Written 2026-09-15 at the v9.6 promotion; revision 3 late the same evening, after Mike answered thirty questions in two rounds. This list replaces Pending Amendments v9.6. It is short on purpose. Everything applied at v9.6 is in Part C as a one-line record; the reasoning is in Changelog and Glossary v9.6, Part 9, and in the change register v9_6_Change_List_2026-09-15.md (Part 6 has the evening answers).

How to read it. Item numbers 1 to 66 are the same numbers the v9.6 list used, so chat references still resolve. New items start at 67. Part A is what only Mike can decide; the documents carry a stated assumption until he answers. Part B is everything else still live. Part C is closed.

Rule as before: settle it, apply it to the named document, strike it here.


A. Decisions Mike needs to make

One thing, and it does not block work this week. The documents carry the stated assumption until he answers. Three items closed on 2026-09-16: the rudder rate (103), where the battery percentage comes from (50), and the Airmar 200WX (105, dropped). All three are in Part C.

# Question, in plain words What the documents assume for now Documents that change
86 Hull-glued cooling. Which boxes get glued to the hull for cooling (the set names Pi A, the motor cooler plate and the VESC plate), how thick the hull laminate is at each spot, and how big each plate must be. The glue rule is settled: thickened epoxy with two-grit aluminum oxide, never 5200. The box sections are not rewritten until this closes The three the set names Build Guide 5.2, Compute Bay 2.3, 2.4, 3.5, BOM

Two small identifications, for when the parcels land: the Amazon line hidden "for privacy" (B07PH5H6DM, $11.49, ordered 2026-09-13) and what the two 1/2 x 1/2 in 316 square bars are for (item 106). Neither blocks anything.


B. Live items carried, with what to do

1. Mission-risk number. Build Guide sec 14 still carries the ~91 percent figure marked STALE. It assumed redundant steering; Boat 1 has one Ewellix actuator and one VESC. Re-derive once heading wander is measured afloat (item 22). Never use the 33.5 percent figure from the 2026-09-04 email.

2. Displacement margin. Estimates sit at 5,520 to 5,590 lb against the 5,500 lb basis. The sec 11.2 weighing is the gate. The can is now 115 to 125 lb, not 60, which makes this tighter.

4. Camera head against the tube bore. Measure the Axis P1245 head against the 1-1/4 in G10 tube before bonding; aim check at 38 degrees.

5. Wet lab: chamber sizes and the gland schedule. The sensors are bought or ordered (SBE 45, DFRobot DO, flow sensor, dosing pump), so the chamber dimensions can be fixed; two populated stations on Boat 1. Depends on item 77.

7. Boat 2 steering redundancy. Open by decision: aux rudder, not a second actuator. Boat 2 only.

8. Drawings. Rev H wing sheets 2 and 6 are stale; there is no fabrication drawing for the can at all (the Wing Can Spec Sheet lists the nine numbers a fabricator still needs); the mast weldment has no fabricator yet.

9. Software spec document. Still unwritten. The software changes are collected in Reference/Software_Ticket_v9_6.md.

10. Boat 1 route document. Still unwritten; it gates the Canaries refit timing.

17. Release trunk core count. Count at loom time; fire pairs 12 to 14 AWG.

18. Nav lights. Check each box for the USCG mark and a 24 V rating before they go up.

19. Strum box. Read the model off the part in the shop; if it is not the Whale SB3422, Build Guide 3.5 names the wrong part.

22. Heading-wander measurement. One hour of logged compass heading under self-steering once the boat floats. It sets the steering move budget, which matters more now that the Ewellix's rod-travel rating is lower than the Thomson's.

25. Dacian at Electrodacus. Confirm the SBMS0 firmware has the low-temperature charge stop (parameter 29) and that EXTIO4 closed means charging allowed. Add: what the SBMS0 reads with the XT1 probe unplugged. No mail has gone yet.

