House bus tee ahead of Release Node B | GitBoat v10.5 A18 | Pending 428, closed v10.2a
Box plan Decided
Wet lab box plan. The wet-lab path is relay channel 2 and its own run.
Pending 521 pin map In the guide
Pending, not yet in the guides. 521 (Pending_Amendments_v10_5.md line 19): "3.3V, GND, CAN RX, CAN TX, in that order"; "3.3V to 25b, GND to 22t, CAN TX to D2, CAN RX to D10"; "with ferrules"; "The 120 ohm resistor (marked 121, just below the CANL and CANH pins) still comes off". 522 line 21: "about 16 min"; "Room for weeks of bursts is a guess"; "The serial lines can't carry orders as wired". Not drawn.
Pending 524 In the guide
Electronics plan A18: the NUCLEO-G431KB is bought (Ken, DigiKey; Mike, 2026-11-06). Valve 1's second input is A7. The CAN board keeps its header and one RLECS Dupont lead, zip-tied. The surge stands on its own short rail: IN 1 white is H, IN 2 blue is L. 0 V is two bars (16-18 and 19-23) joined by one 22 AWG from block 18 top to block 19 bottom.
Relay screws read NC, COM, NO; COM and NO are used. 22 AWG on signals and the 1 A and 2 A feeds; 18 AWG on the main 24 V path. The XWST's own leads reach the rail. Opto inputs 1- to 5- are joined.