One drawing per box: what lives inside it, how the pieces wire to each other, and every cable through the wall. Companion to the Electronics and Wiring Plan; entry numbers and gland sizes match Appendix A hole for hole. Every decision in the v10.5 guides is drawn in, the slip ring through the wing’s turning joint among them.
How to read a sheet. The heavy outline is the box wall. Blocks inside are the boards and parts that live in the box; colored lines are the wires between them. Numbered circles on the wall are the cable entries, numbered exactly as in Appendix A of the wiring plan, with the gland size under each and where the cable goes just below. Every entry is a nylon IP68 gland unless it is marked as an RJ45 coupler or an SMA bulkhead, and only cables that leave the cabin get a mix-31 ferrite, on the outside (Electronics and Wiring Plan sec 7.5). Entry positions on these sheets are drawn for readability; the real holes go where the drilling templates put them.
The box plans. The sheets to build a box from are the box plans in Box Plans v10.5/: one 4-page PDF per box (parts with photos, the layout, the wiring diagram, every wire), plus Box Plans Cross Check v10.5.pdf, Main Bus Board Changes v10.5.pdf, Backup Battery Board Changes v10.5.pdf and SBMS0 Setup and Shunt Wires v10.5.pdf (Electronics and Wiring Plan Appendix A). These sheets show how the boxes fit together.
Printing. US letter, landscape. Each sheet prints as its drawing on one page and its notes on the next; the simplest boxes (A5, A13) fit drawing and notes on one page.
| Sheet | Box | Holes |
|---|---|---|
| 0 | The whole network, box to box | |
| A1 | Pi A box (aluminum, main island, lightning stud) | 9 + B (S and 7 share one split gland; 12, S to the hub box; 7 Iridium A; 5 not drilled) |
| A1a | USB hub box (beside Pi A; the hub, science adapters, dAISy and wing readers; the MOTU M2 in its own box) | 3 on one side wall: two split glands, a small gland between |
| A2 | Pi B box (aluminum, backup island, floats; Iridium B’s USB isolator and Pi B’s wing CAN adapter inside) | 9 (7 a split gland, 4 the wing CAN link) |
| A3 | Central node (release, two relay modules and the enable relay’s own 30 A module, the Ewellix steering drive, the nav light fuses and 12 V converters, the wind meter’s 5 V board; the post cables and the bilge cable come straight in) | 20 + V (14 not drilled; 17 a 4-port split gland; none on top) |
| A4 | BMS box as bought, on a long side wall of the battery box (watchman; monitoring only; one gland per cable, no vent) | 4 |
| A5 | FSESC box: deleted, neither boat | none |
| A6 | Aft junction: none on Boat 1 (its cables run straight to the central node) | none |
| A6a | Network switch box (aluminum, at the stern, glued to the hull; the TSW202 switch and its supply only, on a DIN rail), with the network surge board near the deck (the five Ethernet surge protectors, not a box) | 10 |
| A7 | VESC A box (main propulsion; CXCESNS aluminum, its floor glued to the hull) | 8 |
| A8 | VESC B box: Boat 2 only, not fitted on Boat 1 | 7 (Boat 2) |
| A9 | Battery box (main bank; one gland per signal cable) | 5 + V + relief stub + fuse, BMS box bolts |
| A10 | Emergency bank: a bought Dyness battery and the backup battery board beside it, no box to build | none |
| A11-A | Iridium A box (main island; its own USB cable to Pi A) | 3 |
| A11-B | Iridium B box (emergency island; its own USB cable to Pi B) | 3 |
| A12 | Detector mini-box (Playing With Fusion AS3935 board, 5 V) | 1 |
| A13 | Starlink Mini (deck, no box) | none + deck stub |
| A14 | Native devices, no drilling; the wing through its slip ring into the new wing box below the deck, where the wing's wires enter the hull | tee + drop; wing box: 6 |
| A15 | Release Node B (second release chain, stern) | 4 |
| A16 | Transom terminal box: DELETED (the release cables run straight to the stern) | none |
| A18 | Wet lab box (plastic, beside the wet lab; a house bus node that switches each wet lab part and reads its sensors) | 3 split glands, no vent |
| R1 | Release path map: which node releases what | no box |
What it shows. Two CAN rails, one Ethernet star, and one floating island. Steering and release channels ride the control bus; the busier monitoring traffic rides the house bus. Only the Pis touch both rails. Boat 1 steers with one actuator; there is no FSESC box.
Bus power. The house bus carries 12 V on its power pair, fed once from its own 5 A breaker at the main bus board and its own 24 to 12 V converter at the compute multiport, through the house power tee; the em-trak’s bus interface draws from it. The control bus carries no power: on every control drop the red core is cut back and taped at both ends, and the black core lands on the device’s CAN ground (each Pi HAT’s G terminal, the central node’s 0 V, VESC A’s CAN GND) as the ground reference. The Waveshare HAT powers its own isolated CAN side, the node’s CAN board runs off the Nucleo’s 3.3 V, and the VESC’s CAN port takes no power.
Emergency island. Pi B, Iridium B, the lightning detector and bilge pump 2 run on the emergency bank with no copper path to the main system. Every one of their data links crosses on an isolator, a transformer, or plain UTP (unshielded network cable), whose bulkhead jack’s metal touches no wire or shield. Two power bridges, each isolated by its own transformer: the Orion-Tr, a charger into the emergency bank, which central node relay channel 10 runs 90 minutes a day; and the backup converter out of it, which feeds the main bus board’s backup-fed bar (steering, the wing box, the central node and both release feeds) only when the main side is dead (Sheet A10). Pi B also reaches the wing actuator on its own CAN adapter (Sheet A2).
Bus order as built. Control: the 4-port multiport (Pi A, Pi B), its free end taking the terminator, then VESC A and the central node, the bus end. The Electrak tee is Boat 2 only and unwired; Boat 1 steers with the Ewellix CAHB-22, a plain DC actuator driven from the central node, not a bus device. House: power tee, multiport, em-trak, VESC B (Boat 2 only; its tee is unwired on Boat 1), the wet lab box (A18), and Release Node B as the bus end. The terminators (the 120 ohm end resistors) sit on the spare port of the end tees, on the control bus the 4-port tee’s free end; HAT termination jumpers off.
Also shown. Release Node B (Sheet A15) at the stern. The network switch box (Sheet A6a) at the stern takes every network cable. Boat 1 has no aft junction box (Sheet A6): the post lights cable, the post wind meter cable, rudder encoder A’s lead and the bilge cable each run in one piece straight to the central node (Sheet A3). The central node’s release cables run straight to the stern, with no terminal box (A16 deleted, 2026-10-27). The USB hub box beside Pi A (A1a), the Orion-Tr on the backup battery board (A10), the wet lab box (A18) on its own house bus tee, and the wing on its slip ring, no radio, into the wing box below the deck (A14). The wing box sends one shielded 4-pair cable to the hub box, where Pi A reads the tip wind meter and the wing compass and talks to the trim actuator on the actuator’s own CAN link, kept off both buses. Each Iridium modem talks over its own USB cable through a USB isolator: Iridium A on Pi A’s second USB port, its isolator inside the Pi A box, Iridium B on a USB port inside the Pi B box (A11-A, A11-B).
What it is. The main brain. Glued to the hull below the waterline for cooling, at least 2 ft from the main battery and motor cables where space allows, for the IMUs (a guess at a safe distance); bond stud wired to the lightning copper. Entries go on any face but the glued back face, with drip loops (drawn on the bottom). Every line from off the island crosses an isolator or an optocoupler before it touches the CM5.
Power. The 10 A breaker at the bar (entry 1), then inside: the TVS, the terminal strip, WD-A’s relay and the Mean Well DDR-60L-5 converter (5 V 12 A, 18 to 75 V in, isolated, on a short DIN rail at the far end of the plate from the IMUs; output set to 5.1 V, output negative tied to input negative), then the carrier. The relay is a 5 V 1-channel module with Pi A’s 24 V feed through its normally closed contact, ahead of the converter: coil off means Pi A on, so a dead Nano leaves Pi A running. WD-A cycles Pi A after five minutes of heartbeat silence. WD-A runs on its own Pololu D36V6F5, fed ahead of the relay, so the relay never cuts it. The hub’s 5 V lead takes off the converter’s output on a 3 A inline fuse and leaves by entry 12, so the hub restarts whenever WD-A cycles Pi A.
Entries. Ten, plus the bond stud: 1 to 4, 6 to 8, 11, 12 and S, in nine holes. Not drilled: 5 (Iridium A’s cable comes in at entry 7), 9 and 10 (Pi B and Starlink run to the TSW202), 13 (no wing radio) and 14 (no RTL-SDR). One mix-31 ferrite, on the GPS A coax only. The CAN shield drain lands on the bond stud here and nowhere else. On the control drop (entry 2) the red core is cut back and taped at both ends and the black core lands on the HAT’s G terminal as the ground reference: the control bus carries no power. Entry S carries the hub’s USB lead to Pi A’s first USB port, with no USB isolator; entry 7 Iridium A’s own RockBLOCK USB cable (Sheet A11-A), plug on, to its DSD TECH SH-G01A USB isolator inside this box, tied down and staked, which plugs into Pi A’s second USB port (Mike, 2026-10-20), so a hung hub cannot cut off the main satellite link; never the cable straight into the Pi, and a USB extension, if needed, goes on the Pi side of the isolator. S and 7 share one Altelix PG25 4-port split gland (on hand; two ports plugged; Mike, 2026-10-14), so both USB plugs pass without cutting. The kill line (entry 4, beside the VESC UART) and the alive line to Pi B (entry 6) leave WD-A through a HiLetgo PC817 optocoupler board; for the kill line its V2 goes on the kill core and its G on the ground core, which land on the VESC’s servo plug PPM and GND (Sheet A7). The Ethernet bulkhead jack’s outside face is greased and taped (Sheet A6a).
Inside. Two IMUs, A1 and A2 (BNO085), on the same I2C pair, A2 at the chip’s second address, one at each end of the plate, far from the converter, each with a forward arrow on the plate. The safe-mode wire runs from a WD-A output pin to header pin 37, the 15k in the wire and the 22k from pin 37 to ground, so the pin sees about 3 V, not 5 V; no box hole. Pi A’s motor kill pin, when assigned, must not use pin 37. No vent; desiccant, humidity breakout; boards conformal-coated. The 4 TB NVMe and the Hailo-8L go in the carrier’s two M.2 slots; bench-prove both. GPS A is a NEO-7M, position only. USB cables clamped within 2 in of their plugs, plug bodies staked. FTDI chips only, never CH340.
USB hub box. On its own sheet, A1a: the hub, the science adapters, the dAISy and the wing’s two readers. Two leads link it to Pi A: the hub’s 5 V lead (entry 12) and the hub’s USB lead (entry S).
What it is. A small box of its own beside Pi A (Electronics plan A1a), because Pi A’s box is full. It holds the USB hub and everything that plugs into it, the wing’s two readers among them. It is on no bus: its only data link to the computer is the hub’s USB lead to Pi A. Mike built it 2026-10-22 and it is installed; where his photos and the guides differ, the build stands. The box is a TICONN IP67 box with a clear hinged lid, two steel latches and a grid mounting plate, standing upright with the lid facing out, about 12 x 8 x 5 in (inferred: most likely one of the three TICONN boxes of the 2026-08-16 order; scaled off the StarTech hub, 7.8 in (198 mm) long, it is about 10 x 7 in inside). Every wire, from and to: Box Plans v10.5/USB Hub Box v10.5.pdf.
Power. Two feeds. The hub runs off Pi A’s 5 V (Mike, 2026-11-04: “pi a 5”): a 16 AWG 2-core lead from Pi A’s Mean Well, on a 3 A fuse inside the Pi A box, out by Pi A entry 12 and in by one of this box’s three glands, so the hub restarts whenever WD-A cycles Pi A. It ends in a DC barrel plug in the hub’s barrel socket, not on its green terminal (both take 5 to 24 V). A ready-made barrel plug lead is usually 20 to 22 AWG (Claude’s general knowledge), so keep the thin part to the last few inches at the plug and run 16 AWG the rest. The box keeps its 12 V converter as built (Mike, 2026-11-04). The box’s own 24 V feed (16/2 on its own 5 A breaker at the branch bar) lands on TB1-1 and TB1-2 and feeds only the third YRDZXG 24 to 12 V converter, with no fuse on either side of it: the 5 A breaker is the only protection (Mike, 2026-10-14); the 12 V goes out with the SDI-12 line to the BaroVUE 10 and HygroVUE 10, never the 24 V bus. One 1.5KE33CA surge diode sits across the 24 V input, one leg under TB1-1 and one under TB1-2, ahead of the converter, legs short and sleeved; it works either way round (Mike, 2026-10-22).