29. Duckbill cracking pressure. Record it at the Part 10 check with light breath pressure.

32. Flipsky pigtails. Ask for a COMM pigtail, a CAN pigtail and the COMM pinout; confirm the SinCos encoder voltage.

33. Nichrome bake-off. 28 AWG against 30 AWG, wet, at 24 V; winner goes in the Drogue Box Guide sec 9.

34. Cutters. Piranha PDLC-1000 price still to land. Spurs will fabricate the deadwood mounting plate for about $390 and needs the prop hub diameter to pick Model A or B.

35. Central node pins. Count again on the bench (17 of 22 with the expander). The Nucleo on the bench is a G431RB, not the KB the documents named; either is fine. The Ewellix drive takes native pins: recount at firmware time (item 102).

38. Weather pod parts. Return any pod housing or QwiicBus parts bought for the post.

61. Prop shaft seal: bare-shaft length. The Lasdrop DrySeal D-100 is chosen (needs 3-1/2 in of bare shaft between the stern tube end and the coupling). Measure it before ordering; polish or sleeve the shaft where the lip rides.

81. Bridle thimbles: decide on arrival (Mike, 2026-09-15). When the OceanBrake boxes land, look at the boat-end eye of each bridle leg. A stainless thimble spliced in means four 3/8 in 316 shackles and nothing else; a bare rope eye means four thimbles as well. Do not ask Angus.

96. Loose ends on purchases. Answered 2026-09-15: the four KSD301 discs and the MOOKEERF bare 18/4 roll have NOT gone back yet (windows 2026-10-04 and about 2026-10-08); the tinned 18/4 wing cable was never ordered anywhere and is on the buy list (Amazon B0D9JV83HJ, $36.99); the three Hailo-8L boards are one flying and two Boat 2 stock, not spares. Still unidentified: the Amazon line hidden "for privacy" (B07PH5H6DM, $11.49) and the two 1/2 x 1/2 in 316 square bars (item 106).

111. Iridium B's deck penetration, carved out of the "all four" answer (2026-09-15). Mike answered "all four" antenna cables through the post's deck stub. Three of them work: the GPS, Starlink and Iridium A antennas all sit at the platform. The fourth does not. Iridium B's antenna is on the foredeck about 18 ft forward, so bringing its coax aft to the post would leave 18 ft of cable lying on the open foredeck where green water breaks; and the set's own rule, from the single-point-of-failure work, is that the two Iridium chains share no antenna, cable, gland or fuse, which one shared stub would break (a flooded stub would take both satellite paths, the GPS and Starlink together). The documents now say: GPS, Starlink and Iridium A through the post stub; Iridium B through its own small penetration under its foredeck blister. That is two deck penetrations for antennas instead of five, and it costs one 1 in hole and one cord grip. Confirm, or say all four really do go aft.

87. Aft junction box size. With one switch it holds 10 RJ45 couplers and about 21 entries in a 12 x 8 x 5 in box. Measure before the loom; it may need a bigger box.

88. TSW202 bench test. Five checks: turn a PoE port off and on through the Web API and record the request and the firmware version; read the same port back over SNMP; read per-port watts; find out whether per-port power priority exists; power all seven devices at once and read the total. Pin the firmware. Launch Punch List item 38 is written around this.

89. Deliveries with clocks. Sea-Bird SBE 45 ships about 2026-10-26. OceanBrake drogues: freight paid 2026-09-09, no tracking yet. WD Blue 4 TB SSD due 2026-09-21. MEGA 250 A fuse due 2026-09-15. CX storage rack: FedEx failed twice. The Campbell BaroVUE 10 and HygroVUE 10: price and ship date from Josh.

92. Ewellix rod-travel budget. Ewellix rates the CAHB-22 at 5 km of double strokes. The voyage estimate was 11.2 km on the 190,000-move budget. Halve the moves by widening the deadband and lengthening the minimum interval; put the numbers in the System Settings Sheet; ask Ewellix what load their 5 km assumes.

93. Wing-tip mount detail. The G10 block in the top of the box spar, the meter arm and the terminal base are described but not drawn. Draw them before Stage 3 step 4.

94. Compliance link preload. 4 lbf initial. Tune at sea from the link-open alert; write the fit-out numbers in the wing records.

95. Pi A hull bond and the desiccant claim. Compute Bay 2.4 says desiccant cannot be the protection; the hull-bonded cooling session says that claim may be wrong. Check it when item 86 closes.

