1/2 in |
| 5 | (not drilled: Boat 1 has no steering pull-pins) | - | - |
| 6 | (not drilled) | - | - |
| 7, 8 | (not drilled: no opto board; a 4-hole box) | - | - |
No dying-gasp reflex (do not re-propose): nothing is wired, no valve close lines to the backup island, no fuses for them, no pin on Pi B or WD-B. Valve 2, the duty valve, springs closed on power loss by itself (auto-return), and that alone is the boat-level protection. Valve 1 (stays-put 5-wire, open 24/7) needs no drive: a power-dead boat with valve 1 frozen open is acceptable, because the hull is still owned by the seacock and by valve 2. The valve types are in the Flow-Through Wet Lab Design.
Do not re-propose a stern terminal box for Boat 1 (Mike, 2026-10-27). For the twelve wires at the stern it would only add two screw joints per wire on a circuit nobody can fix at sea. The release cables run straight from the central node instead (A3 entries 11, 12 and 13; drawing Stern Release Wiring v10.5). The box on hand (9.5 x 5.5 in) is free for another job. Boat 2's aux-rudder release, if fitted, runs direct the same way.
The hull end of the slip ring, and the box that stops a mast strike. Its parts, its surge table and what reads the wing: Wing Power System secs 1A and 8.7. The ring's eight wires land here: the trim actuator's 24 V pair and CAN pair, the wing-tip wind meter's RS-485 pair and the wing compass's RS-485 pair. At the tip the 24 V pair feeds a branch on its own 1 A inline fuse: the compass runs on that 24 V, and a small converter makes 5 V from it for the tip meter alone. Every wire from the ring gets a fuse or a surge part at this box's entries, so a strike on the mast stops here and does not reach the other boxes. The 24 V pair gets the box's own 5 A fuse and a 1.5KE33CA surge diode. The CAN pair and both RS-485 pairs get surge modules where they enter the hull (Compute Bay Plan sec 14.1): three Taidacent RS-12V/2S, two ordered 2026-09-26 and the compass's bought 2026-10-07 (Wing Power System sec 8.7). The actuator's four wires also get surge clamps at the actuator itself, in the wing. The trim actuator stays on its own short CAN link, off the boat's two buses. No angle sensor cable (the wing angle comes from the compass), and no reader in this box: both wing readers are in the USB hub box (A1a). The box (Claude's pick): a TICONN IP67 ABS box, 5.9 x 5.9 x 3.5 in, with its mounting plate (), to buy. The three Taidacent modules, the surge diode and the 5 A fuse sit on a short DIN rail on the plate. It fits (Claude, 2026-11-04, from the Wing Box plan's layout): flat on the plate, the 4.8 in rail (end stop, terminals 1 to 9, the three surge modules, end stop) sits on a plate about 5.2 in square with about 0.4 in to spare, and the modules' IN ends stand about 1 in above the bottom wall's glands. Depth: one-module RS-485 surge protectors of other makers stand about 2.2 in off the rail (the Taidacent lists only its width); back wall, plate posts, plate and rail add about 0.7 in, so about 2.9 in of a box 3.5 in deep outside: it closes with about 1/4 in to spare (inferred). No bigger box. No vent (sec 3). Six glands, all on the bottom wall (Box Plans v10.5/Wing Box v10.5.pdf): four PG9 (1 the 24 V in; 2, 3 and 4 the three hull cables) and two PG7 (5 the Cat6 out to the hub box; 6 Pi B's CAN drop, in the upper row above gland 5). Open: each hull cable, so its gland size; picking the hull cables settles it. What crosses its wall:
The wing box to hub box cable. One shielded 4-pair cable, one long run, one gland at each end: the actuator's CAN pair, the tip meter's and the compass's RS-485 pairs, each after its surge module, and a ground pair tied to the wing's 24 V negative in this box. The ground pair is needed because an isolated reader's signal side floats: it must share a reference with the sensors, or the signals drift out of range. RS-485 terminators off.