The hub. StarTech USB210AIND, 10 ports, 5 to 24 V in on a barrel socket or a green terminal; its lead takes the barrel socket. On M3 nylon standoffs (the kit on hand), not a DIN rail; zip ties round the hub body and across the plug grips hold every plug in; no screw-lock cables (Mike, 2026-10-19). Its ports, eight in use: the SDI-12 adapter, the SBE 45’s FTDI USB-RS232-WE-1800-BT-0.0 cable (RS-232, Mike 2026-10-14; the 0 V version, no power out on its wires), the DO sensor’s FTDI cable, the Waveshare wing reader, the wing’s CAN adapter, the dAISy, the SBMS0 lead and the MOTU M2’s lead; two spare. Any device may take any port: each is named by its serial number. The DO sensor’s and SBE 45’s FTDI cables run on to the wet lab box (Sheet A18), their bare ends joining the sensors’ cables on terminals. Its own USB lead is detachable: clamp and stake it at both ends.
The MOTU M2 is in its own box (Mike, 2026-10-20), not this one: only its USB lead comes in, by a split gland, to a hub port.
Wall entries, as built (Mike’s photos, 2026-11-04). Three glands, all on one side wall: two large split glands with a small gland between them. None on the top or bottom wall. The cables through them: the hub’s USB lead to Pi A, the wing cable, the SBMS0 lead, the AIS coax, the MOTU M2’s lead, the hub’s 5 V lead, the BaroVUE 10’s and HygroVUE 10’s own cables, the SBE 45 line, the DO sensor line and the 24 V 16/2 (oval; a slit seal closes only round a round cable). Each cable in a split gland port must be 0.15 to 0.30 in (4 to 7.6 mm) across to seal. A cable lays into its slit from the side, so no plug is cut off and a bare end needs no threading. The drawing shows each cable where it reaches its part, not its gland.
The weather sensors. Each sensor’s own Campbell cable runs whole into a split gland. Wire colors, from Campbell’s manuals (read the cable labels to be sure): BaroVUE red 12 V, black ground, white SDI-12, blue and yellow (its RS-232 pair) cut short and taped; HygroVUE brown 12 V, black ground, white SDI-12, clear shield to 0 V. The SDI-12 adapter’s top-left block: facing its holes with the board right side up, the pins are −, data, + from left to right (maker’s manual, p. 10); data to TB1-8, − to TB1-4, + empty; its jumper as shipped (USB 5 V); Ex. PWR empty. Plan: Box Plans v10.5/USB Hub Box v10.5.pdf. Set the HygroVUE to address 1 before it joins the BaroVUE.
AIS. The dAISy 2+ has a BNC antenna socket and a mini USB port (Tindie and Starpath listings). The Eifagur stubby VHF antenna’s 16 ft of RG-58 ends in a PL-259; it joins a Superbat 1 ft SO-239 to BNC jumper, whose BNC end plugs into the dAISy. As built (Claude’s reading of Mike’s photo), the AIS coax leaves the box through the lower split gland with a UHF plug on its outside end, so its joint to the antenna lead sits outside the box. Wrap that joint in self-amalgamating tape once it is made (Claude’s suggestion), since a UHF joint is not sealed. A flexible jumper, not a solid adapter, so the coax’s weight never levers on the dAISy’s socket. No SMA bulkhead and no SMA to SO-239 jumper. AIS from the dAISy depends on the hub; the em-trak is the second receiver.
Iridium A is not in this box: its own USB cable goes to its USB isolator on Pi A’s second USB port, in the Pi A box (Sheet A1; Mike, 2026-10-20).
The wing. The wing cable from the wing box (Sheet A14) is Mike’s shielded Cat6 on hand, about 5 ft, plugs cut off, in by a split gland. It lands straight on the Waveshare reader’s screw terminals, with no terminal strip between (Claude’s reading of Mike’s photo: its orange and green pairs are seen there): orange to channel 1 (the tip meter), green to channel 2 (the compass), brown to the readers’ grounds and the CAN adapter’s GND, blue to the DSD TECH SH-C30G (the trim actuator’s CAN pair, 120 ohm switch on). It is most likely solid 23 AWG: strap it within a few inches of the box, and its wires go into the terminals bare, no ferrule. The Waveshare’s terminators are off. Pi B’s wing link taps the wing CAN pair at the wing box (Sheet A14), not here, so nothing is drilled in this box. The brown ground is tied to the wing’s 24 V negative in the wing box. The shield is grounded at the wing box only: here it is trimmed flush and sleeved, touching nothing. Both readers are isolated, so a strike on the wing stops at them. The CAN adapter is on a hub port (Mike, 2026-10-20), so the actuator’s control depends on the hub, as the readers do.
Rules. FTDI chips only for serial, never CH340. Every USB plug clamped within 2 in and staked. No fuse in this box (Mike, 2026-10-14). No USB isolator on the hub’s own lead (one 5 V supply: it would isolate nothing). Not fitted: the DROK 24 to 5 V converter bought for the hub, and a relay to cycle the hub alone. If the hub drops off, Pi A tries a USB reset, then stops its heartbeat so WD-A cycles Pi A and the hub together.
Open: which cable takes which gland; a look at the box settles it. Open: the wing Cat6’s landing on the Waveshare reader; Mike’s word settles it. Open: which bus bar stud feeds it, the end stud or stud 8. The Cat6 on hand is 0.225 in across (Mike, 2026-10-29), inside a split port’s 0.15 to 0.30 in range. Open: the MOTU M2’s own box; picking it settles it.
What it is. The backup brain, a few feet from Pi A on the settee panel, electrically nowhere near it. Power comes from the emergency bank only: 14/2 from its own 5 A auto-reset breaker on the backup battery board (Sheet A10), in by entry 1 (PG11, 3/4 in hole), then a terminal strip, WD-B’s relay and its own potted Klnuoxj 24 to 5 V converter with TVS, the negative left floating (tied to nothing). That breaker is Pi B’s only protection: no fuse in this box. The relay is a 5 V 1-channel module with Pi B’s 24 V feed through its normally closed contact, ahead of the converter: coil off means Pi B on, so a dead Nano leaves Pi B running. WD-B runs on its own Pololu D36V6F5, fed ahead of the relay, so the relay never cuts it.
Data links. Every data link crosses on something that does not conduct: the CAN HAT’s isolation, the Ethernet jack’s transformer, a DSD TECH SH-G01A USB isolator on Iridium B’s USB cable, and a HiLetgo PC817 optocoupler board on the alive signal from Pi A. Iridium B’s own RockBLOCK cable (Sheet A11-B) comes in plug on by a split gland at entry 7 and plugs into the isolator, which plugs into a Pi B USB port; never the cable straight into Pi B. On the control CAN drop (entry 2) the red core is cut back and taped at both ends and the black core lands on the HAT’s G terminal as the ground reference: the control bus carries no power. Open: which split gland for entry 7; none is on the buy list yet. Entry 4, the wing (2026-11-01): a second DSD TECH SH-C30G isolated USB to CAN adapter (Amazon B0CDGGBZDT) on a Pi B USB port, out by entry 4 to the wing actuator’s CAN link as a third drop, so Pi B trims the wing when it is in command (only then; the two Pis never both command the actuator). Pi B’s USB then carries two: Iridium B’s isolator and this adapter. It joins the wing CAN pair at the wing box (Sheet A14), not at the hub box (Mike, 2026-11-04), so nothing is drilled in the installed hub box; its 120 ohm switch is off, since its run is a branch (the hub box adapter’s stays on, inferred). Open: entry 4’s gland; settled at fit-out.
Backup duties (2026-11-01). WD-B reads the backup battery’s voltage through two resistors (a divider, from the resistor kit on hand) into a spare analog pin and passes it to Pi B on their serial line; no shunt. Both wires of that serial line run through one HiLetgo 4-channel logic level converter board (10-pack on hand, bought 2026-10-06), in this box, its 5 V side to WD-B and its 3.3 V side to Pi B (Mike, 2026-11-02): the line carries a 5 V Nano output into a 3.3 V Pi pin, and the board also gives Pi B’s 3.3 V send a clean 5 V at WD-B. Drawn in the Pi B Box plan. WD-B watches bilge pump 2’s running line and wakes Pi B at once. Pi B switches pump 2’s manual-on, runs its monthly 5-second exercise (shore can run pump 2, never stop it) and holds the remote on/off of the backup converter (on only when the main side is truly dead; Sheet A10). Pi B wakes on its own clock alarm, set before each shutdown; WD-B’s power cycle is the fallback. Open: where pump 2’s two signal wires and the two remote wires enter this box, and which relay module switches pump 2’s manual-on.
Lightning detector. WD-B owns the whole lightning role and reads the Playing With Fusion AS3935 board (Sheet A12) at 5 V, straight from its own D36V6F5 rail, so no level shifter: a Belden 6504FE lead under 3 ft, five cores used, in by entry 6 (PG7); the drain lands here only, on the island’s floating negative. Red 5 V, black ground, blue IRQ to D2, green SCL to A5, white SDA to A4. Open: the 5 V surge diode across the lead’s red and black, inside this box; picking a 5 V part settles it. WD-B never cuts Pi B’s power for lightning.
The five isolation rules, drawn. 1) Emergency-bank power only. 2) Every data link optical, transformer coupled or through an isolator. 3) No metal shell or shield ties this box to Pi A: plastic glands, plain UTP (unshielded network cable), so the Alrhso bulkhead jack’s zinc and plastic body touches no wire or shield; its outside face greased and taped (Sheet A6a). 4) No bond stud. 5) Everything else on the emergency bank (Iridium B, detector, WD-B) lives on this side.
What it is. The one team-built node: a Nucleo, screw-terminal boards and a DIN rail where every field wire lands first. It triggers the releases, switches the loads, feeds the nav lights, drives the Ewellix and reads the sensors. Its own hardware watchdog restarts it if it hangs; on the backup side Pi B can also power-cycle it by cycling the backup converter. Its feed (line 3), the release feeder (line 4) and steering (line 5) come from the main bus board’s backup-fed bar, so with the main side dead the backup converter powers it; each power-up that way keeps the fail-ON channels (nav lights, em-trak, UV-C) off unless wanted. Print the relay map (Compute Bay Plan sec 11, table below) on the lid. The box (Mike, 2026-11-02): the TICONN IP67 clear-lid box, 17.7 x 13.8 x 7.9 in outside, 16-7/8 x 12-7/8 x 7-1/2 in inside, grid mounting plate 15-7/8 x 11-3/4 x 1/8 in, two 304 latches, $94.99 (Amazon B0BZR3M8PK), ordered 2026-11-02. The plan’s parts and three rails take about 14.4 x 10.5 in of plate and its 15 bottom glands about 13.5 in of wall, too much for the 12.9 x 9 in box on hand. One box, not two: two would need a 20-plus core cable between them. The Central Node box plan is drawn for it. The CAN board keeps its soldered 4-pin header and takes a ready-made 4-pin 0.1 in female plug with 24 AWG wire, zip-tied on (Electronics plan sec 4).