97. Switched-load channel 1: the enable relay or Starlink? Compute Bay sec 11 gives channel 1 to Starlink power; the Box Wiring Sheets draw the release enable relay as relay 1 of the same module. Settle it at fit-out before the lid labels are printed.

98. Science serial cables have no wall entries. Pi A is at 11 entries and none is for the three RS-232 cables and the RS-485 adapter. Decide where the powered USB hub lives and add the glands to the hole schedule.

99. Pod heater supply. The two pod heater pads (10 W each, so about 20 W together) used to run through the NearFi coupler. The coil pair that replaces it (item 108) has an unknown rating until the part is logged. When it is, either it carries the pad load or the pads run from the pod's own packs. Do not assume either way.

100. CLOSED 2026-09-15. The 1/4 in nylon tubing bought Sep 15 is for the tail and tab wiring only. The trailing-edge conduit is a separate bonded tube, 1/2 in inside diameter or more, and it now runs on to the wing tip carrying both the actuator cable and the wind meter cable, pulled at the same time at Stage 10.

101. Hull-glued box: bottom face versus bottom entries. The cooling session says glue the flat bottom of the box; Compute Bay secs 2.1 and 8 put the cable entries in the bottom face. Decide with item 86.

102. Ewellix drive pin count. Recount the central node's pins at firmware time (a reversing DC drive with current sensing takes native pins).

104. Drogue attachment rating. Withdrawn at revision 2: the attachment is justified by calculation against the 8,000 lb T8 fuse (each U-bolt breaks at 14,000 to 17,000 lb). Nothing left to do except keep the old 13,750 lb wording out of the documents.

108. Log the wing charging coil pair. Mike bought a 24 V inductive coil pair on Amazon on 2026-09-15 to replace the NearFi. No order confirmation had reached any mailbox by 10 pm, and the Taidacent part the buy list named comes in 12 V only, so it is a different product. Capture the part number and its rating at the next mail audit, then close item 99 with it.

110. Antenna cables through one stub: check the fit before the deck is closed. All four coaxes now share the post's 1 in deck stub and flexible conduit with the post bundle. Lay the whole bundle out on the bench and pass it through a sample stub before the real one is glassed in. The cable ends go through bare; the connectors are made up afterwards. If it will not pass, say so before the deck is closed, not after.

109. Buy list from the evening answers. Thomson Electrak MD MD24A025-0050CNO ($415, check the fairing against the STEP file first); Lasdrop DrySeal D-100 ($225, after item 61); a weatherproof 180 degree PoE fisheye for the foredeck ($150 to $200; return or reassign the FE-P); four release actuators for the T8 trigger cords ($1,000 allowance; PA-04-HS $197 each is a candidate); S1eX hydrophone (about $650) and a MOTU M2 interface (about $200); a second 50-pack of M6 x 12 mm 304 conical washers ($7); the CAN transceiver breakout for the wing pod; the tinned 18/4 shielded cable, 50 ft (Amazon B0D9JV83HJ, $36.99); PVC pipe and fittings for the four wet-lab chambers (about $120).


