Bus: none. Nothing in it talks on CAN, so the house bus ends at Release Node B's tee (sec 5.2) and no CAN cable comes in. Boat 1 has no aft junction box. Each cable runs in one piece between the central node and its device. A6a keeps its number. TSW202, its 54.0 V supply and the SFP live in A6a. Five ETH-SP-G2 sit on a surge board near the deck, not in A6 or A6a. GitBoat v10.5 A6 - pin 8454cb0.
Item 87 Proposal
Item 87 (2026-10-30): the couplers moved to the switch box, so about 14 entries; the build sheet of item 467 needs a plate about 10 x 6 in and a base at least 3-1/2 in deep for its lower gland row. The sheet says the box on hand is about 12 x 8 x 5 in. The aft box is gone, so those plate lines are not open aft-junction work. (b) and (c) are open.
Aft_Junction_Box_Build_Sheet_2026-10-30.html retired upstream 2026-11-02 (moved to Old/).
Aft junction removed Decided
Boat 1 has no aft junction box. Each cable runs in one piece between the central node and its device. A6a keeps its number. A6a entry 13 is not drilled. Nothing leaves on 24 V. Line 6 feeds only the network switch. The 54 V supply stays in A6a. The bow lantern's F4 and its YRDZXG sit in the central node (Electronics 6.4). Starlink's 5 A fuse is at A3 entry 5 (Electronics A13). Old plastic holes A6 #9, A6 #10, A6 #16, A6 #18 and A6 #19 are not landings.
Aft build sheet Decided
Electronics plan A6: no aft junction on Boat 1. Do not draw F4 or F5 as fitted. The bow lantern's F4 sits in the central node. This build sheet has no v10.5 replacement.