Reading the drawing. Red: the release enable relay, on its own HiLetgo 24 V 30 A single-channel module (Mike, 2026-10-31), the kind Release Node B uses; channel 5 of module 1 is spare. The 8-channel board’s changeover relays are rated about 7 A at 30 V DC (Songle’s datasheet; the relay type is inferred), against a burn wire’s 12.5 A per horn for up to 60 s. Amber outline: channels 9 to 11 and the fuses drawn as blocks. Dashed blue: logic lines. Dashed circles: the release feeder, entry 10, and the bow lantern, entry 7, each sized at fit-out. The holes (Mike, 2026-10-31): none on top (Electronics plan sec 7.1), numbered in one walk round the box: 1 to 16 along the bottom wall, left to right (14 not drilled: no charge stop); 17 to 19 down the right wall; 20, 21 and the vent down the left wall, the vent high. No spares drilled: a new cable gets a new hole on a side or bottom wall and the next number, 22 on. Entry 2 is the control CAN drop and the bus end: its red core is cut back and taped at both ends and its black core lands on this box’s 0 V as the ground reference (the control bus carries no power). Entry 20 (left wall) brings the wet lab’s own 16/2 line in from its 15 A breaker to channel 2; it leaves on its own 16/2 by entry 6, straight to the wet lab box (Sheet A18). Entries 5 to 9 take one cable each: 5 ch 1 to the Starlink Mini’s DC input, 6 ch 2 to the wet lab box and 8 ch 4 to the em-trak, each a 16/2 in a PG9, sealant-filled (Mike, 2026-10-31); 7 the bow lantern and 9 the bilge cable (below). Entry 18 (right wall) takes the horn’s 16 AWG pair from relay channel 13, through its 5 A inline fuse, to the horn low on the instrument post. One cable per gland for the two 1-wire chains (Mike, 2026-10-13): entry 21 (left wall) takes chain 1, the six battery probes’ 20/3 trunk straight from the battery box (Sheet A9 entry 3b, never through the BMS box); entry 19 (right wall) takes chain 2, the air probes, on a 22/12 offcut (0.24 in) in a PG7; it lands on the DIN rail and goes on to the Nucleo. Entry 16, the Orion-Tr remote pair, is a sealant-filled PG9 (5/8 in hole), like the other 16/2 entries: the pair carries only a few milliamps through the relay contact, so it is 16/2 if the 16/2 roll has about 17 ft left after its branch lines, else 18/2 (Backup Battery Board Changes plan).
| Relay ch | What it switches | Contact | Coil driven from |
|---|---|---|---|
| 1 | Starlink power, through a 5 A fuse after the contact; its own 16/2 straight to the Mini’s DC input | Normally open | Expander |
| 2 | Science payload group: the wet lab’s own 15 A line, in by entry 20, on its own 16/2 straight to the wet lab box (Sheet A18); on only around each wet lab burst (Claude’s pick) | Normally open | Expander |
| 3 | Nav lights, sunset to sunrise, and by day too in fog mode: F2 (1 A) to the stern light on the post lights cable (entry 17 port a); F4 (1 A) and the bow lantern’s 12 V converter, out by entry 7 | Normally closed: a dead node leaves the boat lit | Expander |
| 4 | em-trak AIS transponder, through a 2 A fuse after the contact; its own 16/2 straight to the em-trak | Normally closed: fails ON | Expander |
| 5 | Spare. The release enable relay is on its own 30 A module (normally open: dead, the bus is dead; coil on native pin D3) | none | none |
| 6 | Bilge pump 1 manual-on, through a 5 A fuse after the contact; the red of the bilge cable (entry 9) | Normally open | Expander |
| 7 | Motoring whites: through a 0.5 A fuse after the contact, straight to the whites’ 12 V converter, out on the post lights cable (entry 17 port a); on only when dark and the motor runs; in fog mode, whenever the motor runs | Normally open: a dead node leaves them off | Expander |
| 8 | Spare (no charge stop: the chargers always charge) | none | none |
| 9 | Camera port UV-C, 5 min on and 10 off, in software, through a 0.5 A fuse after the contact | Normally closed: a dead node leaves the UV on | Expander (module 2) |
| 10 | Orion-Tr on/off: 90 minutes a day, and the monthly recharge | Normally open: a dead node leaves it off | Expander (module 2) |
| 11 | Cord puller reverse (test): coils of the four reversing relays | Normally open: dead, the pullers run forward only | Expander (module 2) |
| 12 | Spare. Bilge pump 2’s manual-on and its monthly 5-second run are on Pi B’s side (Sheet A2); the white of the bilge cable is unused | none | none |
| 13 | Horn: its 24 V through a 5 A inline fuse, out by entry 18 to the post; shore command, and one long blast every 2 minutes in fog mode | Normally open: a dead node leaves it silent | Expander PB3 |
| 14 to 16 | Not used as relays. The expander pins of 13 to 16 are inputs: pump 1 running (opto input 1), the G2 fault and one more (Open, below); opto input 2 is spare | none | Expander inputs |
On every HiLetgo relay module the trigger jumper is set, then held with a dab of removable silicone, so vibration cannot walk it off (Electronics plan 4.1).
The lights (Mike, 2026-10-31). Channel 3’s normally closed contact feeds two fuses right after it, F2 (the stern light) and F4 (the bow lantern), 1 A slow-blow each, so nothing leaves this box on channel 3 unfused. F4 feeds the bow lantern’s YRDZXG 24 to 12 V converter, and the bow lantern’s cable runs from it straight forward out of entry 7: a 12/2 offcut (a bigger wire is always allowed), flat duplex, so its gland is sealant-filled; measure the jacket, then size the gland, PG11 or PG13.5, as at entry 10. Channel 7’s normally open contact, after its 0.5 A slow-blow fuse, feeds the whites’ YRDZXG 24 to 12 V converter directly, with no light relay; raise that fuse to 1 A only if the converter’s switch-on trips 0.5 A. The whites are on only when it is dark and the motor runs (in fog mode, whenever the motor runs); a dead node leaves them off. Both converters sit in this box. Open: whether the two light converters fit inside the node box; laying out the node settles it. If not, the two sealed converters (wire leads) sit on the hull right beside the node.
The post cables, entry 17 (Mike, 2026-10-31). Boat 1 has no aft junction box (Sheet A6): the post lights cable, the post wind meter cable and rudder encoder A’s lead each run in one piece straight to this box, the way the horn pair runs. Entry 17 (right wall, top) is one Altelix PG25 4-port split gland (1-3/16 in hole; each port seals on one round cable 0.15 to 0.30 in across): port a the post lights cable, b the wind meter cable, c encoder A’s lead (Belden 6504FE, 0.175 in), d plugged with the gland’s own plug. Post lights: a 22/12 shielded offcut (0.24 in), in one piece up the post: three cores the stern light + (24 V, after F2), three cores white 1 +, three cores white 2 +, three cores 0 V. The two whites join in parallel on this box’s terminals, after the whites’ converter, not inside the post; the drain goes to 0 V here only. Wind meter: its own Pololu D36V6F5 (5 V out; terminal block put on at a workbench, then potted) and its 1 A fuse F1 sit in this box, on the node’s 24 V; never 24 V into the meter. Its cable, a 22/12 offcut, runs straight from the meter on the post; data on D0 only: the meter is only listened to, and sends on its own at the data rate set once with Calypso’s PC app, so D1 is free for release gate 6. The meter is on only while the node’s feed is on. Encoder A: pulse to D6, 3.3 V from the node. Wind data and light power stay in separate cables; the horn keeps its own 16 AWG pair (entry 18). The post wind meter cable, the post lights cable and the bow lantern cable each get their mix 31 ferrite just below their gland (entries 17 and 7).
The bilge cable, entry 9 (Mike, 2026-10-31; pump 2 on the backup battery, 2026-11-01). One C4 18/4 shielded tinned cable (0.25 in) in a PG7, straight from this box to the pumps, which sit on the glass panel aft of the settee: red pump 1 on, landed after channel 6’s 5 A fuse; black pump 1 running, to opto input 1. The white and fourth cores are unused here, trimmed and sleeved (channel 12 and opto input 2 spare): pump 2’s manual-on and running line go to Pi B’s side, where WD-B watches it (Sheet A2). The running core carries 24 V while pump 1 runs: colored heat shrink and the label P1 RUN at both ends, and never on a 0 V terminal. The shield is trimmed and sleeved at both ends. At pump 1 the manual-on joins its + terminal after its Water Witch 230-24, with no diode, and the running core joins the Water Witch’s pump output (24 V there means the pump is running). Pump 1 has its own power line (line 11, 5 A breaker) through its Water Witch, so it runs with this box dead; pump 2 runs from its 5 A breaker on the backup battery board straight to its Ultima switch, with no cutoff (Sheet A10). Drawing: Bilge Pump Wiring v10.5.
Steering and sensors. The Ewellix CAHB-22 runs from a Pololu G2 24v13 motor driver (on hand since 2026-09-28), behind a 30 A power-cut relay that is closed when unpowered. Feed in by entry 3, 14/2 on its own 20 A breaker on the backup-fed bar (Electronics plan 7.6); motor and feedback out by 4. Encoder A and the post wind meter come in by entry 17, pump 1’s running state on the bilge cable (entry 9). Chain 1 carries the battery trip. The opto board reads only pump 1’s running state (24 V present = pump running), with no release bus readback, and hands them to expander inputs; the G2 fault line goes to an expander input too. Open: what the fourth expander input reads: the Compute Bay Plan gives it to a release bus readback, which no board in this box carries; settling the release bus readback settles it. Not fitted: short relays, branch current meters, a VE.Direct reader, gas sensors.
| Nucleo pin | Job | Nucleo pin | Job |
|---|---|---|---|
| D0, D1 | Wind meter in (listen only); release gate ch 6 | D3 | Release enable relay coil (its own 30 A module) |
| D2, D10 | CAN board TX, RX | D7, D8 | Release gates ch 1, 2 |
| D4, D5 | I2C data, clock (expander, BME280, humidity) | A3, A6 | Release gates ch 3, 4 |
| D6 | Encoder A | A7 | Release gate ch 5 |
| D9, D13 | Steering PWM, DIR to the G2 | D11, D12 | 1-wire chain 1 (battery trip), chain 2 (air) |
| A0, A1 | G2 current sense, Ewellix wiper | A2, A4, A5 | Never used |
Every Nucleo solder link stays as shipped: A2 reaches no chip pin, and A4 and A5 are joined to the I2C pair, so those three are never used. The G2 needs its terminal blocks soldered on at the bench.
No charge stop (deleted 2026-11-01, do not re-propose). Channel 8 is spare and entry 14 is not drilled; nothing runs from the main bus board to this box for charging, and the five VE.Direct remote on/off cables are not fitted. The chargers always charge: their lithium profiles are the only charge ceiling.
Fuses (Mike, 2026-10-30 and 2026-10-31). Twelve slow-blow 5 x 20 mm fuses in DIN holders on the rail: the four puller fuses (below); five on the switched outputs, each right after its relay contact: ch 1 Starlink power 5 A, ch 4 the em-trak 2 A, ch 6 bilge pump 1’s manual-on 5 A, ch 7 the whites’ converter 0.5 A, ch 9 the camera port UV-C 0.5 A; F2 the stern light and F4 the bow lantern, 1 A each, right after ch 3’s contact; and F1 the wind meter, 1 A. None on ch 2 (the wet lab line has its own 15 A breaker upstream) or ch 10 and 11 (inside the cabin, a few milliamps). A short on an unfused output would trip this box’s own 15 A breaker, and ch 3, ch 4 and ch 9 fail ON, so the short would come back at every reset. Fuses from the QBGTFAK kit, holders from the MECCANIXITY pack: twelve holders in this box, five in the wet lab box, seventeen boat wide.
Channels 9 and 10. Channel 9 (camera port UV-C) leaves by entry 15 to the LM317 regulator and the UV-C lights at the camera port: small 275 nm LED boards above and below the lens, starting at 20 mA with a 62 ohm set resistor (the build: Underwater Camera Port Guide). Channel 10 leaves by entry 16 to the Orion-Tr’s remote on/off.
Release. Channels (Electronics sec 4.3): 1 and 2 the drogue lids (horn A here, horn B on Release Node B; with the main side dead, either computer triggers them from the backup converter one horn at a time, steering paused for the burn); 3 to 6 the four cord pullers; 7 to 9 Boat 2; 10 to 15 retired on Boat 1 (Boat 2 keeps one pull-pin); 16 retired. The enable relay and the channel’s MOSFET must both be on, both from native Nucleo pins. The release bus has its own 12/2 feeder (on hand) on a 30 A breaker (line 4) on the backup-fed bar, not the node’s 15 A feed, entering by its own entry, 10 in Appendix A3. Open: measure the 12/2 jacket, then size this gland and Release Node B’s (PG11 or PG13.5).
Each puller runs through its own DPDT reversing relay (it swaps the motor’s two wires): 24 V coil, 10 A, each in its own DIN socket with screw terminals, coils on channel 11, no coil diodes needed. The 1N5408 sits on the relay input side (MOSFET drain to the relay’s + input, on the relay side of its fuse, inferred), so it works both ways; the horns need none. On each puller’s plus side, between the release bus and its relay’s input, one slow-blow 5 x 20 mm fuse in a DIN fuse holder, sized at the bench test (Mike, 2026-10-30: there it also blows if a chafed + core touches its cable’s shield, whose drain is at 0 V); each puller runs 64 s and stops. Release is forward only; reverse needs a shore test command, with the enable relay and the puller’s channel still on. Three cables go straight to the stern, one gland each, with no terminal box (Mike, 2026-10-27): entry 11 the 14/4 release cable (PG11), both drogue release pairs, its jacket opened near the transom so each pair runs on to its own potted gland; entries 12 and 13 the two 18/4 cord puller cables (PG7 each), paired by corner, each opened at its quarter to that quarter’s two pullers. Each release pair’s + is the release bus and its − its MOSFET module; each puller pair leaves its reversing relay. The 18/4 shield drains go to the 24 V negative here only. Colors: Electronics plan A3; drawing Stern Release Wiring v10.5.