C. Closed at v9.6 (applied to the documents on 2026-09-15 and 16)

# What Where it went
105 Airmar 200WX DROPPED 2026-09-16. $1,700 saved. It duplicated the Calypso wind pair and the Campbell BaroVUE and HygroVUE, all already bought. Not in the design, do not re-propose Build Guide 8.2; Post Guide; Design Decisions; order sheet
103 Rudder rate ACCEPTED 2026-09-16. About 2 deg/s at the 12 in station is enough: at 2 to 3 kt the rudder's force comes from water speed, not swing rate; storm mode parks the rod and streams the drogue; and the slower move spends less of the 5 km rod-travel budget. One software job comes with it: lengthen the jam detector's stall timer, which was tuned to the faster Thomson. If more rate is ever wanted, an 8 in tiller station gives about 3 deg/s for a bracket move, not a purchase Build Guide 3.8, 8.4; Steering Handbook; System Settings 3; Design Decisions R-8.4C; Software Ticket
50 Battery percentage comes from the SBMS0 watchman, 2026-09-16. Its shunt is the only current sensor on the boat, and a separate shunt would add two bolted joints to the main negative for a number only needed roughly over days. Consequence: the SBMS0 USB serial lead stops being optional telemetry and becomes required; a stale stream sheds on a fixed conservative schedule and raises the quiet-watchman alert BMS Notes 6; System Settings 5; Design Decisions R-4.2A; Electronics 4.4; Battery Box Guide; Software Ticket
3 Dual-M.2 carrier: the carrier on hand seats both closed 2026-09-07
6 Defender AIS hold: the FCC licence and data log went to Defender 2026-09-15 Build Guide 8, punch list
11, 12, 13, 16, 20, 21, 24, 26, 28, 36, 39, 40, 41, 42, 43, 44, 45, 48, 49 Closed at v9.5 or on 2026-09-06/07 history
14, 37 Plate 3 mill cert received (NAS 125009 07, yield 32.22 ksi); no PMI check; priced at $743 for Boat 1's half BOM 15.2, Rig Base 7
15 Rig-bolt length: superseded by item 66 (3-1/2 in full-thread) Rig Base 7
23 Folder housekeeping: done at the 2026-09-05 reorganisation closed
27 Bellevilles: the two packs on hand cover the three-rod layout Battery Box Guide
30 Tinned 18/4: moved to item 96 (no order exists) -
31 ME1616 nameplate: the shaft seal is fitted (item 57); winding range accepted as 24 V class Build Guide 5.1
46, 47 Gas sensors deleted; cell-temperature trip written in (number in Part A) whole set
51 Instrument post head rebuilt Post Guide, Build Guide 8.3, Lightning 5
52 Wind sensor primacy: post primary Build Guide, Post Guide
53 No masthead; wing-tip lightning path Build Guide 6.7, Lightning 5.1, Wing Construction 10, 11
54 Wing proof test deleted; full-body bolts mandatory Wing Construction 12, 14; Build Guide 6.3, 11.1
55 Wet-lab flow meter at the end of the chain Wet Lab v3.6, Build Guide 12
56 Secure element deleted; key file on the SSD Build Guide 8.3, Compute Bay, BOM
57 ME1616 lip seal confirmed fitted Build Guide 5.1
58 Thermosiphon sizes Build Guide 5.2, BOM 15.5
59 Post cable entry by liquid-tight flex conduit (parts bought 2026-09-13) Post Guide 7 to 11, Build Guide 8
60 Cockpit floor stays; no shelf; no Delrin bushing; bellows boot Build Guide 3.2, 3.8; Steering Handbook 4, 7
61 Prop shaft seal: Lasdrop DrySeal D-100 (Mike, 2026-09-15 evening); bare-shaft length carried in Part B Build Guide 3.5, BOM 15.5
62 Wing trim actuator: Thomson Electrak MD on CAN (Mike, 2026-09-15 evening); the Ultra Motion A2 is history Trim Actuator Guide, Wing Power 7, Compute Bay 10.2, BOM 15.6
63 NearFi coupler deleted; cheap 24 V coil pair ordered (part in item 108) Wing Power, Build Guide 6, Can sheet, BOM
64, 65, 66 Deck is a 7:48 gable; bulkhead tops doubled, G10 caps deleted; 3-1/2 in bolts with heads welded under the rail Build Guide 3.1, 3.3; Rig Base
67 Rig rail: 316 with welded heads, confirmed (Mike, 2026-09-15 evening); the aluminum-angle answer is withdrawn Build Guide 3.3, Rig Base 5, BOM
