Based on GitBoat main, Oct 24, 2026 (v10.3 + Pending v10.4). Every wire: VESC_A_Box_Wiring_2026-10-14. Capacitor hookup: Cap_Board_Drawing_2026-10-14. Two-page print: VESC_A_Box_Build_Sheet_2026-10-26.pdf.
Nothing left to ask for this box (Oct 26).
Still to read off the parts in step 2: the servo, sensor and switch plug types, the motor lead size and the floor screw threads.
VESC Tool, at first power-up (step 20). From System Settings Sheet sec 2.
| Setting | Value |
|---|
On hand and Needed come from the order tracker and the guides as of Oct 24. Parts marked Not fitted stay visible so they are not fitted. A photo marked similar part is not the exact one.
Click a part's name to see what it looks like. Tick it when it is in the pile. Ticks are saved in this browser only.
Drawn from Mike's photo of the parts in the box (Oct 26), looking down with the battery end on the left and the motor end on the right. About to scale, 1 grid square = 1 in; inside about 11.2 x 7.6 in. Corners: 1 top-left, 2 top-right, 3 bottom-right, 4 bottom-left. Mirror it if the box sits the other way.
From the photo: the Flipsky is 5-1/8 x 2-11/16 in (130 x 68 mm, Flipsky's spec), its battery leads come out the end toward the posts and its motor leads out the other end. The switch and sensor plugs are on the side toward the bottom wall, CAN and USB on the side toward the top wall, COMM and servo at the motor end. The power button and its lead come out: the shorted plug replaces them. The USB lead stays coiled inside for VESC Tool with the lid off (Claude's pick). The box has a ledge with holes along each end wall and a boss low on each long side: keep studs and holes clear of them.
| Part | Fixing | Hole |
|---|---|---|
| Box to hull | Floor glued straight to the hull in the heat-carrying epoxy, a glass tab round the edge, a strap or bolts into a glued-on pad as backup. Wired to nothing. | none |
| Flipsky | Four 316 flat-head screws from outside, up through the floor into its own threaded holes (1-9/16 x 4-23/32 in apart; full-size sheet Flipsky_Hole_Pattern_2026-10-26), heads flush, before the box is glued. Gap pad between board and floor. It stays in for good (Mike, Oct 26). | to its holes, countersunk outside |
| Power posts | The same kind of studs, two per post (a guess at the post's base holes). | to its holes, countersunk outside |
| Capacitors and WAGOs | Glued to the floor with neutral-cure silicone, stripes all one way, levers up. | none |
| Phase joints | Lug to lug on a 3/8-16 x 1 in 316 bolt, washer each side, nyloc. Glue-lined heat-shrink over. The three tied into a tight bundle. | none |
| Plug leads, desiccant | Zip ties; the desiccant on a dab of the silicone. | none |
| From | To | Wire |
|---|
Each drilled wall seen from outside, rim (lid side) up. Number the corners on the box as on the floor plan first. All eight centers 1 in below the rim. Battery end: + and −. Motor end: the three motor leads. Top side: CAN. Bottom side: sensor and Pi A cable. No vent.
| Mark | What passes | Gland | Hole | Center |
|---|
| Item | What the documents say | Whose |
|---|
| Decision | Why it matters here | Tracked | Whose |
|---|
Names used: Electronics plan = Electronics and Wiring Plan v10.3 · Compute Bay = Compute Bay Housing and Wiring Plan v10.3 · BOM = Bill of Materials v10.3 · Pending = Pending Amendments v10.4 · Box Wiring Sheet = Box Wiring Sheets v10.3. Where a guide lags a Pending item, Pending wins.