What it is. The battery watchman, bolted to the outside of a long side wall of the battery box and never inside it. It watches and controls nothing: no wire to the chargers, no relay, no load. The SBMS0 reads all eight group voltages through its own nine tap wires, pack current through the 300 A shunt, solar current through the 100 A shunt, and pack temperature (its XT1 thermistor on pins 15 and 16 of its green plug). It streams them to Pi A through the Electrodacus WiFi/USB add-on board (a micro USB socket, its lead tied down right outside the plug) and the USB hub beside Pi A. That stream is required: the battery percentage comes from it, because the SBMS0’s pack shunt is the only battery current sensor aboard. The JK balancer evens out the eight groups through its own nine tap wires; it talks to nothing and controls nothing. No CAN, no RS-485.
Where. As built, bolted to a long side wall of the battery box (Mike, 2026-11-02: “it is mounted on batt box side”). Open: which side and how high; Mike’s word or a photo settles it. Four 1/4 in stainless bolts through the wall, each hole bored oversize, filled with thickened epoxy and redrilled, each bolt bedded in sealant, fender washers inside, nylon lock nuts or blue Loctite; drill before the pack goes in (Battery Box Building Guide Parts 4 and 8). Four glands and no vent, all facing down, each cable with its own drip loop. It is IP65: spray, not standing water; a drowned BMS box only loses readings.
The SBMS0 side. Its tap wires land on a Winford BRK2X6-L-DIN ribbon breakout board on the DIN rail, fed from the SBMS0’s cell socket by a new 12-pin ribbon about 8 in long; the SBMS0’s own ribbon is not cut. The short ribbon runs pin 1 to pin 1, its stripe on terminal 1 of the Winford board; with both plugs keyed the same way, its stripe sits on the opposite edge from the factory ribbon’s red wire (Electrodacus’s ribbon marks pin 12 in red, Reference/SBMS0 v03d Manual.pdf page 5). A ribbon fits one way at each end and can still be crossed inside. Before plugging in, meter pin 1 to pin 12 at the SBMS0 end of the short ribbon, black lead on pin 1: plus about 26 V, never a minus sign. Terminal number = ribbon wire number: W0 on 1 with a jumper 1 to 2 and the 12-core’s shield drain on 2 (the shield grounded at this end only), W1 to W7 on 3 to 9, W8 on 10 with jumpers 10 to 11 and 11 to 12; never more than two wires under one screw. The green plug takes the shunt sense wires (solar shunt on pins 1 and 2, battery shunt on 3 and 4) and XT1 on 15 and 16, both by way of a six-block DIN strip (below). Serial speed: Device Settings, UART on, 115,200 (Mike, 2026-11-08).
The JK side. Its 11-pin plug carries B0 to B8 and its own power pair, V- and V+ (10 to 40 V). Each harness wire joins a core of its 18 AWG 10-core cable with an adhesive heat-shrink crimp butt splice: at W0 the B0 and V- wires share one end of the splice, at W8 the B8 and V+ wires. Splices staggered and tied to the plate; the board still unplugs at its own plug. Set it up by phone over Bluetooth: LiFePO4, 8 cells.
Entries: one gland per cable (Mike, 2026-10-13: two cables of different size do not seal in one gland, sleeved or not). Entry 1, PG13.5 (13/16 in hole): the JK’s nine taps on its ENERJOUR 18 AWG 10-core (0.39 in across), from battery box entry 3. Entry 1a, PG9 (5/8 in hole): the SBMS0’s nine taps and the XT1 pair on 11 cores of the 22 AWG 12-core shielded cable (0.24 in across), from battery box entry 3a. Dielectric grease on each gland insert. The DS18B20 probe chain runs straight from the battery box to central node entry 21 and never enters this box: entry 6 is deleted and not drilled. Both shunts sit on the positive side of the main bus board, and only their sense wires come in, by entry 3 (PG9): one 4-core 20 AWG cable (black, red, yellow, white) for both shunts, with no fuse of any kind (Mike, 2026-11-08: “yes no fuses on shunt wires”). At the shunts the four wires sit only beside each other and the + leads, all within millivolts, so a rub there shorts nothing; the cable stays clear of the bus board’s minus bars and is tied away from the SBMS0’s USB plug in this box (the USB shell is Pi A’s unfused minus). It lands on the top of terminals 1 to 4 of the six-block DIN strip, and Cat6 cores run from the bottom screws to the green plug, so terminals 1 to 4 are SBMS0 pins 1 to 4; terminals 5 and 6 carry the XT1 thermistor, the 12-core’s white and tan, to green (pin 15) and blue (pin 16), either way. Colors and the shunt screws: Battery Box Building Guide Part 8 and Box Plans v10.5/SBMS0 Setup and Shunt Wires v10.5.pdf. Entry 4: the SBMS0’s USB lead, plug on, through an Altelix PG25 4-port split gland, three ports plugged (Mike, 2026-10-14). Powered from the pack per the SBMS0 manual. No humidity breakout (no reader in this box).
Monitoring only. No EXTIO4 wiring, no charge bypass, and no VE.Direct remote cables (no charge stop: they are not fitted), so entries 2 and 5 are not drilled. The charge limits live in the five MPPTs’ own lithium profiles (27.6 V absorb, 27.0 V float, temperature compensation off), the only charge ceiling. Below 33 F on any pack probe the computer in command alerts shore and runs the motor at about the solar output, so the battery’s net current stays near zero (not while the drogue is out or in STORM).
FSESC box: deleted, neither boat. Number kept so later numbers stay put.
No aft junction box on Boat 1 (Mike, 2026-10-31). Each cable that would land at the stern runs in one piece straight to the central node (Sheet A3), the way the horn pair runs. The number is kept so later numbers stay put; the network switch box keeps its own sheet, A6a.
| Job | Where it lives |
|---|---|
| Post lights cable: the stern light and the two motoring whites | A 22/12 offcut in one piece from central node entry 17, port a, up the post; the two whites join in parallel on the node’s terminals |
| Stern light fuse F2 and bow lantern fuse F4, 1 A each | At the central node, right after channel 3’s normally closed contact |
| The two YRDZXG 24 to 12 V light converters | At the central node: the whites’ fed straight from channel 7 and its 0.5 A fuse, with no light relay; the bow lantern’s after F4. If the node box has no room, they sit on the hull right beside it (Sheet A3) |
| Bow lantern cable | A 12/2 offcut straight forward from central node entry 7 |
| Wind meter’s 5 V board (Pololu D36V6F5) and its 1 A fuse F1 | At the central node, on the node’s 24 V; the meter’s 22/12 cable straight in at entry 17, port b |
| Rudder encoder A | Its Belden 6504FE lead straight to central node entry 17, port c |
| Bilge pumps: both manual-ons and both running states | One 18/4 straight from central node entry 9 to both pumps |
| Mix 31 ferrites on the post lights, wind meter and bow lantern cables | Just below their glands at the central node (entries 17 and 7) |
| Horn | Its own 16 AWG pair from central node entry 18 |
| Line 6, its 20 A breaker labelled Switch | Feeds only the network switch box (Sheet A6a) |
Not fitted on Boat 1: the box itself, its glands, terminal blocks and surge diode, F3, the 30 A light relay, a 24 V jumper from the network switch box, channel 3 and channel 6 16/2 runs, and a 12-core trunk. The TICONN box (about 12 x 8 x 5 in) is free for another job, and its two Altelix 4-port split glands go back on the shelf.
What it is. The network switch box is a CXCESNS aluminum box, the same as the two compute boxes, at the stern. Every network cable ends here: nine bulkhead jacks (RJ45 couplers; a tenth only if SFP 10 is used) and the 24 V feed in, ten entries in all. It holds only the TSW202 switch, its Mean Well supply and the SFP module: nothing lightning-related. Keep the box well above bilge water.
Mounting inside. The switch and its supply clip to a DIN rail on a long side wall, not glued to the floor: the TSW202 is 4.8 in (122 mm) deep and the box only 3.9 in. On the side wall the switch reaches about 4.8 in across the 8.3 in floor, plus about 1.2 in of plug, which leaves about 2.3 in to turn the patch cords. Heat goes from the rail to the box wall, the glued face and the hull: about 5 to 15 W in all. Right-angle patch cords at the switch ports (a short right-angle adapter at a port is fine where a straight plug cannot turn), each cord tied down within about 2 in of its plug. Open: which way the right-angle plugs must point; reading it off the switch, with the distance from the rail to the port face, settles it before the cords are ordered.
Wall jacks. Every network cable crossing a box wall comes in on a bulkhead jack, one per cable: the Alrhso panel couplers, zinc and plastic (fine on Pi B’s UTP run: its metal touches no wire or shield). The outside face sits in the hull’s salt air, and the jack’s cap seals only an empty jack. On each outside face: a thin smear of dielectric grease on the plug, plug in, then self-fusing silicone tape stretched to about twice its length, half-overlapped, from the jack’s threads over the plug and 1 to 2 in down the cable, with no gaps, and a drip loop below. Jacks go on side or bottom walls, facing sideways or down, never on the top (the drawing puts them on top only for clarity). Inside faces, within sealed boxes, need no tape. The same goes for the one jack on each of Pi A, Pi B and the light driver’s dry box: 12 in all. The Starlink Mini has no jack: its plug goes in the Mini’s own latching port, greased and taped the same way (Sheet A13).
The switch. The five camera runs, the PoE light driver, Pi A, Pi B and Starlink all meet the Teltonika TSW202 (8 PoE ports plus 2 SFP slots; PoE is power sent down the network cable). Port map: on the drawing. The switch is always on from line 6, its own 20 A breaker on the branch bar (labelled Switch), never on a relay: shedding it would blind Starlink and cut the Ethernet between the Pis. Cameras and lights save power by per-port PoE control through the switch’s Web API, read back over SNMP, firmware pinned. PoE budget on the 112 W Mean Well supply: cameras about 60 W set aside, plus the driver at 25 W (802.3at) or 12 W (802.3af); both fit, no supply upgrade.
Surge protectors: on their own board near the deck, in neither box. The five deck and near-deck cables (two post cameras, foredeck fisheye, interior camera, Starlink) each pass a Ubiquiti ETH-SP-G2 (outdoor-rated) on a small board on a bulkhead where they first come inside. Their grounds go to one small tinned bar; one 6 AWG lead runs short and straight from it to the lightning copper, a foot or two at most (Lightning Guide 6.2, 7.4). Open: where the copper runs near that bulkhead, and so which bulkhead takes the board; check at the boat. Short premade Cat6 runs go down to this box’s wall jacks, low in the hull; keep cables before and after the protectors apart.
Network cables are premade, none crimped aboard. Extra coiled near the surge board (small tight strapped coils about 8 in across, the camera side and the switch side apart); none in this box: 6 in to 1 ft patch cords, jack to port. No sharp bends at plugs; check each plug passes its holes and glands, or use a split gland (a gland that opens to close around a cable that already has its plug).
The 24 V feed (Mike, 2026-10-16 and 2026-10-31): line 6, 16/2 from its own 20 A breaker on the main bus board’s branch bar, feeds only this box. It comes in by entry 10 (PG9, 5/8 in hole, sealant-filled: the 16/2 is oval) onto one DIN terminal block from the kits on hand, and the switch’s 54 V supply takes off from it.
Cooling. This box is glued by its back face straight to the hull in the heat-carrying epoxy of Compute Bay 2.3, like the Pi A box; entries go on the other faces, with drip loops. It is wired to nothing and stays off the lightning copper list (Lightning Guide 6.2).
What it is. Main propulsion drive for the ME1616 motor: the Flipsky 75200 Pro V2.0, aluminum PCB, power-button variant, bought 2026-10-03 on Amazon (order 114-2434294-4539414), $160.99, here 2026-10-07; the 2026-09-05 PayPal order shows no payment, and if it turns up too, one goes back. A crimped shorted plug replaces its on/off button, so the board runs whenever battery is present. No precharge (Mike, 2026-09-29): the battery switch makes the first connection. Boat 1 sails with this one VESC; VESC B (Sheet A8) is Boat 2 only. Plan with every wire, the part positions and the build steps: Box Plans v10.5/VESC A Box v10.5.pdf; full-size drilling template for Boat 2: Old/Flipsky Hole Pattern 2026-10-26.pdf.