A small node on the house bus that switches each wet lab pump and valve one at a time and reads the wet lab's sensors (Claude's layout, standing unless Mike says otherwise). Pi A runs the hourly cycle (Flow-Through Wet Lab Design sec 10); this box does what it is told and refuses anything unsafe. Detail: Reference/Wet Lab Box 2026-10-14; plan with the plate layout, wiring, the Nucleo pin map and every part with a photo: Box Plans v10.5/Wet Lab Box v10.5.pdf. Where: beside the wet lab, outside its drip tray and above its rim, all glands on the bottom face with drip loops; within about 5 ft of the USB hub box if it can be (the FTDI cables are 6 ft; a longer run is extended on screw terminals here with leftover 22/12 shielded cable). Nothing in it is wired to the lightning copper. Bus: house (sec 5.2), on a cut Micro-C drop from its own tee ahead of Release Node B's end tee. Powered from: the wet lab's own 16/2 line (line 9, sec 7.6), switched by central node relay channel 2, which is on only around each burst; nothing needs power while idle (valve 2 is shut unpowered, valve 1 stays where it is). The node ID, the silence rule and the relay channel 2 timing: System Settings Sheet. The box: plastic IP67 with a mounting plate, about 12 x 8 x 5 in: the TICONN IP67 box bought 2026-10-03 if it is that size or bigger, else a TICONN box of that size, to buy. No vent (sec 3). Contents:
| Fuse | Feeds | Size |
|---|---|---|
| F1 | The Gulper | 5 A (a guess; read its label) |
| F2 | The Iwaki pump and the dosing pump | 2 A |
| F3 | Both valves and their position wires | 2 A |
| F4 | The DO sensor and the SBE 45 | 1 A |
| F5 | The node, the relay coils and the flow meter | 1 A |
| Relay channel | Load |
|---|---|
| 1 | The Iwaki pump |
| 2 | The Kamoer dosing pump |
| 3 | The Gulper air pump |
| 4 and 5 | Valve 1's open and close lines |
| 6 | Valve 2 (powered = open; unpowered, it springs shut) |
| 7 and 8 | Spare |
| Opto input | Signal |
|---|---|
| IN1 | The flow meter's 24 V pulses |
| IN2 and IN3 | Valve 1 open and shut |
| IN4 and IN5 | Valve 2 open and shut |
| IN6 to 8 | Spare |
What the node does on its own:
Each valve stroke is timed from its position wires and reported: the wear gauge the Wet Lab Design asks for. Left out, with stand-ins: pump current (no current sensor on the boat; the flow rate stands in) and the dosing reservoir level (counted from the doses given).
| # | Entry | Through | Hole |
|---|---|---|---|
| A | Split gland A: the CAN house drop (cut Micro-C, from its own tee), the flow meter, the pressure sensor, the Celsius probe | Altelix PG25 4-port split gland | 1-1/2 in |
| B | Split gland B: the DO sensor cable in; the DO data out to the USB hub box on the FTDI RS-485 cable's bare end (A1a); the SBE 45 cable in; the SBE 45 data out to the USB hub box on the FTDI RS-232 cable's bare end (A1a) | Altelix PG25 4-port split gland | 1-1/2 in |
| C | Split gland C. C1: the three pumps on one 4/18 shielded cable (on hand, Wire and Cable Buy List C4): white Iwaki +, green Kamoer +, red Gulper +, black one shared - (one pump runs at a time). C2: both valves on one 22/12 shielded cable (on hand, C1), ten cores used, pink and beige spare. C3: the 24 V in, the wet lab's own 16/2 line, after relay channel 2, straight from the central node (A3 entry 6); oval, but Mike's fit says it seals, the one exception to the split-port rule (sec 7.1; Mike, 2026-11-07: "24v fits in C"). C4: plugged | Altelix PG25 4-port split gland | 1-1/2 in |
Three holes, three split glands, all on the bottom wall (Mike, 2026-11-07: "yes, 3 split glands"); PG25 thread is 1.46 in (37 mm). Both cable shields go to the 0 V bar at this box only. The pump and valve leads join C1 and C2 outside the box with glue-lined heat-shrink butt splices (on hand). The 4/18 and 22/12 core colors are Claude's pick from the usual sets (the cables' own codes are not on record); if they differ, the screws stay the same. Each split port takes one round cable 0.15 to 0.30 in across: read each cable's diameter before cutting; the valve cable must be 0.30 in or less (if bigger, it takes its own PG9 or PG11). Open: the third Altelix 4-port: two are free from the dropped aft junction box; whether one is left from the 5-pack is not known; a count of the shelf settles it. To buy: an N2K single tee for the house backbone if the shelf has none spare. Totals (from the entries above; Boat 1 boxes only):
Each part's price and status: the Bill of Materials, pointed to from sec 8 (the wing's parts: its sec 15.6). Purchase records: the order tracker, BOM v10.5 Order Status.xlsx. Not on the boat, said only here (do not re-propose):