68 Ewellix CAHB-22 confirmed as the steering actuator Steering Handbook, Build Guide 8.4, Electronics, Compute Bay, BOM
69 Barometer arm on the STARBOARD face at 44 in, reflector below it; strap stays port Post Guide, Lightning 5.3, Barometer document
70 Wind sensors: CMI1018 on the post, CMI1017 at the wing tip, confirmed Build Guide 8.2, Post Guide, Wing Power 7
71 GPS: the NEO-7M modules bought are the receivers Build Guide 8, Compute Bay, Electronics, BOM
72 Interior PoE lights kept Electronics 6.4, BOM
73 Foredeck camera: the FE-P is replaced by a weatherproof fisheye (to buy) Electronics 6.1, BOM
74 Drogue release: T8 shackles as bought; the four cord-pulling actuators still to buy; v2.1 dead Build Guide 7.3, Drogue Box Guide 6, BOM
75 Drogue attachment justified by calculation; no proof pull; as built with two U-bolts per quarter on a G10 pad (photos in Reference) Build Guide 3.6, 7.2, 11.1; Drogue Box Guide 4
82 Air terminals cut from the 1/4 x 3/4 in 304 flat bar bought Sep 13; the 1/2 in rod spec withdrawn Post Guide, Lightning 5, Build Guide 6.7
83 Hydrophone: the S1eX with a MOTU M2 interface; AS-1 order to cancel (item 107) Science Payload 3, 7; BOM 15.11
84 Campbell BaroVUE 10 and HygroVUE 10 confirmed ordered Barometer document, Science Payload 3, BOM
85 Fairview stubs on hand; the unpaid hold order is a duplicate to cancel BOM 15.8
47 Battery over-temperature trip set at 150 F, with the 10 F in five minutes rule, release below 120 F after an hour, and a warning at 131 F (Mike, 2026-09-15) System Settings 4 and 6, BMS Notes, Battery Box Guide, Build Guide, Routing 11.7
76 No serial expansion boards: the FTDI cables and the hub are the only serial path (Mike, 2026-09-15) Compute Bay 4, Electronics 8, BOM 15.8
77 Wet-lab chambers built from ordinary Schedule 40 PVC fittings (Mike, 2026-09-15) Wet Lab v3.6, Science Payload 5 and 13, BOM 15.11
78 One-part Rust-Oleum Topside everywhere above the waterline; two-part polyurethane out of the set (Mike, 2026-09-15) Build Guide 3.1, Wing Construction, Post Guide, BOM 15.3
79 All four antenna cables go up through the single post deck stub; the four separate standpipes and deck seals are deleted (Mike, 2026-09-15) Post Guide 7 to 16, Build Guide 8.3, Electronics A13, BOM
80 The wing-tip wind meter cable shares the trailing-edge conduit; the conduit runs to the tip and both cables are pulled together at Stage 10 (Mike, 2026-09-15, on Claude's recommendation) Wing Construction 10 and 11, Wing Power 7, Trim Actuator 4
91 Three Hailo-8L bought because they were cheap: one flies, two are Boat 2 stock, not spares BOM 15.8, Compute Bay 4.1, Electronics 2.6
107 The Aquarian AS-1 order is cancelled; the S1eX is the hydrophone Order sheet, BOM 15.11
cloud 46 XT1 ice-water calibration test Battery Box Guide 8, 10; BMS Notes
cloud 51 to 59 Serial ports, one TSW202 switch always on, PoE lights identified, supply upgrade withdrawn Electronics, Compute Bay, BOM, punch list
cloud (2026-09-08) ZED-F9P pair deleted; position only, IMU heading Build Guide 8, Compute Bay, Electronics, System Settings, BOM
cloud (2026-09-09) Barometer document joins the set; pressure port on a post arm Barometer and Pressure Port v9.6, Science Payload 3
cloud (2026-09-14) Wing can re-specified as 304 16 in Sch 10 pipe Wing Can Spec Sheet, Build Guide 3.3, BOM 15.2
cloud (2026-09-14/15) Compliance link is the wind-load fuse; weekly light-wind sweep Trim Actuator Guide 6, 7, 8
buy list (2026-09-12 to 15) Camera window 40 x 4 mm with captive bronze nuts; WOD lid gasket; pod parts; thermosiphon; smalls Build Guide, Camera Port Guide, Battery Box Guide, Wing Power, BOM
Sep 6 fixes Charging continues after the 10 minute bypass; sec 14 marked stale; paint table; camera angle 38 degrees; Boat 1 steering block; plain MOV and PV modules Build Guide, Battery Box Guide, Bottom Painting Guide, Camera Port Guide, Steering Handbook, BOM