The box (Mike, 2026-10-24 and 2026-10-26). A CXCESNS cast aluminum box, 11.8 × 8.3 × 3.9 in, the same as the compute boxes and the switch box. Its floor is the cooling plate: it glues straight to the hull in the heat-carrying epoxy, the way the switch box does; no separate plate, no hole in the floor. Roughly 60 W of heat at 2 kW (a guess), a few watts at the usual 150 to 250 W, through about 98 sq in of floor. The Flipsky (5-1/8 × 2-11/16 in, 130 × 68 mm, Flipsky’s spec) sits on the Thermal Grizzly Minus Pad 8 gap pad, held by four 316 flat-head screws from outside, up through the floor into its own four blind threaded holes (40 × 120 mm, 1-9/16 × 4-23/32 in, inferred from Flipsky’s photo), countersunk flush and set before the box is glued down; it then stays in for good. As built (Mike’s photo, 2026-11-06; Box Plans v10.5/VESC A Box v10.5.pdf page 2): the two posts are screwed down from inside, the screw tips flush under the floor. The + and − PG16s and all three PG7s are on one long side; their spots, read off the photo from the battery end corner: − 3-3/4 in, + 5 in, C 6-3/4 in, S 8-1/4 in, U 9-3/4 in (which big gland is + is Claude’s pick). The three motor glands, PG21, are on the motor end. A desiccant pack goes in. All glands 1 in below the rim. Open: the Flipsky’s hole thread (M3 or M4, a guess); read it off the part.
Plugs (Flipsky’s 75100 Pro V2 manual, Reference/Flipsky and ME1616 Research 2026-09-24.md). COMM: JST-PH 2 mm 8-pin, pairs on hand. CAN: JST-GH 1.25 mm 5-pin leads, on hand (Kidisoii pre-crimped kit); CANH, CANL, GND only, PWR.ON open. Motor sensor (hall) plug: JST-PH 2 mm 6-pin. Servo plug: JST-PH 2 mm 3-pin; the switch plug the same (inferred from Mike’s photos). Flipsky publishes no lead wire size: about 26 AWG on the PH leads and 28 AWG on the GH lead (inferred). Largest the pins take: PH 24 AWG, GH 26 AWG. BOAT 2 ONLY (Mike: “Yes”): every signal joint on one 35 mm DIN rail about 5 in long along the gland side, 16 screw blocks in three groups under their glands, ready-made 24 AWG PH leads, nothing bought; Electronics plan A7 and pages 5 and 6 of the VESC A Box plan. On the control CAN drop the red core is cut back and taped at both ends and the black core lands on CAN GND as the ground reference: the control bus carries no power. Kill line (Mike, 2026-10-14): on the servo plug’s PPM pin, with the VESC Tool kill switch set to that pin, active low (System Settings Sheet sec 2); low stops the motor whatever CAN or UART are doing. ADC1 and ADC2 carry the motor’s sin and cos, so they are not free for it. The kill line comes from WD-A’s PC817 board (and later Pi A’s kill pin) and shares the UART ground core in the Micro-C run from Pi A (Mike, 2026-10-24): the kill core lands on PPM and the ground core on the servo plug’s GND beside it. A 10k resistor from COMM 3.3V to PPM, in the harness (resistor kit on hand), holds the line high, motor allowed, whenever the PC817 is off, so a loose kill wire cannot stop the motor. COMM carries TX and RX and the motor sensor; its one GND serves the sensor alone, so no thin JST-PH wires are spliced. Pin 1 found by meter at the bench check.
Eight entries. CAN (PG7); UART + kill (PG7); battery + and − (PG16 each, onto the posts); the motor’s three phase leads, each in its own PG21 gland (1-1/8 in hole, sealing 0.51 to 0.71 in) on the motor end, drawn as one run: each lead comes in with its own lug uncut and bolts to the Flipsky’s U, V or W inside the box (Mike, 2026-11-06: “power take out and short plug, joints inside box”), so no motor lead lugs and no 3/8-16 x 1 in bolts for re-lugging are needed; no ferrite: the phase leads are too short for the 1.0 in clamp (Mike, 2026-10-15); sensor lead (PG7). No surge diode on the feed (Mike, 2026-10-24): the battery and the four capacitors hold the feed far below a 1.5KE33CA’s turn-on, and a failed one fails shorted, blowing the 250 A motor fuse. Not fitted, do not re-propose: a diode on the VESC feed, plain or fused. Pi A holds a direct UART line with a hardware kill beside the CAN drop; the kill line is the hardware backstop under the jam logic in the Pi.
Motor sensor. The ME1616 sensor harness is built to the Sep 2 spec (crimp, no solder; SinCos encoder input). The sensor is an RLS RMB29 (analogue sin/cos, RMB29AC; Reference/RLS RMB29 Datasheet RMB29D01 07.pdf page 4): 5 V supply, each signal centered at 3.0 V and running about 1.9 to 4.1 V, worst case about 4.45 V, against the Flipsky’s 3.3 V ADC1 and ADC2. A 10k and 20k divider is always fitted on sin and on cos (Mike, 2026-11-06): after it each signal runs about 1.3 to 2.7 V, worst case top about 3.0 V. No filter capacitors (Mike, 2026-11-06): the sensor wires kept apart from the motor leads and the firmware’s own sensorless fallback cover that. The motor’s sensor plug is an Aptiv Metri-Pack 150, 8-way, sealed; its mating plug (an ELITE.CITI pair with terminals and seals for 20 to 22 AWG, $14.81) is ordered. Motor temperature sensor: KTY84/130; check the board has the 10k resistor the firmware assumes.
Capacitors (Mike, 2026-10-14). Four Nichicon 1,000 uF 63 V (on hand) lie in a row on the box floor, stripes all one way. Each leg, left full length, gets a heat-shrink butt splice (22 to 18 AWG, crimped on the bare leg, then shrunk) and an 18 AWG tail, 3 to 4 in, all eight the same length: red on the plus legs, black on the minus (striped) legs. The plus WAGO 221-415 takes the four red tails and a 12 AWG red lead; the minus WAGO the four black tails and a 12 AWG lead (as built, red marked with black shrink). As built, the capacitors and WAGOs sit along the long side away from the glands, by the − post, so the + 12 AWG lead is about 5-1/4 in and the − one short. A WAGO joins everything in it, so plus and minus never share one. Both WAGOs lie flat, levers up; capacitors and WAGOs glued to the box floor with neutral-cure silicone. Each lead, under 6 in with a crimped 3/8 in ring lug, goes to its post. The posts: two insulated MGI SpeedWare 3/8 in posts; each holds three lugs, bottom up: the 2 AWG feed, the controller’s own 8 AWG lead (cut under 6 in), the 12 AWG capacitor lead. Nothing bare but the post lugs; no solder anywhere. Check each capacitor’s stripe faces the minus post before first power-up. Not fitted, do not re-propose: copper strips or any bare bus copper at the capacitors, a G10 capacitor board, a bought RC capacitor pack, stacked WAGOs. Plan: Box Plans v10.5/VESC A Box v10.5.pdf.
Cooling. The box floor is the plate, glued to the hull in the heat-carrying epoxy. The box is wired to nothing (Lightning Guide 6.2): the Flipsky’s metal base touches only its gap pad and its four screws, and an aluminum-board base is insulated from its copper (inferred).
Boat 2 only, not fitted on Boat 1. Boat 1 sails with one VESC: losing propulsion costs time, not the trip, because the wing sails the boat. The backup VESC, the phase-transfer contactor, its set and reset coils and position sense are Boat 2 parts; no holes are drilled for this box on Boat 1. On Boat 1 there is one throttle path and the “propulsion_backup” software state is unreachable.
On Boat 2. The backup throttle: a 40 A class VESC on the house bus, feeding the same motor through the phase-transfer contactor, which picks whose phases reach the ME1616. The contactor coil is fed from the main bank (island rule); the set, reset and sense lines pass through this box’s terminals. House bus by design: with VESC A and the Electrak on control and VESC B on house, no single bus failure strands both throttle paths.
Holes. Seven, Boat 2 only.
What it is. Dumb by design: cells and sensors only. Every board that thinks lives next door in the BMS box. No CAN drop, no stop-wire relay, no data isolator at the box. Seven holes (the two mains, three signal glands, the vent and the relief stub), plus the main fuse’s bolts and the BMS box’s four bolts (M). Dashed circles on the drawing are holes that are not drilled.
Aft wall, high. Two PG16 (7/8 in) for the 2 AWG mains, in line with the terminal posts at measured post height so the cables run straight over the aft end plate. Three signal glands, one cable each (Mike, 2026-10-13: two cables of different size do not seal in one gland, sleeved or not): entry 3, PG13.5 (13/16 in hole), the JK’s ENERJOUR 18 AWG 10-core, to BMS box entry 1; entry 3a, PG9 (5/8 in hole), the SBMS0’s 22 AWG 12-core shielded with the XT1 pair, to BMS box entry 1a; entry 3b, PG9 (5/8 in hole), the DS18B20 probe trunk, straight to central node entry 21, never through the BMS box. Each cable with its own drip loop; dielectric grease on each insert. The 12-core’s shield is grounded at the BMS box end only. The Gore vent M12 (1/2 in) as the breathing inlet. Aft wall, outside, mid-height on the + side: the 300 A main fuse (F); bed any bolt through the wall in sealant. The BMS box (M) is bolted to a long side wall, as built (Mike, 2026-11-02; Sheet A4; drawn here on the end wall only to show it): four 1/4 in stainless bolts, each hole bored oversize, filled with thickened epoxy and redrilled, each bolt bedded in sealant. Open: which side and how high; Mike’s word or a photo settles it.
Forward wall, high: the relief stub. A 2 in hole-saw opening with a 1-1/2 in Sch 40 PVC stub glassed through, pointing up at 45 degrees into open cabin space. Inside it, a Dometic/Sealand 1-1/2 in toilet duckbill (OEM 385310076), lips out, flange clamped by a PVC coupling, discharge aimed forward away from the electronics. No screen on the stub: the duckbill is shut except when the box vents, and the cell-temperature trip is the protection. Not fitted: a bug cap or a fine flame mesh. None of these either: burst membrane, overboard duct, transom hole, flame screen.
No heaters. No pads, thermostats, thermal fuses or their wiring. Nothing stops charging in the cold automatically: no stretch of the route has a monthly-mean sea temperature below 35 F, the pack follows cabin air on its 2 in foam, and below 33 F on any pack probe the computer in command alerts shore and runs the motor at about the solar output, so the battery’s net current stays near zero (not while the drogue is out or in STORM).
Heat trip; no gas sensor (do not re-propose). The six DS18B20 pack probes carry the trip: 150 F on any probe, or a 10 F rise in five minutes: HIBERNATE loads, alert, and the computer in command runs the motor at about the solar output so the battery's net current stays near zero (not while the drogue is out or in STORM, when the motor is off). Release after one hour with every probe below 120 F. Open: nothing cuts the bank off on the trip; settled in the single-point review. Warning-only alert at 131 F.
The probes and their trunk (Mike, 2026-10-13 and 10-15). Three probes per 16-cell stack: one on each of the stack’s two middle groups and one on an end group, each held against its cell face the way the XT1 thermistor is held, reading the metal, not the air. Each is named by its factory serial number, so its place on the chain does not matter. The trunk is Mike’s 3-conductor 20 AWG cable on hand, all three wires used: red power, black ground, the third data. It runs along the stacks past each probe, the probes about 2 ft apart: at each one its three wires are cut and each joined with one red heat-shrink butt splice (22 to 18 AWG), the trunk wire coming in on one end, the trunk wire going on plus the probe’s wire (folded double) on the other, the three staggered about 1 in and covered by a glue-lined sleeve; at the last probe the trunk ends. No solder and no WAGO. The probes’ own 3 ft leads stay full length, coiled and tied; trunk and joints tied down clear of the terminal rows and the series links.
Taps. Each board has its own nine tap wires, each straight to its own insulated ring on its bus bar nut, with no fuse of any kind (Mike, 2026-11-08: “I think adding 18 fuses and connections on top of the batteries increases risk”): 18 rings, the two wires of each joint on two different posts of it. Split loom on any tap wire where it crosses a bus bar or stud of another voltage, and every wire tied so it cannot rub; as built (Mike’s photos, 2026-11-08) the wires run tied to the blue PEX rod sleeves. Open: the XT1 probe end was found lying loose on a cell top; it is trapped against a cell face as Part 8 says. Just inside its gland each tap cable splits into one branch per stack, and each branch is held by nylon cable clamps on short wood screws into the long wall, never tied to the cells. Build details: Battery Box Building Guide Part 8.
What it is. The island’s own 24 V: a bought Dyness 24V 100Ah LiFePO4 (25.6 V, 2,560 Wh) in its own plastic case, with a built-in 100 A BMS, bought instead of a team-built 8 × EVE LF50 bank. No box is built and no gland is drilled: the compartment is the enclosure, and every circuit lands on the backup battery board beside it (Mike, 2026-10-15). No hole schedule and no gland list (Electronics and Wiring Plan A10). The board is built and mounted in the boat (Mike, 2026-11-03), so every change is made in place. Drawing: Box Plans v10.5/Backup Battery Board Changes v10.5.pdf, from the photo Reference/Backup Battery Board Photo 2026-11-03.jpg.
The board. 16 x 12 in, 1/2 in marine plywood or 1/4 in G10, no bond wire, within a foot of the Dyness, standing up with the chargers’ fins running up and down, somewhere dry (the Orion-Tr is only splash rated); built and wired on the bench and fitted as one piece; bars and breakers under their covers, cables leaving the bottom edge with drip loops, except the Orion-Tr’s two main-battery pairs at the top edge. As built: the ANL at the top, the + bar under it, the two chargers down the right side, the − bar at the bottom. The Orion-Tr and the SmartSolar 75/10 side by side with 2 in of air round each. The 30 A ANL (Renogy, on hand) sits at the top; its 6 AWG from the post runs in split loom its whole length, as short as the board allows and 72 in at most (ABYC E-11 allows 72 in for a cable in a sheath, 7 in bare); the Dyness’s own BMS also cuts off a dead short. A red and black bus bar pair under covers. The backup minus floats: no bond wire on the board, the bars or any case.
Loads on breakers, chargers on fuses. Pi B and Iridium B each on a 5 A auto-reset stud breaker, as Iridium A is (Pi B worst case about 1.2 A, Iridium B about 0.7 A): a blown fuse would leave either dead for the whole trip. That breaker is Pi B’s only protection; there is no fuse in the Pi B box. The chargers keep fuses, as on the main board, in sealed inline blade holders: the Orion-Tr output 10 A, the 75/10 battery side 15 A (1-1/4 times its 10 A, next size up). The two 50 W panels come in through a sixth NanQue PV surge module (Mike, 2026-10-15; to buy), its ground screw to its own PV minus, never the lightning copper. Pump 2’s 5 A breaker (line 15) takes the spare spot and studs and feeds its 14/2 straight to the Johnson Ultima switch and the pump, with no cutoff (Mike, 2026-11-02: “I don’t think we ever want to kill a bilge pump”); the 1.5KE33CA stays across its pair at the board. Nothing from Pi B or shore stops pump 2. As built, two 5 A breakers are fitted, labelled Pi B (left) and Iridium B (right); bilge 2’s breaker sits below them, the converter’s breaker to their left. Open: whether Primelink unit B lands on this bank: Build Guide sec 8.3 puts it on the emergency bank, and the Electronics plan lists only Pi B and Iridium B; the spare spot now holds pump 2.
What this battery powers (2026-11-01). Always: Pi B, WD-B, GPS B, IMU B, Iridium B, the detector and pump 2. With the main side dead: the main bus board’s backup-fed bar (steering, wing box, central node, both release feeds) through the backup converter (Orion-Tr Smart 24/24-17 isolated), which Pi B turns on only then; its own low-voltage cutoff (about 30 percent left) stops it and its restart voltage starts it again. It mounts beside the backup battery (Mike: “yes”), its input run short, its 12/2 run of about 17 ft on its output side to the backup-fed bar; Victron asks about 7 AWG at 16 ft on the input, and the short input run is why it sits by the battery. Its input: a 20 A auto-reset stud breaker, a spare BFXM 20 A from the Sep 7 order (four bought, two used), on this board’s + bar, with a short 12 AWG pair to the converter. The converter draws about 15 A in at a rudder move and about 19 A at its full 17 A out from a Dyness near its 30 percent cutoff (computed, 88 percent efficiency); 20 A protects the 12 AWG. Open: its exact cutoff and restart voltages.
No on/off switch on the plus lead (Claude’s pick, standing unless Mike says otherwise; Mike asked 2026-10-24). The backup battery must never be off at sea, and a switch that can be left off will one day be off; it would also add two bolted joints in the one lead the backup island hangs on. To work on the board: undo one nut and lift one end of the 30 A ANL fuse (that kills the board’s + bar); cover the two 50 W panels (they feed the 75/10 in any daylight); pull the Orion-Tr’s green 2-pin remote plug (that turns it off). The breakers reset by themselves and have no off lever (Mike, 2026-10-24), so none cuts the Orion-Tr’s input: its input pair, tagged MAIN BATTERY at the board’s top edge, stays live from the main battery until the main battery switch (Blue Sea 6006) is off; turn that off only to touch those wires.
Two batteries, kept apart. Only the two isolated converters touch both: the Orion-Tr, and the backup converter beside the Dyness. The Orion-Tr’s two main-battery pairs, its input (from main board breaker 13) and its on/off pair (central node relay channel 10, out by central node entry 16), come in at the board’s top edge straight to the Orion-Tr’s terminals, not bundled with any backup wire, each tagged MAIN BATTERY (Mike, 2026-11-08); nothing else on the board touches the main battery. All wire 14/2 (Mike, 2026-10-15), except the two 6 AWG battery leads, the backup converter’s 12/2 and 12 AWG input pair, and the Orion-Tr’s remote pair: the Orion-Tr feed, the deck pair, the Pi B and Iridium B feeds and the board jumpers. 14/2 does not fit a PG7, so Pi B box entry 1 (Sheet A2) and the Iridium B box’s power entry (Sheet A11-B) are PG11 in a 3/4 in hole. The Orion-Tr’s remote pair carries only a few milliamps through the relay contact, so any jacketed tinned 2-wire works: 16/2 if the 16/2 roll has about 17 ft left after its branch lines, else 18/2, in a sealant-filled PG9 at central node entry 16 (Sheet A3). The Orion-Tr’s remote plug takes the smaller wire, a ferrule on each end.
Two recharge paths. The SmartSolar 75/10 charges the bank from its two 50 W panels, even with the main bus or the node dead. The Orion-Tr 24/24-5 isolated charger (output 27.0 V) runs from the main bus 90 minutes a day, after the monthly exercise and while pump 2 runs, switched through its remote on/off terminal by central node relay channel 10 on its normally open contact, so a dead node leaves it off. Its transformer keeps the two sides apart. Meter its case to each minus on the bench before it goes on the board. Restraint is the real work: 42.6 lb at 20.9 in long must hold in a knockdown and a full inversion; chocked shelf, two straps over the top, boots on both M8 (5/16 in) posts. Open with the maker: whether the built-in low-temperature cutoff blocks charging.
What it is. Voice number one. RockBLOCK 9603 on its carrier, fed always on from the main bank through an isolated 24 to 5 V converter (its 5 V side has no wire connection to its 24 V side) and a TVS. Isolated because the stub arrestor ties the coax shield to the lightning copper: the tie stops at the Iridium side, and the main negative is not tied to the copper a second time. The converter (Claude’s pick, 2026-10-09): a Mean Well DDR-15G-5 on a short DIN rail on the mounting plate, 9 to 36 V in, 5 V 3 A out against the RockBLOCK’s 0.5 A at most, 4,000 V between input and output; it stands about 2-1/2 in off the plate. Its idle draw is not published. The box: plastic, with a mounting plate, room on the plate for the converter, the RockBLOCK beside it and a TVS, and about 3 in inside from plate to lid. Open: which box (the TICONN 5.9 x 5.9 x 3.5 in box is not used); Mike’s pick settles it.
The link to Pi A: the RockBLOCK’s own cable (Mike, 2026-10-15). The cable SparkFun ships with the RockBLOCK is an FTDI USB to serial cable (TTL-232R-3V3 with the RockBLOCK’s 10-pin plug); its USB to serial chip is molded into the USB plug, so no other converter is needed. Cut it 8 in from the small plug, inside this box; keep both pieces. Strip each wire 1/2 in, twist it and fold it back on itself. Yellow (pin 1, data out of the modem) to yellow and orange (pin 6, data in) to orange, each in a 2-way lever connector; black (pin 10, ground) to black in a 3-way lever connector with a short black wire to the Mean Well’s −V; the small plug’s red (pin 8, 5 V in) to the Mean Well’s +V. The long piece’s red is cut short and taped, and any brown or green wire at the cut the same. Pin 7 (on/off) has no wire: a floating on/off pin is on. The long piece leaves by entry S; it enters the Pi A box plug on, by the split gland at entry 7 (Sheet A1), and its USB plug goes into the DSD TECH SH-G01A USB isolator (on hand) inside that box, which plugs into Pi A’s second USB port (Mike, 2026-10-20), so a hung hub cannot cut off the main satellite link. Too short? A USB extension goes between the isolator and Pi A, never between the cable and the isolator. Software: a USB serial port at 19,200 baud, flow control off.
Why this way. The modem’s ground is tied to the lightning copper through the antenna shield, so a plain USB link would tie Pi A to the copper; the isolator stops that path, and only data crosses it. Never plug the cable into Pi A without it. The modem never takes power over USB: the 9603 needs a supply of at least 500 mA, and the isolator gives 400 mA, so the Mean Well runs the modem and the isolator powers only the chip in the USB plug. The isolated Mean Well stays (Mike, 2026-10-16): the isolator breaks the path to the Pi, the Mean Well the path to the battery; a potted Klnuoxj joins its 5 V minus to its 24 V minus and would tie the main negative to the lightning copper through the antenna stub. Do not re-propose. Not fitted: an ADuM1201 isolator board or a 3.3 V regulator for this line, a Waveshare isolated USB to serial converter, the Ground Control tails cable.
Feed: a 5 A breaker on its own stud at the main bus bar, 16/2 (Mike, 2026-09-28: a breaker comes back after a passing fault; a fuse would leave the voice dead). Coax: the stub arrestor is the only protection (no safing relays; a stub cannot wear out). Its ground lead goes to the underside of the post’s copper deck terminal. Open: where the arrestor sits, at the deck stub or at the deck terminal with the coax run on under the deck; the two are about 2 ft or more apart (Instrument Post Guide 12.3), and the spot settles the ground lead’s length. The coax comes below through the post’s 1 in deck stub with the GPS and Starlink cables. Antenna: on the aft deck beside the post, under its own clear acrylic dome on a white base plate, rubber gasket, with a 5/64 in (2 mm) weep hole at the low point (Instrument Post Guide 11.1; Electronics 6.5). The dome goes where no solar panel shades it and where it shades no panel.
What it is. Voice number two, the same inside but living entirely on the island: emergency-bank power, its own USB cable to Pi B, its own stub and dome. Its isolated converter keeps the island’s floating negative off the lightning copper, which the stub arrestor ties to the coax shield. The converter, the box and the cut and rejoined cable are the same as Iridium A’s (Sheet A11-A); the same Open line on the box. Nothing is shared with Iridium A, on purpose: a fault that silences one voice cannot reach the other.
The link to Pi B. The cable’s long piece leaves by entry S and enters the Pi B box plug on, by its split gland at entry 7 (Sheet A2). Inside, its USB plug goes into a DSD TECH SH-G01A USB isolator (its status: Bill of Materials), which plugs into a USB port on Pi B; never the cable straight into Pi B. Too short? A USB extension goes between the isolator and Pi B, never between the cable and the isolator.
Feed: 14/2 from its own 5 A auto-reset breaker on the backup battery board (Sheet A10), in by a PG11 (3/4 in hole), sealant-filled. Antenna: forward on the foredeck under its own clear acrylic dome, built like Iridium A’s, with the same 5/64 in (2 mm) weep hole. Its coax comes below through its own small deck hole, so the two chains share no dome, deck hole, cable or fuse (Build Guide 8.3). The dome goes where no solar panel shades it and where it shades no panel. Arrestor lead: 6 AWG wire, about 6 to 7 ft aft to the lightning junction; measure where it lands before cutting the wire.
What it is. One board, one hole. The Playing With Fusion SEN-39003 AS3935 lightning board (Mike, 2026-10-14; bought 2026-10-06) hangs off WD-B in the Pi B box on one short lead that carries its power and its data. It runs at 5 V straight from WD-B’s own D36V6F5 rail, with no level shifter: its datasheet gives 2.4 to 5.5 V for power and signals. It comes tuned at the factory: this board’s value is 88 pF (bag label, register value 11; System Settings Sheet sec 10). I2C address 0x03. It logs strikes; WD-B never cuts Pi B’s power for lightning. The box touches no metal and is glued to a pad glued to the boat. The SparkFun board is not used, and no level shifter sits on this lead (the one level shifter board in use is on Pi B’s serial line to WD-B, Sheet A2). Plan with wire colors: Box Plans v10.5/Detector Mini Box v10.5.pdf.
At the board, on the bench. One of the bench solder jobs, all done off the boat (the others: the G2 drive’s terminal blocks, the Pololu terminal blocks and the UV-C board wires): an 8-way 0.1 in screw terminal block soldered onto the pin row (one of the Hxchen 20-pack on hand), and two short jumper wires soldered on the back between the pads, SI to VDD (picks I2C) and CS to GND, not under the screws. A small dab of West epoxy or high-temp hot glue over them is fine: flux cleaned off first, kept on the pin-row half of the board, off the antenna coil (MA5532) and the small parts beside it, so the factory tuning holds. Then the conformal coat every board gets. The lead’s wires go under the screws on ferrules, one per screw; check the screws tight once more a week or two after wiring. MISO and both Qwiic plugs stay empty (the Qwiic plugs carry no IRQ). Mounted on nylon 4-40 screws, no metal.
The lead. Belden 6504FE (Mike’s roll; 22 AWG, 6 cores, foil shield with a drain wire, about 0.175 in across), under 3 ft, PG7 at both ends. Red VDD to WD-B’s 5 V, black GND to the island’s floating negative, blue IRQ to D2 (Claude’s pick; no WD-B pin map exists yet), green SCL to A5, white SDA to A4. The brown core is cut back flush inside the jacket at both ends. The drain lands at the WD-B end only, on the island’s floating negative; here it is cut back and taped. Open: the 5 V surge diode on this lead, across red and black inside the Pi B box; picking a 5 V part settles it.
Open: bench the false-trigger rate with VESC A running before trusting it here. The fallback is a small forward node with an isolated transceiver.
The broadband dish is a Starlink Mini, bare on the aft deck with no enclosure: it is IP67 with its cables plugged in (Electronics plan A13). No entries, no glands, no coupler. Ethernet: a standard RJ45 plug in the Mini’s own latching port, greased and taped with self-fusing tape, on a long Cat6 run to the TSW202 in the network switch box (SFP port 9 through a copper SFP module); at the switch box its bulkhead jack’s outside face is greased and taped (Sheet A6a). Power rides relay channel 1 from the central node, on its own 16/2 from entry 5 straight to the Mini’s DC input (it takes 12 to 48 V on a DC5521 barrel plug), through a 5 A fuse at the node (Mike, 2026-10-31), so the Pi can shed it or power-cycle it. No heater of ours: the dish has its own snow-melt heater. Declared sacrificial: no arrestor; losing it costs bandwidth, not the boat. Open: how the power joint to its DC input is made, and what holds the Mini down.
Deck hole: the instrument post’s 1 in PVC deck stub. The post bundle and the Starlink, GPS and Iridium A cables come below through that one stub and its 1 in liquid-tight flex conduit; no separate standpipes. Only Iridium B keeps its own small deck hole, under its forward dome, so the two satellite chains share no hole. Pass the bundle through a sample stub on the bench before the real one is glassed in; make up the coax connectors after the cables are through.
What it is. Bought devices with their own sealed housings and connectors: no box of ours, no holes of ours. Each takes a tee on its backbone and a cut-cable drop into its own connector. The Ewellix CAHB-22 has no bus: its cable runs to the central node (Sheet A3, entries 3 and 4). The Electrak HD tee is Boat 2 only.
The wing (Wing Power System sec 1A; the wing box: Electronics plan A17). It reaches the hull through a sealed slip ring in the can (sliding contacts that pass wires across a turning joint), and its wires land in a new small wing box below the deck, where the wing's wires enter the hull. Eight ring wires: the Electrak MD’s 24 V and CAN pairs, the tip meter’s RS-485 pair and the wing compass’s RS-485 pair (on the ring’s two spare power rings). At the tip the 24 V pair feeds a branch on its own 1 A inline fuse: the compass runs on that 24 V (9 to 36 V), and a small converter makes 5 V from it for the tip meter alone (never 24 V on the meter). The compass (WitMotion HWT905, on the tip cap) gives the wing’s turn rate and, against the hull’s heading, its angle; there is no angle sensor in the can. The ring’s three fixed-side cables plug into three hull cables inside the can; these leave by three PG9 glands in the can wall (Wing Can Spec Sheet) and go down through their own deck gland straight into the wing box below the deck (Mike, 2026-10-02), where each ring wire gets a fuse or surge part (three Taidacent modules and the 24 V pair’s 5 A fuse and 1.5KE33CA), so a mast strike stops there. Nothing in the wing box thinks: one shielded 4-pair cable runs on to the USB hub box beside Pi A (Sheet A1a), carrying the actuator’s CAN pair, the tip meter’s and the compass’s RS-485 pairs, each after its surge module, and a ground pair tied to the wing’s 24 V negative in the wing box (the isolated readers’ signal side floats, so it must share a reference with the sensors). The cable is Mike’s shielded Cat6 on hand, about 5 ft, since both boxes sit in the middle of the boat (Mike, 2026-10-21; Wire and Cable Buy List C8), plugs cut off; it is 23 AWG, most likely solid, so it is strapped within a few inches of each box and its wires go into the terminals bare, no ferrule. At the hub box it comes in by a split gland (Sheet A1a). Colors: blue the CAN pair (CAN H solid blue, CAN L blue-white), orange the tip meter’s RS-485 (A solid, B white), green the compass’s RS-485 (A solid, B white), brown the ground, both wires together; same colors and labels at both ends. Its shield is grounded at the wing box end only (Mike’s OK, 2026-10-09 and 2026-10-21; never both ends, never the hub end only): the braid (or drain wire) twisted into a short pigtail, sleeved in heat shrink, on the box’s 24 V negative terminal, where the brown pair and the three Taidacent modules’ ground terminals also land (each module’s ground goes to that negative, as the battery bus surge modules’ do, so the boat keeps its one bond wire); any pair foils folded back and trimmed. At the hub box the shield is trimmed back flush and sleeved, touching nothing. The strike comes in at the wing box, so the shield drains there; grounded at the hub end it would carry the surge into the box beside Pi A, and grounded at both ends it would close a loop through the boat’s wiring. There the Waveshare 2-channel RS-485 reader takes the tip meter and the compass, and the DSD TECH SH-C30G isolated USB to CAN adapter, on a hub port, talks to the actuator. Pi B has its own: a second SH-C30G in the Pi B box joins the actuator’s CAN link as a third drop (Sheet A2 entry 4), used only when Pi B is in command; the two Pis never both command it. It joins at the wing box (Mike, 2026-11-04): its CAN pair lands with the Cat6’s blue pair under surge module M3’s OUT screws, in twin ferrules (two wires, one ferrule), its ground on a spare ground block (4 to 9), its gland a PG7; its adapter’s 120 ohm switch is off (its run is a branch). The wing box’s 24 V (line 14, 5 A) is on the main bus board’s backup-fed bar. RS-485 terminators off. The actuator’s four wires also get surge clamps at the actuator itself, in the wing (Wing Power System). The wing’s program runs on Pi A. The ring is the Rion HC2549, paid $495 (Mike, 2026-10-01).
The wing box’s wall: in, its 24 V feed (16/2 on its own 5 A breaker on the backup-fed bar, then the box’s own 5 A fuse); in, the three hull cables from the slip ring; out, the cable to the hub box; in, Pi B’s CAN drop. The box (Mike, 2026-10-12): a TICONN IP67 ABS box, 5.9 x 5.9 x 3.5 in, with its mounting plate (Amazon B0B87VR84G), to buy; the three Taidacent modules, the surge diode and the 5 A fuse on a short DIN rail on its plate. It fits (Claude, 2026-11-04, from the wing box plan’s layout): flat on the plate, the 4.8 in rail (end stop, terminals 1 to 9, the three surge modules, end stop) sits on a plate about 5.2 in square with about 0.4 in to spare, and the modules’ IN ends stand about 1 in above the bottom wall’s glands. Depth: one-module RS-485 surge protectors of other makers are about 2.2 in deep off the rail (EWIMAR 17.5 x 90 x 57 mm; Phoenix MT-RS485 54.9 mm deep); back wall, plate posts, plate and rail add about 0.7 in, so about 2.9 in of a box 3.5 in deep outside: it closes with about 1/4 in to spare (inferred). No vent. Six glands, all on the bottom wall (the wing box plan’s layout, Box Plans v10.5/Wing Box v10.5.pdf): four PG9 (1 the 24 V in; 2, 3 and 4 the three hull cables) and two PG7 (5 the Cat6 out to the hub box; 6 Pi B’s CAN drop, in the upper row above gland 5). Open: each hull cable, so its gland size; picking the hull cables settles it. Open: which stud feeds it, the end stud or stud 3; Mike’s call settles it.
What it is. The backup for the central node’s releases. Its own 30 A breaker, its own enable relay, its own MOSFET pairs and the same two-condition lock, commanded over the house bus, so no single bus or box failure silences every release. No shorting relays and no opto board: four entries (CAN, 24 V, drogue 1, drogue 2) and five Nucleo pins; entries 5 to 8 are not drilled. Every Nucleo solder link stays as shipped. Open: its three pins, to be picked clear of A2, A4, A5, A7, D5, D12 and D13; laying out its pin map settles it. The CAN board keeps its soldered 4-pin header and takes a ready-made 4-pin 0.1 in female plug with 24 AWG wire, zip-tied lengthwise over the plug and around the board, a dab of silicone, a paint dot at pin 1 on plug and board (Electronics plan sec 4). It releases the horn-B channel of each drogue box; either node alone cuts a drogue strap.
Same rules as the central node. Unpowered, it cannot release. Two separate conditions: the enable relay closed and the channel MOSFET on. No humidity breakout; no ferrites. No short relays, no opto board, no continuity or confirm readback. The monthly enable relay exercise covers this node.
What makes it independent. Five separate layers; a fault has to cross all five to take both paths to one device. Different bus: the central node is on the control backbone, this node on the house backbone, each with its own tees and terminators; the house bus carries 12 V on its pair from its own 5 A breaker and 24 to 12 V converter, the control bus no power. Different power: its own 12/2 feeder on its own 30 A auto-reset breaker (line 2) on the main bus board’s backup-fed bar, apart from the central node’s release feeder and its breaker, with no fuse in the feed: a fuse there would have to pass the burn current (12.5 A per horn, 25 A with both), so it would be about the size of the breaker and protect nothing more, while adding one more part that can blow or corrode open and stop a release. Inside, gland 2’s red lands straight on the 24 V bar (no block 1, no jumper; the strip as built is in the Release Node B plan). Different parts inside: separate Nucleo, firmware instance, converter, enable relay, release bus and MOSFET modules. Different holes and routes: its cables leave through their own glands and travel a different path to the same device, so one chafe point cannot take both paths. Different half of the device: each drogue lid carries two channels (horns A and B), and either one alone does the job. Still shared: the computer in command, and the backup-fed bar, which feeds both: from the main bank, or with the main side dead from the backup converter, one horn at a time with steering paused for the burn.
What the two conditions are. Not two brains agreeing, but one brain doing two physically separate acts: close the enable relay, the only thing that puts 24 V on the release bus, and turn on that channel’s MOSFET, the only return path to ground. Idle, the release bus is dead metal and the return is open. An enable timer drops the bus again if a release command never arrives. That defeats a welded contact, a shorted MOSFET, a stray 24 V wire landing on a release terminal, or a wet terminal block. It does not defeat a Nucleo gone haywire, which is why the drogue and JSD paths also need a signed ground command and have no automatic path at all.
The honest cost of the split. Two chains double the odds a lid opens when it must, and double the number of boxes that can open it when it must not. What holds that second risk down is the signed ground command and the enable timer. There is no idle short across the burn wires: the dead release bus and the open MOSFET are the two conditions.
Why it went (Mike, 2026-10-27: “yes, drop the box”). It was planned when the stern took twenty-plus wires: drogue confirms, bridle switches, pull-pin runs and the aux rudder, all deleted or Boat 2 only. For the twelve left, on three cables that would leave it almost as they came in, it only added two screw joints per wire, in a box on the transom, on the one circuit nobody can fix at sea.
What replaces it. Three cables straight from the central node (Sheet A3, entries 11, 12 and 13). The 14/4 release cable (0.40 in, PG11 at the central node) runs in one piece; near the transom its jacket opens and each drogue’s release pair runs on in a sleeve to its own potted transom gland and lid coils, with no joint. The two 18/4 cord puller cables (0.25 in, PG7 each at the central node), paired by corner, each run in one piece to their quarter and open there to that quarter’s two pullers. Wires, colors and the shield rule: Electronics and Wiring Plan A3; drawing Stern Release Wiring v10.5.
The 9.5 x 5.5 in box on hand is free for another job. Boat 2’s aux-rudder release, if fitted, runs direct the same way.
What it is. A small node on the house bus that switches each wet lab part one at a time and reads the wet lab’s sensors (Mike, 2026-10-14; the layout is Claude’s pick, standing unless Mike says otherwise). Pi A runs the hourly cycle (Flow-Through Wet Lab Design sec 10) and sends orders over CAN; this box does what it is told and refuses anything unsafe. As built, the box plan is the record: Box Plans v10.5/Wet Lab Box v10.5.pdf. Plate layout, wiring, tables and every part with a photo are in that plan; text, parts and hole list: Reference/Wet Lab Box 2026-10-14.
Where. Beside the wet lab, outside its drip tray and above its rim, glands facing down with a drip loop on every cable; within about 5 ft of the USB hub box if it can be (the FTDI cables are 6 ft). Nothing in it goes to the lightning copper. The box: plastic IP67 with a mounting plate, about 12 x 8 x 5 in: the TICONN IP67 box bought 2026-10-03 if it is that size or bigger, else a TICONN box of that size, to buy. No vent: only the central node has one (Mike, 2026-10-16).
Power. In by split gland C, port C3: the wet lab’s own 16/2 line from its 15 A breaker, switched by central node relay channel 2 (Sheet A3) and run straight here on its own 16/2 (Mike, 2026-10-31). Relay channel 2 is on only around each burst (Claude’s pick), so the whole wet lab, this node included, draws nothing between bursts; nothing needs power while idle (valve 2 is shut unpowered, valve 1 stays where it is). The line feeds the XWST converter (24 V steady, 10 A, on hand), with a 1.5KE33CA across its output, and five fuse groups off it, 5 x 20 mm slow-blow in DIN holders (QBGTFAK kit on hand): F1 5 A the Gulper (a guess: read its label), F2 2 A the Iwaki pump and the dosing pump, F3 2 A both valves and their position wires, F4 1 A the DO sensor and the SBE 45, F5 1 A the node, the relay coils and the flow meter. A spare potted Klnuoxj on F5 makes 5 V for the Nucleo and the pressure sensor. A 1N5408 across each pump motor’s two terminals, stripe to +. Wire inside (Mike: “we have lots of 18 guage single wires 22awg singles too”): 22 AWG for signals and the 1 A and 2 A feeds; 18 AWG for the main 24 V path (up to 10 A, the XWST’s limit, runs of inches; 18 AWG hookup wire is good for that unless rated only 60 C, inferred). The XWST’s own leads reach the rail and land as they come, no added wire. 0 V: the XWST’s two black leads split, black in on block 2 top, black out on block 17 top, so pump and valve current goes straight back to the converter (this rests on its two blacks being joined inside; non-isolated, inferred). The 0 V blocks are two bridged bars with a divider (16 to 18 and 19 to 23), joined by one short 22 AWG wire from block 18 top to block 19 bottom. The rail has 38 blocks, up to two wires under one screw in a double ferrule.
The node. A NUCLEO-G431KB (bought: Ken, DigiKey; price not on record) on an AITRIP Nano screw carrier, staked after burn-in, with an SN65HVD230 CAN board (left of the 5 V converter, as built) and a Taidacent RS-12V/2S surge part (one of the two bought 2026-10-07 with no other job) on the house bus drop: a cut Micro-C cord from its own tee, ahead of Release Node B’s end tee, in by split gland A. The surge part stands upright on a short rail of its own at the left end of the plate, above the main rail (no room on the main rail): IN from the CAN drop, OUT to the CAN board, PE to block 2 bottom. Every Nucleo solder link stays as shipped: A2 reaches no chip pin, and A4 and A5 are joined to the I2C pair, so A2, A4 and A5 are not used here. Set the relay module’s trigger jumper the same way as the central node’s modules, then hold it with a dab of removable silicone. As built, the relay board’s COM and NO screws are on its top edge, away from the rail; each relay’s three top screws read NC, COM, NO left to right (printed on the board); COM and NO used, NC empty. The node ID, the 60 s silence rule and the relay channel 2 timing: System Settings Sheet.
| Relay ch | Switches | Rule | Nucleo pin |
|---|---|---|---|
| 1 | Iwaki pump (C1) | Only while valve 2 reads open | D3 |
| 2 | Kamoer dosing pump (C1) | Run time set for 5 mL | D6 |
| 3 | Gulper air pump (C1) | Only while valve 2 reads shut | D7 |
| 4 | Valve 1 open line (C2) | Never with ch 5 | D8 |
| 5 | Valve 1 close line (C2) | Never with ch 4 | D9 |
| 6 | Valve 2 power (C2) | Powered = open; off, it springs shut | D11 |
| 7, 8 | Spare | Later sensors |
Inputs. A spare Fafeicy 8-channel opto board (24 V inputs, 3.3 V out to the Nucleo; the board reads BUCCK_817_8 V1.0): a + and a − screw for each input, no common, so inputs 1− to 5− are joined by short 22 AWG jumpers, one wire on to the 0 V bar; its output strip reads 08 to 01, GND, VCC. IN1 the flow meter’s pulses (the meter on 24 V from F5) to D0; IN2 and IN3 valve 1 open and shut to A1 and A7 (opto output 3 on the carrier’s A7 screw, read by the firmware on A7); IN4 and IN5 valve 2 open and shut to A3 and A6 (the position commons on 24 V from F3); IN6 to 8 spare. The pressure sensor runs on the node’s 5 V; its 0.5 to 4.5 V output goes through 10k on top and 18k to 0 V, so A0 sees 2.9 V at most. The Blue Robotics Celsius probe is on I2C (D4 SDA, D5 SCL) at the Nucleo’s 3.3 V, with 4.7k pull-ups to 3.3 V; the resistors sit under the carrier’s screws. CAN on D2 (TX) and D10 (RX). Read each valve’s wire colors off its label before wiring.
What the node does on its own. At power-on with no message from Pi A for 60 s, it runs one burst by itself (the solo burst, Flow-Through Wet Lab Design sec 10). In the middle of a burst, 60 s with no message: every relay off, so the pump stops and valve 2 springs shut. The pump runs only while valve 2 reads open and the Gulper only while valve 2 reads shut; valve 1’s open and close lines are never on together. Each valve stroke is timed from its position wires and reported: the wear gauge the Wet Lab Design asks for.
The two science cables. The DO sensor’s and the SBE 45’s cables each carry power and data. Both come in here by split gland B: power lands on F4’s terminals, and the data wires join the bare ends of their FTDI cables on terminals (RS-485 for the DO sensor, RS-232 for the SBE 45), which leave by the same split gland for the USB hub box (Sheet A1a). The DO sensor’s FTDI RS-485 cable puts 5 V on its red wire: cut back and tape its red, brown and green here. A run over about 5 ft is extended on screw terminals here with leftover 22/12 shielded cable.
Holes. Three, all on the bottom wall (Mike, 2026-11-07: “yes, 3 split glands”, “24v fits in C”): three Altelix PG25 4-port split glands, each in a 1-1/2 in hole (PG25 thread is 37 mm, 1.46 in). Split gland A: the CAN drop, the flow meter, the pressure sensor, the Celsius probe. Split gland B: the DO sensor, its FTDI cable, the SBE 45, its FTDI cable. Split gland C: C1 the three pumps on one 4/18 shielded cable (on hand, Wire and Cable Buy List C4): white Iwaki +, green Kamoer +, red Gulper +, black one shared − (one pump runs at a time); C2 both valves on one 22/12 shielded cable (on hand, C1), ten cores used, pink and beige spare; C3 the 24 V feed, the 16/2 (Mike’s fit says it seals: the exception to the gland table’s rule that keeps oval 16/2 out of split ports, Mike, 2026-11-07); C4 plugged. Both cable shields to the 0 V bar at this box only. The pump and valve leads join C1 and C2 outside the box with glue-lined heat-shrink butt splices (on hand). The 4/18 and 22/12 core colors are Claude’s pick from the usual sets (the cables’ own codes are not on record); if they differ, the screws stay the same. Each split port takes one round cable 0.15 to 0.30 in; the valve cable must be 0.30 in or less (if bigger, it takes its own PG9 or PG11). Every incoming wire lands on a rail screw except the CAN drop’s white and blue (on the CAN surge part). Open: the third Altelix 4-port: two are free from the dropped aft junction box; whether one is left from the 5-pack is not known; a count of the shelf settles it. To buy: an N2K single tee for the house bus if the shelf has none spare. Left out, with stand-ins: pump current (no current sensor on the boat; the flow rate stands in) and the dosing reservoir level (counted from the doses given).
What it shows. For every releasable device: which chain can release it, and what has to die before nothing can. Solid lines are the node-A chain on the control bus, on its three straight cables to the stern. Dashed lines are the node-B chain on the house bus, running direct.
The main point. The two drogue lids have two chains; the JSD cord pullers ×4 (24 V worm-gear motors, one per T8 trigger) do not. The pullers are driven only by the central node and reach the stern only on their two 18/4 cables, so the node and its cable are single points in series (paired by corner, a dead cable holds one leg of each drogue). A second path for them would need four more channels and new runs to the stern. They can be run backward for testing from shore through relay channel 11 (Sheet A3).
Channel numbers are owned by the Electronics and Wiring Plan sec 4.3: 1 and 2 the drogue lids (horn A central node, horn B Release Node B); 3 to 6 the four JSD cord pullers (central node); 7 to 9 reserved for the Boat 2 aux rudder (unwired); 10 to 15 retired on Boat 1 (Boat 2 keeps one pull-pin); 16 retired (trim decouple, not on this sheet). Pi A commands both chains, so the Pi and the main bank are the two things this split does not protect against; everything after them is doubled for the two drogue lids.
| Device | Path A | Path B | If one chain is lost |
|---|---|---|---|
| Drogue lid 1 | Central node ch 1, the 14/4, entry 11 (PG11) | Release Node B, direct, entry 3 | Either channel alone cuts the strap |
| Drogue lid 2 | Central node ch 2, the 14/4, entry 11 (PG11) | Release Node B, direct, entry 4 | Either channel alone cuts the strap |
| JSD cord pullers ×4 | Central node ch 3 to 6, the two 18/4s, entries 12 and 13 (PG7 each) | none | No release: node and cable are in series |
| Aux-rudder release, Boat 2 only, unwired (ch 7 to 9 reserved) | Central node ch 7 to 9, its own cable if fitted | none | No release: node and cable in series |
| Pull-pins (ch 10 to 15) retired; bridle switches deleted, no gland | |||
Path A entry numbers are Sheet A3 (central node) entries; Path B entries are Sheet A15 entries. Release Node B has no opto board and no short relays: four holes.
The open questions that touch the wiring live in one place, Pending Amendments v10.6 (the open list). On these sheets they are:
Boxes and glands. Which cable takes which of the hub box’s three glands (A1a). The MOTU M2’s own box (A1a). The split gland for Iridium B’s cable at Pi B entry 7 (A2). The Iridium boxes themselves (A11-A, A11-B). Each of the wing box’s three hull cables, so its gland size (A14). The release feeder glands and the bow lantern’s gland at central node entry 7, PG11 or PG13.5, once the 12/2 jacket is measured (A3, A15). Whether the two light converters fit inside the central node box (A3). The wet lab box: the TICONN box on hand if it is about 12 x 8 x 5 in or bigger, else one to buy, and the third Altelix 4-port split gland, if one is left on the shelf (A18). Which long side wall of the battery box the BMS box is on, and how high (A4).
Feeds and parts. Which bus bar stud feeds the hub box, the end stud or the stud table’s 8 (A1a); the wing box is on the backup-fed bar (A14). The 5 V surge diode on the lightning detector lead (A2, A12). Whether Primelink unit B lands on the backup battery board, whose spare spot now holds pump 2’s breaker (A10). The backup converter’s exact cutoff and restart voltages (A10). The gland for Pi B’s wing CAN link at Pi B entry 4 (A2). The wing Cat6’s landing on the hub box’s Waveshare reader (A1a). The Starlink Mini’s power joint to its DC input, and what holds it down (A13). Where pump 2’s signal wires and the two remote wires enter on Pi B’s side, and which relay module switches pump 2’s manual-on (A2). Where WD-B’s voltage divider takes its reading (A2). The Flipsky’s mounting-hole thread (A7). Release Node B’s three Nucleo pins (A15). What the central node’s fourth expander input reads (A3).
Routing and fit. Which way the switch’s right-angle patch cords must point (A6a). Which bulkhead takes the network surge board, near where the lightning copper runs (A6a). The camera port’s UV-C lights (a factory-made board, or the small boards on trial). Where Iridium A’s stub arrestor sits, at the deck stub or at the copper deck terminal (A11-A).
The decided items are drawn in on their sheets.